X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

1156051815003

Well Details

Well ID: 1156051815003
Loading map...
Location: 00/15-18-115-05W6/3
Location Alias: 00/15-18-15-05 W6M
Location Alias 2: 00/15-18-115-05 W6/03
Country: Canada
Province: Alberta
Township: 115
Meridian: 6
Range: 05
Section: 18
County/Municipality: Mackenzie County
Well Name: ACL ET AL VIRGO 15-18-115-5
Operator Name: Paramount Resources Ltd.
License Number: 0035477
License Date: 1968-12-19
License Status: Abandoned
Spud Date: 1969-01-13
Final Drill Date: 1969-02-23
Well Total Depth: 1641.00 m
Surface Hole Latitude: 58.991748
Surface Hole Longitude: -118.832999

For data sources see[1][2]

Well History

Date Event
1909-09-09 Well Log Performed
1968-12-19 Obtained License
1969-02-02 Drill Stem Test Performed
1969-02-05 Drill Stem Test Performed
1969-02-08 Well Log Performed
1969-02-15 Drill Stem Test Performed
1969-02-18 Drill Stem Test Performed
1969-02-23 Finished Drilling
1969-02-23 Well Log Performed
1969-02-23 Well Mode changed to Drilled and Cased
1969-02-25 Liner Casing Operation Performed
1969-03-26 Well Log Performed
1969-04-13 Perforation Treatment Performed - Jet Perforation
1969-04-14 Perforation Treatment Performed - Acid Squeeze - Press Used
1969-12-31 Perforation Treatment Performed - Cement Squeeze
1970-01-27 Perforation Treatment Performed - Acid Squeeze - Press Used
1970-07-14 Perforation Treatment Performed - Acid Squeeze - Press Used
1970-09-26 Perforation Treatment Performed - Acid Squeeze - Press Used
1970-10-28 Perforation Treatment Performed - Acid Squeeze - Press Used
1970-12-10 Perforation Treatment Performed - Selective Jet Perforations
1970-12-11 Perforation Treatment Performed - Acid Squeeze - Press Used
1973-07-20 Perforation Treatment Performed - Cement Squeeze
1973-07-21 Perforation Treatment Performed - Cement Squeeze
1973-07-27 Perforation Treatment Performed - Acid Squeeze - Press Used
1973-07-27 Perforation Treatment Performed - Jet Perforation
1997-09-02 Perforation Treatment Performed - Bridge Plug Capped W/Cement
1997-09-02 Perforation Treatment Performed - Jet Perforation
1997-09-02 Plug Back Performed
1997-09-03 Perforation Treatment Performed - Acid Squeeze - Press Used
1998-09-01 Perforation Treatment Performed - Acid Squeeze - Press Used
1999-12-08 Perforation Treatment Performed - Jet Perforation
1999-12-08 Well Log Performed
1999-12-10 Perforation Treatment Performed - Bridge Plug Capped W/Cement
1999-12-10 Plug Back Performed
1999-12-10 Well Log Performed
1999-12-11 Perforation Treatment Performed - Acid Squeeze - Press Used
1999-12-20 Well Began Production
1999-12-20 Well Fluid changed to Gas
1999-12-20 Well Mode changed to Flowing
2003-11-01 Well Fluid changed to Gas
2003-11-01 Well Mode changed to Pumping
2010-05-01 Well Fluid changed to Gas
2010-05-01 Well Mode changed to Suspended
2014-01-06 Well Log Performed
2014-01-07 Well Log Performed
2014-12-04 Well Log Performed
2014-12-05 Well Log Performed
2014-12-06 Perforation Treatment Performed - Bridge Plug Capped W/Cement
2014-12-06 Perforation Treatment Performed - Jet Perforation
2014-12-06 Plug Back Performed
2014-12-06 Well Fluid changed to Gas
2014-12-06 Well Log Performed
2014-12-06 Well Mode changed to Abandoned Zone
2014-12-09 Perforation Treatment Performed - Remedial Casing
2014-12-15 Perforation Treatment Performed - Bridge Plug Capped W/Cement
2014-12-15 Well Log Performed
2014-12-16 Perforation Treatment Performed - Jet Perforation
2014-12-16 Well Log Performed
2014-12-17 Perforation Treatment Performed - Bridge Plug Capped W/Cement
2014-12-17 Perforation Treatment Performed - Remedial Casing
2014-12-18 Perforation Treatment Performed - Acid Squeeze - Press Used
2014-12-18 Perforation Treatment Performed - Jet Perforation
2014-12-18 Well Log Performed
2014-12-19 Perforation Treatment Performed - Acid Squeeze - Press Used
2014-12-20 Perforation Treatment Performed - Bridge Plug Capped W/Cement
2014-12-20 Perforation Treatment Performed - Remedial Casing
2015-01-06 Perforation Treatment Performed - Jet Perforation
2015-01-06 Well Log Performed
2015-01-07 Perforation Treatment Performed - Acid Squeeze - Press Used
2015-01-08 Perforation Treatment Performed - Remedial Casing
2015-01-09 Perforation Treatment Performed - Bridge Plug Capped W/Cement
2015-02-04 Well Abandoned
2015-02-04 Well Fluid changed to Gas
2015-02-04 Well Mode changed to Abandoned

