X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

1156051505000

Well Details

Well ID: 1156051505000
Loading map...
Location: 00/05-15-115-05W6/0
Location Alias: 00/05-15-15-05 W6M
Location Alias 2: 00/05-15-115-05 W6/00
Country: Canada
Province: Alberta
Township: 115
Meridian: 6
Range: 05
Section: 15
County/Municipality: Mackenzie County
Well Name: ACL VIRGO 5-15-115-5
Operator Name: Paramount Resources Ltd.
License Number: 0033690
License Date: 1968-02-19
License Status: Abandoned
Spud Date: 1968-03-04
Final Drill Date: 1968-03-24
Well Total Depth: 1495.00 m
Surface Hole Latitude: 58.985507
Surface Hole Longitude: -118.767474

For data sources see[1][2]

Well History

Date Event
1909-09-09 Well Log Performed
1968-02-19 Obtained License
1968-03-16 Drill Stem Test Performed
1968-03-17 Drill Stem Test Performed
1968-03-19 Drill Stem Test Performed
1968-03-20 Drill Stem Test Performed
1968-03-22 Production Casing Operation Performed
1968-03-24 Finished Drilling
1968-03-24 Well Mode changed to Drilled and Cased
1968-03-25 Drill Stem Test Performed
1968-04-26 Perforation Treatment Performed - Acid Squeeze - Press Used
1968-04-26 Perforation Treatment Performed - Jet Perforation
1968-04-27 Well Began Production
1968-04-27 Well Fluid changed to Crude Oil
1968-04-27 Well Mode changed to Flowing
1969-06-06 Well Fluid changed to Crude Oil
1969-06-06 Well Mode changed to Pumping
1970-04-05 Perforation Treatment Performed - Cement Squeeze
1970-04-06 Perforation Treatment Performed - Cement Squeeze
1970-04-07 Perforation Treatment Performed - Acid Squeeze - Press Used
1970-04-07 Perforation Treatment Performed - Jet Perforation
1970-04-07 Well Log Performed
1985-03-19 Well Log Performed
1985-03-20 Perforation Treatment Performed - Cement Squeeze
1985-03-22 Well Log Performed
1985-03-24 Perforation Treatment Performed - Acid Squeeze - Press Used
1985-03-24 Perforation Treatment Performed - Jet Perforation
1985-03-26 Perforation Treatment Performed - Acid Squeeze - Press Used
1999-01-10 Perforation Treatment Performed - Bridge Plug Capped W/Cement
1999-01-10 Perforation Treatment Performed - Jet Perforation
1999-01-10 Plug Back Performed
1999-01-10 Well Log Performed
1999-01-11 Perforation Treatment Performed - Acid Squeeze - Press Used
1999-01-11 Well Fluid changed to Crude Oil
1999-01-11 Well Mode changed to Abandoned Zone
2003-03-30 Perforation Treatment Performed - Bridge Plug Capped W/Cement
2003-03-30 Plug Back Performed
2003-03-30 Well Log Performed
2003-03-31 Perforation Treatment Performed - Jet Perforation
2003-03-31 Well Log Performed
2003-04-01 Perforation Treatment Performed - Remedial Casing
2003-04-03 Perforation Treatment Performed - Jet Perforation
2003-04-03 Well Log Performed
2003-04-05 Perforation Treatment Performed - Fractured
2005-08-20 Perforation Treatment Performed - Jet Perforation
2005-08-22 Perforation Treatment Performed - Jet Perforation
2005-08-22 Well Log Performed
2005-08-23 Perforation Treatment Performed - Acid Squeeze - Press Used
2012-10-09 Perforation Treatment Performed - Bridge Plug Capped W/Cement
2012-10-09 Plug Back Performed
2012-10-09 Well Log Performed
2012-10-10 Perforation Treatment Performed - Bridge Plug Capped W/Cement
2012-10-10 Plug Back Performed
2012-10-11 Perforation Treatment Performed - Jet Perforation
2012-10-12 Perforation Treatment Performed - Acid Squeeze - Press Used
2012-10-13 Perforation Treatment Performed - Bridge Plug Capped W/Cement
2012-10-13 Perforation Treatment Performed - Jet Perforation
2012-10-13 Perforation Treatment Performed - Remedial Casing
2012-10-13 Well Log Performed
2012-10-14 Perforation Treatment Performed - Acid Squeeze - Press Used
2012-10-14 Perforation Treatment Performed - Cement Squeeze
2012-10-14 Perforation Treatment Performed - Remedial Casing
2012-10-14 Plug Back Performed
2012-10-16 Perforation Treatment Performed - Bridge Plug Capped W/Cement
2012-10-16 Perforation Treatment Performed - Jet Perforation
2012-10-17 Perforation Treatment Performed - Acid Squeeze - Press Used
2012-10-18 Perforation Treatment Performed - Bridge Plug Capped W/Cement
2012-10-30 Well Abandoned

