X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

1156043013003

Well Details

Well ID: 1156043013003
Loading map...
Location: 00/13-30-115-04W6/3
Location Alias: 00/13-30-15-04 W6M
Location Alias 2: 00/13-30-115-04 W6/03
Country: Canada
Province: Alberta
Township: 115
Meridian: 6
Range: 04
Section: 30
County/Municipality: Mackenzie County
Well Name: ACL LARNE 13-30-115-4
Operator Name: Paramount Resources Ltd.
License Number: 0115996
License Date: 1985-07-10
License Status: Abandoned
Spud Date: 1985-07-14
Final Drill Date: 1985-07-25
Well Total Depth: 1470.00 m
Surface Hole Latitude: 59.021017
Surface Hole Longitude: -118.678920

For data sources see[1][2]

Well History

Date Event
1985-07-10 Obtained License
1985-07-15 Surface Casing Operation Performed
1985-07-25 Finished Drilling
1985-07-25 Well Mode changed to Drilled and Cased
1985-07-26 Well Log Performed
1985-07-27 Drill Stem Test Performed
1985-07-28 Production Casing Operation Performed
1985-07-29 Rig Released
1985-08-17 Perforation Treatment Performed - Jet Perforation
1985-10-12 Perforation Treatment Performed - Chemical Squeeze
1985-10-24 Well Log Performed
1994-04-09 Perforation Treatment Performed - Bridge Plug Capped W/Cement
1994-04-09 Plug Back Performed
1994-04-09 Well Log Performed
1997-04-01 Perforation Treatment Performed - Jet Perforation
1997-04-06 Perforation Treatment Performed - Acid Squeeze - Press Used
1997-07-04 Perforation Treatment Performed - Jet Perforation
1997-07-15 Well Began Production
1997-07-15 Well Fluid changed to Gas
1997-07-15 Well Mode changed to Flowing
1998-07-01 Well Fluid changed to Gas
1998-07-01 Well Mode changed to Suspended
1998-07-02 Well Fluid changed to Gas
1998-07-02 Well Mode changed to Suspended
2000-01-26 Well Fluid changed to Gas
2000-01-26 Well Mode changed to Flowing
2010-05-01 Well Fluid changed to Gas
2010-05-01 Well Mode changed to Suspended
2010-08-27 Perforation Treatment Performed - Bridge Plug Capped W/Cement
2010-08-27 Plug Back Performed
2010-08-28 Well Log Performed
2010-08-29 Perforation Treatment Performed - Bridge Plug Capped W/Cement
2010-08-29 Plug Back Performed
2010-08-29 Well Fluid changed to Gas
2010-08-29 Well Mode changed to Abandoned Zone
2010-08-30 Perforation Treatment Performed - Acid Squeeze - Press Used
2010-08-30 Perforation Treatment Performed - Bridge Plug Capped W/Cement
2010-08-30 Perforation Treatment Performed - Jet Perforation
2010-08-31 Perforation Treatment Performed - Bridge Plug Capped W/Cement
2010-08-31 Perforation Treatment Performed - Remedial Casing
2010-09-10 Well Abandoned
2010-09-10 Well Fluid changed to Gas
2010-09-10 Well Mode changed to Abandoned

For data sources see[3]


Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
1985-08-17 Perforation 1431.50 1438.00 13
2010-08-29 Packing Device Capped w/Cement 1235.00 1243.00 0
2010-08-30 Acid Treatment 287.00 288.00 0
2010-08-30 Packing Device Capped w/Cement 600.00 608.00 0
2010-08-30 Perforation 287.00 288.00 17
2010-08-31 Remedial Casing Cementing 287.00 288.00 0
2010-08-31 Packing Device Capped w/Cement 272.20 285.00 0
1985-10-12 Chemical Squeeze 1431.50 1438.00 0
1994-04-09 Packing Device Capped w/Cement 1419.00 1427.00 0
1997-04-01 Perforation 1316.50 1319.50 13
1997-04-01 Perforation 1322.00 1324.50 13
1997-04-06 Acid Treatment 1316.50 1324.50 0
1997-07-04 Perforation 1246.30 1249.00 14
1997-07-04 Perforation 1251.50 1255.00 14
2010-08-27 Packing Device Capped w/Cement 1297.20 1305.20 0

For data sources see[4]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
1997 313 0.0 0.0 0.0
1998 2115 0.0 0.0 0.0
2000 2750 0.0 0.0 0.0
2001 3892 0.0 0.0 0.0
2002 7653 0.0 0.0 0.0
2003 4427 0.0 0.0 0.0

For data sources see[5]

References