For data sources see[3]


Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
1969-04-13 Perforation 1549.90 1554.50 7
1970-12-10 Selective Jet Perforations 1532.80 1532.80 0
1970-12-11 Acid Treatment 1530.40 1532.80 0
1973-07-20 Cement Squeeze 1530.40 1532.80 0
1973-07-21 Cement Squeeze 1488.60 1493.50 0
1973-07-27 Perforation 1530.40 1532.80 7
1973-07-27 Acid Treatment 1530.40 1532.80 0
1997-09-02 Packing Device Capped w/Cement 1472.00 1480.00 0
1997-09-02 Perforation 1349.30 1350.30 13
1997-09-02 Perforation 1353.30 1356.40 13
1997-09-02 Perforation 1357.50 1358.50 13
1969-04-13 Perforation 1488.60 1493.50 7
1997-09-02 Perforation 1364.30 1366.70 13
1997-09-03 Acid Treatment 1349.30 1366.70 0
1998-09-01 Acid Treatment 1349.30 1366.70 0
1999-12-08 Perforation 1268.60 1274.60 13
1999-12-08 Perforation 1282.60 1286.60 13
1999-12-10 Packing Device Capped w/Cement 1338.80 1346.80 0
1999-12-11 Acid Treatment 1268.60 1286.60 0
2014-12-06 Packing Device Capped w/Cement 1255.00 1263.00 0
2014-12-06 Perforation 1150.00 1151.00 17
2014-12-09 Remedial Casing Cementing 1150.00 1151.00 0
1969-04-14 Acid Treatment 1488.60 1554.50 0
2014-12-15 Packing Device Capped w/Cement 663.00 671.00 0
2014-12-16 Perforation 644.00 645.00 17
2014-12-17 Remedial Casing Cementing 644.00 645.00 0
2014-12-17 Packing Device Capped w/Cement 629.00 637.00 0
2014-12-18 Acid Treatment 295.00 296.00 0
2014-12-18 Perforation 295.00 296.00 17
2014-12-19 Acid Treatment 295.00 296.00 0
2014-12-20 Remedial Casing Cementing 295.00 296.00 0
2014-12-20 Packing Device Capped w/Cement 282.00 290.00 0
2015-01-06 Perforation 268.00 269.00 99
1969-12-31 Cement Squeeze 1549.90 1554.50 0
2015-01-07 Acid Treatment 268.00 269.00 0
2015-01-08 Remedial Casing Cementing 268.00 269.00 0
2015-01-09 Packing Device Capped w/Cement 257.00 265.00 0
1970-01-27 Acid Treatment 1488.60 1493.50 0
1970-07-14 Acid Treatment 1488.60 1493.50 0
1970-09-26 Acid Treatment 1488.60 1493.50 0
1970-10-28 Acid Treatment 1488.60 1493.50 0
1970-12-10 Selective Jet Perforations 1530.40 1531.60 0

For data sources see[4]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
1999 284 0.0 0.0 0.0
2000 8398 0.0 0.0 0.0
2001 4780 0.0 0.0 0.0
2003 1241 0.0 0.0 0.0
2004 2559 0.0 0.0 0.0

For data sources see[5]

Occurences

Occurence Date Occurence Type Occurence Depth (m) Occurence Control Depth (m)
2015-02-04 No Incident Encountered 0.00 0.00

For data sources see[6]

References