X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

1146063405000

Well Details

Well ID: 1146063405000
Loading map...
Location: 00/05-34-114-06W6/0
Location Alias: 00/05-34-14-06 W6M
Location Alias 2: 00/05-34-114-06 W6/00
Country: Canada
Province: Alberta
Township: 114
Meridian: 6
Range: 06
Section: 34
County/Municipality: Mackenzie County
Well Name: ACL VIRGO 5-34-114-6
Operator Name: Paramount Resources Ltd.
License Number: 0034748
License Date: 1968-09-05
License Status: Abandoned
Spud Date: 1968-09-12
Final Drill Date: 1968-09-30
Well Total Depth: 1569.10 m
Surface Hole Latitude: 58.939797
Surface Hole Longitude: -118.925623

For data sources see[1][2]

Well History

Date Event
1909-09-09 Well Log Performed
1968-09-05 Obtained License
1968-09-26 Drill Stem Test Performed
1968-09-30 Finished Drilling
1968-09-30 Well Mode changed to Drilled and Cased
1968-10-03 Liner Casing Operation Performed
1968-10-09 Perforation Treatment Performed - Jet Perforation
1968-10-09 Well Log Performed
1968-10-10 Perforation Treatment Performed - Acid Squeeze - Press Used
1968-10-10 Well Began Production
1968-10-10 Well Fluid changed to Crude Oil
1968-10-10 Well Mode changed to Flowing
1976-04-06 Perforation Treatment Performed - Acid Squeeze - Press Used
1980-05-28 Perforation Treatment Performed - Acid Squeeze - Press Used
1987-12-14 Well Log Performed
1988-03-17 Perforation Treatment Performed - Jet Perforation
1988-03-18 Perforation Treatment Performed - Acid Squeeze - Press Used
1988-03-26 Perforation Treatment Performed - Cement Squeeze
1988-03-30 Perforation Treatment Performed - Acid Squeeze - Press Used
1988-03-30 Perforation Treatment Performed - Jet Perforation
1988-05-13 Well Log Performed
1988-05-14 Perforation Treatment Performed - Jet Perforation
1988-05-16 Perforation Treatment Performed - Acid Squeeze - Press Used
1988-10-20 Well Fluid changed to Crude Oil
1988-10-20 Well Mode changed to Pumping
1992-03-20 Well Log Performed
1992-03-21 Perforation Treatment Performed - Cement Squeeze
1992-03-22 Perforation Treatment Performed - Jet Perforation
1992-03-22 Well Log Performed
1992-03-23 Perforation Treatment Performed - Cement Plug
1992-03-23 Well Log Performed
1992-03-24 Perforation Treatment Performed - Cement Squeeze
1992-03-26 Perforation Treatment Performed - Jet Perforation
1992-03-27 Perforation Treatment Performed - Acid Squeeze - Press Used
1994-07-17 Perforation Treatment Performed - Cement Squeeze
1994-08-21 Perforation Treatment Performed - Cement Squeeze
1994-08-26 Perforation Treatment Performed - Jet Perforation
1994-08-27 Perforation Treatment Performed - Acid Squeeze - Press Used
1994-09-01 Well Log Performed
1995-02-15 Well Began Injection
1995-02-15 Well Fluid changed to Water
1995-02-15 Well Type changed to Disposal
1997-09-15 Perforation Treatment Performed - Bridge Plug Capped W/Cement
1997-09-15 Perforation Treatment Performed - Jet Perforation
1997-09-15 Plug Back Performed
1997-09-15 Well Log Performed
1997-09-16 Well Log Performed
1997-09-17 Well Log Performed
1997-09-20 Perforation Treatment Performed - Bridge Plug Capped W/Cement
1997-09-20 Perforation Treatment Performed - Jet Perforation
1997-09-20 Plug Back Performed
