X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

1156050916020

Well Details

Well ID: 1156050916020
Loading map...
Location: 02/16-09-115-05W6/0
Location Alias: 02/16-09-15-05 W6M
Location Alias 2: 02/16-09-115-05 W6/00
Country: Canada
Province: Alberta
Township: 115
Meridian: 6
Range: 05
Section: 09
County/Municipality: Mackenzie County
Well Name: ACL 102 MU VIRGO 16-9-115-5
Operator Name: Paramount Resources Ltd.
License Number: 0137883
License Date: 1988-12-29
License Status: Abandoned
Spud Date: 1989-01-30
Final Drill Date: 1989-07-22
Well Total Depth: 1540.30 m
Surface Hole Latitude: 58.978070
Surface Hole Longitude: -118.775356

For data sources see[1][2]

Well History

Date Event
1988-12-29 Obtained License
1989-01-31 Surface Casing Operation Performed
1989-02-02 Kick Occurred
1989-02-08 Well Log Performed
1989-02-10 Intermediate Casing Operation Performed
1989-02-10 Lost Circulation Occurred
1989-07-22 Finished Drilling
1989-07-22 Well Mode changed to Drilled and Cased
1989-07-23 Well Log Performed
1989-07-26 Liner Casing Operation Performed
1989-07-29 Well Log Performed
1989-07-30 Well Log Performed
1989-08-02 Perforation Treatment Performed - Acid Squeeze - Press Used
1989-08-02 Perforation Treatment Performed - Jet Perforation
1989-08-02 Perforation Treatment Performed - Remedial Casing
1989-08-02 Well Log Performed
1989-08-05 Perforation Treatment Performed - Acid Squeeze - Press Used
1989-08-05 Perforation Treatment Performed - Jet Perforation
1989-08-05 Perforation Treatment Performed - Remedial Casing
1989-08-05 Well Log Performed
1989-08-08 Perforation Treatment Performed - Jet Perforation
1989-08-08 Well Log Performed
1989-08-13 Rig Released
1989-08-24 Well Began Production
1989-08-24 Well Fluid changed to Crude Oil
1989-08-24 Well Mode changed to Pumping
1995-06-01 Well Fluid changed to Crude Oil
1995-06-01 Well Mode changed to Suspended
1997-11-10 Well Fluid changed to Crude Oil
1997-11-10 Well Mode changed to Abandoned Zone
1997-11-11 Perforation Treatment Performed - Bridge Plug Capped W/Cement
1997-11-11 Plug Back Performed
1997-11-11 Well Log Performed
1997-11-12 Perforation Treatment Performed - Jet Perforation
1997-11-13 Perforation Treatment Performed - Acid Squeeze - Press Used
2006-05-13 Well Log Performed
2006-05-14 Perforation Treatment Performed - Jet Perforation
2006-05-16 Perforation Treatment Performed - Acid Squeeze - Press Used
2010-03-27 Well Log Performed
2010-03-28 Perforation Treatment Performed - Bridge Plug Capped W/Cement
2010-03-28 Well Log Performed
2010-03-29 Perforation Treatment Performed - Bridge Plug Capped W/Cement
2010-03-29 Plug Back Performed
2010-03-29 Well Log Performed
2010-03-30 Perforation Treatment Performed - Bridge Plug Capped W/Cement
2010-03-30 Plug Back Performed
2010-03-31 Perforation Treatment Performed - Jet Perforation
2010-04-01 Perforation Treatment Performed - Bridge Plug Capped W/Cement
2010-04-01 Perforation Treatment Performed - Remedial Casing
2012-11-11 Well Log Performed
2013-03-21 Perforation Treatment Performed - Jet Perforation
2013-03-21 Well Log Performed
2013-03-22 Perforation Treatment Performed - Remedial Casing
2013-03-23 Perforation Treatment Performed - Packing Dev CPD W/Res-GYP Cem
2013-03-23 Well Log Performed
2013-03-25 Well Abandoned

For data sources see[3]


Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
1989-08-02 Perforation 525.00 526.00 13
1997-11-13 Acid Treatment 1251.00 1259.00 0
2006-05-14 Perforation 1329.00 1329.50 14
2006-05-14 Perforation 1334.50 1336.50 14
2006-05-16 Acid Treatment 1329.00 1336.50 0
2010-03-28 Packing Device Capped w/Cement 1352.60 1388.50 0
2010-03-29 Packing Device Capped w/Cement 1311.50 1319.50 0
2010-03-30 Packing Device Capped w/Cement 1232.00 1240.00 0
2010-03-31 Perforation 284.00 285.00 17
2010-04-01 Remedial Casing Cementing 284.00 285.00 0
2010-04-01 Packing Device Capped w/Cement 271.30 279.30 0
1989-08-02 Acid Treatment 525.00 526.00 0
2013-03-21 Perforation 189.00 190.00 17
2013-03-22 Remedial Casing Cementing 189.00 190.00 0
2013-03-23 Packing Dev Cpd w/Res-Gyp Cem 184.00 187.00 0
1989-08-02 Remedial Casing Cementing 525.00 526.00 0
1989-08-05 Perforation 275.00 276.00 13
1989-08-05 Acid Treatment 275.00 276.00 0
1989-08-05 Remedial Casing Cementing 275.00 276.00 0
1989-08-08 Perforation 1450.00 1455.00 13
1997-11-11 Packing Device Capped w/Cement 1437.00 1445.00 0
1997-11-12 Perforation 1251.00 1259.00 13

For data sources see[4]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
1989 2694 0.0 0.0 0.0
1990 8172 0.0 0.0 0.0
1991 7893 0.0 0.0 0.0
1992 7752 0.0 0.0 0.0
1993 8257 0.0 0.0 0.0
1994 8015 0.0 0.0 0.0
1995 2920 0.0 0.0 0.0

For data sources see[5]

Occurences

Occurence Date Occurence Type Occurence Depth (m) Occurence Control Depth (m)
1989-02-02 Kick 641.00 641.00
1989-02-10 Lost Circulation 1421.90 1421.90
2013-03-27 No Incident Encountered 0.00 0.00

For data sources see[6]

References