For data sources see[3]


Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
1968-04-26 Perforation 1458.50 1461.50 7
1985-03-24 Perforation 1445.30 1447.70 7
1985-03-24 Acid Treatment 1445.30 1447.70 0
1985-03-26 Acid Treatment 1445.30 1447.70 0
1999-01-10 Packing Device Capped w/Cement 1435.00 1443.00 0
1999-01-10 Perforation 1249.00 1254.50 13
1999-01-11 Acid Treatment 1249.00 1254.50 0
2003-03-30 Packing Device Capped w/Cement 1237.00 1245.00 0
2003-03-31 Perforation 330.00 331.00 17
2003-03-31 Perforation 330.30 330.60 17
2003-04-01 Remedial Casing Cementing 330.00 331.00 0
1968-04-26 Acid Treatment 1458.50 1461.50 0
2003-04-03 Perforation 285.90 288.30 13
2003-04-03 Perforation 292.00 295.00 13
2003-04-05 Fracture 285.90 295.00 0
2005-08-20 Perforation 1249.00 1254.50 13
2005-08-22 Perforation 1328.60 1331.40 13
2005-08-23 Acid Treatment 1328.60 1331.40 0
2012-10-09 Packing Device Capped w/Cement 1317.00 1325.00 0
2012-10-10 Packing Device Capped w/Cement 1236.00 1244.00 0
2012-10-11 Perforation 627.00 628.00 99
2012-10-12 Acid Treatment 627.00 628.00 0
1970-04-05 Cement Squeeze 1458.50 1461.50 0
2012-10-13 Remedial Casing Cementing 627.00 628.00 0
2012-10-13 Packing Device Capped w/Cement 613.00 623.00 0
2012-10-13 Perforation 275.00 276.00 17
2012-10-14 Cement Squeeze 285.90 295.00 0
2012-10-14 Remedial Casing Cementing 275.00 276.00 0
2012-10-14 Acid Treatment 275.00 276.00 0
2012-10-16 Perforation 244.00 245.00 99
2012-10-16 Packing Device Capped w/Cement 264.00 272.00 0
2012-10-17 Acid Treatment 244.00 245.00 0
2012-10-18 Packing Device Capped w/Cement 232.00 240.00 0
1970-04-06 Cement Squeeze 1458.50 1461.50 0
1970-04-07 Perforation 1445.40 1446.60 7
1970-04-07 Perforation 1447.80 1449.00 7
1970-04-07 Perforation 1450.80 1452.10 7
1970-04-07 Acid Treatment 1445.40 1452.10 0
1985-03-20 Cement Squeeze 1445.40 1452.10 0

For data sources see[4]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
1968 1200 0.0 0.0 0.0
1969 4007 0.0 0.0 0.0
1970 3937 0.0 0.0 0.0
1971 2024 0.0 0.0 0.0
1972 4820 0.0 0.0 0.0
1973 4985 0.0 0.0 0.0
1974 6912 0.0 0.0 0.0
1975 6939 0.0 0.0 0.0
1976 7431 0.0 0.0 0.0
1977 8166 0.0 0.0 0.0
1978 8370 0.0 0.0 0.0
1979 7799 0.0 0.0 0.0
1980 7006 0.0 0.0 0.0
1981 7589 0.0 0.0 0.0
1982 7892 0.0 0.0 0.0
1983 7500 0.0 0.0 0.0
1984 7675 0.0 0.0 0.0
1985 6846 0.0 0.0 0.0
1986 8326 0.0 0.0 0.0
1987 7965 0.0 0.0 0.0
1988 8219 0.0 0.0 0.0
1989 8146 0.0 0.0 0.0
1990 7576 0.0 0.0 0.0
1991 8227 0.0 0.0 0.0
1992 8398 0.0 0.0 0.0
1993 8417 0.0 0.0 0.0
1994 7957 0.0 0.0 0.0
1995 8643 0.0 0.0 0.0
1996 8752 0.0 0.0 0.0
1997 2750 0.0 0.0 0.0

For data sources see[5]

Occurences

Occurence Date Occurence Type Occurence Depth (m) Occurence Control Depth (m)
2012-10-30 No Incident Encountered 0.00 0.00

For data sources see[6]

References