X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

1156051903002

Well Details

Well ID: 1156051903002
Loading map...
Location: 00/03-19-115-05W6/2
Location Alias: 00/03-19-15-05 W6M
Location Alias 2: 00/03-19-115-05 W6/02
Country: Canada
Province: Alberta
Township: 115
Meridian: 6
Range: 05
Section: 19
County/Municipality: Mackenzie County
Well Name: ACL ZAMA 3-19-115-5
Operator Name: Paramount Resources Ltd.
License Number: 0033326
License Date: 1967-12-21
License Status: Abandoned
Spud Date: 1967-12-27
Final Drill Date: 1968-01-16
Well Total Depth: 1528.00 m
Surface Hole Latitude: 58.995069
Surface Hole Longitude: -118.844333

For data sources see[1][2]

Well History

Date Event
1909-09-09 Well Log Performed
1967-12-21 Obtained License
1968-01-16 Drill Stem Test Performed
1968-01-16 Finished Drilling
1968-01-16 Well Mode changed to Drilled and Cased
1968-01-19 Production Casing Operation Performed
1968-01-25 Drill Stem Test Performed
1968-02-16 Perforation Treatment Performed - Acid Squeeze - Press Used
1968-02-16 Perforation Treatment Performed - Jet Perforation
1969-08-20 Perforation Treatment Performed - Acid Wash - No Pressure
1969-08-20 Perforation Treatment Performed - Open-Hole Completion
1969-08-23 Perforation Treatment Performed - Acid Wash - No Pressure
1969-08-27 Perforation Treatment Performed - Acid Squeeze - Press Used
1969-09-11 Well Log Performed
1969-10-03 Perforation Treatment Performed - Acid Wash - No Pressure
1969-10-03 Well Began Injection
1969-10-03 Well Fluid changed to Water
1969-10-03 Well Type changed to Disposal
1982-12-19 Perforation Treatment Performed - Cement Squeeze
1982-12-19 Well Fluid changed to Water
1982-12-19 Well Mode changed to Abandoned Zone
1982-12-19 Well Type changed to Disposal
1983-01-05 Perforation Treatment Performed - Jet Perforation
1994-09-07 Well Log Performed
1995-09-03 Perforation Treatment Performed - Jet Perforation
1995-09-04 Perforation Treatment Performed - Acid Squeeze - Press Used
1995-09-05 Well Log Performed
1998-11-14 Well Log Performed
1998-11-15 Perforation Treatment Performed - Bridge Plug Capped W/Cement
1998-11-15 Perforation Treatment Performed - Jet Perforation
1998-11-15 Plug Back Performed
1998-11-16 Perforation Treatment Performed - Acid Squeeze - Press Used
2001-07-01 Perforation Treatment Performed - Cement Squeeze
2001-07-03 Perforation Treatment Performed - Jet Perforation
2001-07-05 Perforation Treatment Performed - Acid Squeeze - Press Used
2001-07-11 Perforation Treatment Performed - Jet Perforation
2001-07-11 Well Log Performed
2001-07-12 Perforation Treatment Performed - Acid Squeeze - Press Used
2009-03-21 Perforation Treatment Performed - Bridge Plug Capped W/Cement
2009-03-21 Plug Back Performed
2009-03-22 Well Log Performed
2010-12-08 Perforation Treatment Performed - Cement Plug
2010-12-08 Plug Back Performed
2010-12-08 Well Log Performed
2010-12-09 Perforation Treatment Performed - Jet Perforation
2010-12-10 Perforation Treatment Performed - Bridge Plug Capped W/Cement
2010-12-10 Perforation Treatment Performed - Remedial Casing
2010-12-10 Well Log Performed
2010-12-11 Perforation Treatment Performed - Acid Squeeze - Press Used
2010-12-11 Perforation Treatment Performed - Bridge Plug Capped W/Cement
2010-12-11 Perforation Treatment Performed - Jet Perforation
2010-12-11 Perforation Treatment Performed - Remedial Casing
2010-12-13 Well Abandoned

For data sources see[3]


Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
1968-02-16 Perforation 1471.30 1472.80 7
1983-01-05 Perforation 1467.00 1469.00 7
1995-09-03 Perforation 1463.00 1464.60 13
1995-09-03 Perforation 1467.00 1469.00 13
1995-09-03 Perforation 1471.30 1472.80 13
1995-09-04 Acid Treatment 1463.00 1472.80 0
1998-11-15 Packing Device Capped w/Cement 1451.00 1459.00 0
1998-11-15 Perforation 1271.00 1277.00 14
1998-11-16 Acid Treatment 1271.00 1277.00 0
2001-07-01 Cement Squeeze 1271.00 1277.00 0
2001-07-03 Perforation 1346.30 1347.80 13
1968-02-16 Acid Treatment 1471.30 1472.80 0
2001-07-03 Perforation 1348.70 1349.70 13
2001-07-03 Perforation 1357.60 1358.50 13
2001-07-03 Perforation 1359.40 1361.20 13
2001-07-05 Acid Treatment 1346.30 1361.20 0
2001-07-11 Perforation 1271.00 1272.20 13
2001-07-12 Acid Treatment 1271.00 1272.20 0
2009-03-21 Packing Device Capped w/Cement 1260.00 1268.00 0
2009-03-21 Packing Device Capped w/Cement 1335.00 1343.00 0
2010-12-08 Cement Plug 1228.00 1260.00 0
2010-12-09 Perforation 652.00 653.00 17
1969-08-20 Acid Wash 1471.30 1472.80 0
2010-12-10 Remedial Casing Cementing 652.00 653.00 0
2010-12-10 Packing Device Capped w/Cement 638.80 646.80 0
2010-12-11 Perforation 307.00 308.00 17
2010-12-11 Acid Treatment 307.00 308.00 0
2010-12-11 Remedial Casing Cementing 307.00 308.00 0
2010-12-11 Packing Device Capped w/Cement 292.00 300.00 0
1969-08-20 Open Hole/Barefoot Completion 1476.50 1527.70 0
1969-08-23 Acid Wash 1502.70 1524.00 13
1969-08-27 Acid Treatment 1471.00 1472.80 13
1969-08-27 Acid Treatment 1471.00 1472.80 0
1969-10-03 Acid Wash 1503.60 1527.70 0
1982-12-19 Cement Squeeze 1476.50 1527.70 0

For data sources see[4]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
1969 0 0.0 0.0 0.0
1970 0 0.0 0.0 0.0
1971 0 0.0 0.0 0.0
1972 0 0.0 0.0 0.0
1973 0 0.0 0.0 0.0
1974 0 0.0 0.0 0.0
1975 0 0.0 0.0 0.0
1976 0 0.0 0.0 0.0
1977 0 0.0 0.0 0.0
1978 0 0.0 0.0 0.0
1979 0 0.0 0.0 0.0
1980 0 0.0 0.0 0.0
1981 0 0.0 0.0 0.0
1982 0 0.0 0.0 0.0

For data sources see[5]

References