1997-09-21 Perforation Treatment Performed - Acid Squeeze - Press Used
1997-11-01 Well Fluid changed to Water
1997-11-01 Well Type changed to Disposal
1998-08-15 Perforation Treatment Performed - Bridge Plug Capped W/Cement
1998-08-15 Perforation Treatment Performed - Jet Perforation
1998-08-15 Plug Back Performed
1998-08-15 Well Fluid changed to Water
1998-08-15 Well Type changed to Disposal
1998-08-16 Perforation Treatment Performed - Acid Squeeze - Press Used
1998-09-13 Well Fluid changed to Water
1998-09-13 Well Type changed to Disposal
2004-11-03 Well Log Performed
2004-11-05 Perforation Treatment Performed - Cement Squeeze
2004-11-05 Plug Back Performed
2004-11-09 Perforation Treatment Performed - Jet Perforation
2004-11-10 Perforation Treatment Performed - Cement Squeeze
2004-11-10 Plug Back Performed
2004-11-17 Perforation Treatment Performed - Jet Perforation
2004-11-18 Perforation Treatment Performed - Cement Squeeze
2004-11-24 Perforation Treatment Performed - Jet Perforation
2004-12-01 Well Log Performed
2004-12-02 Well Log Performed
2004-12-03 Perforation Treatment Performed - Jet Perforation
2004-12-04 Well Log Performed
2004-12-05 Perforation Treatment Performed - Cement Squeeze
2004-12-10 Perforation Treatment Performed - Acid Squeeze - Press Used
2004-12-11 Well Log Performed
2004-12-12 Well Log Performed
2004-12-13 Perforation Treatment Performed - Jet Perforation
2004-12-13 Well Log Performed
2005-01-25 Well Fluid changed to Crude Oil
2005-01-25 Well Mode changed to Pumping
2010-03-25 Well Log Performed
2010-05-01 Well Fluid changed to Crude Oil
2010-05-01 Well Mode changed to Suspended
2011-08-14 Perforation Treatment Performed - Bridge Plug Capped W/Cement
2011-08-14 Plug Back Performed
2011-08-14 Well Fluid changed to Crude Oil
2011-08-14 Well Mode changed to Abandoned Zone
2011-08-15 Well Log Performed
2011-08-16 Well Log Performed
2011-08-17 Perforation Treatment Performed - Jet Perforation
2011-08-17 Well Log Performed
2011-08-18 Perforation Treatment Performed - Bridge Plug Capped W/Cement
2011-08-18 Perforation Treatment Performed - Remedial Casing
2011-08-19 Perforation Treatment Performed - Jet Perforation
2011-08-19 Well Log Performed
2011-08-20 Perforation Treatment Performed - Bridge Plug Capped W/Cement
2011-08-20 Perforation Treatment Performed - Remedial Casing
2011-08-21 Perforation Treatment Performed - Bridge Plug Capped W/Cement
2011-08-21 Perforation Treatment Performed - Jet Perforation
2011-08-21 Perforation Treatment Performed - Remedial Casing
2011-08-21 Well Log Performed
2011-08-27 Well Abandoned

For data sources see[3]


Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
1968-10-09 Perforation 1525.20 1527.00 10
1988-03-18 Acid Treatment 1521.50 1546.00 0
1988-03-26 Cement Squeeze 1521.50 1546.00 0
1988-03-30 Perforation 1539.00 1540.00 13
1988-03-30 Acid Treatment 1539.00 1540.00 0
1988-05-14 Perforation 1524.00 1525.00 13
1988-05-16 Acid Treatment 1524.00 1525.00 0
1992-03-21 Cement Squeeze 1524.00 1525.00 0
1992-03-22 Perforation 1512.00 1514.00 13
1992-03-22 Perforation 1518.50 1520.00 13
1992-03-23 Cement Plug 1516.00 1521.00 0
1968-10-10 Acid Treatment 1525.20 1527.00 0
1992-03-24 Cement Squeeze 1512.00 1514.00 0
1992-03-26 Perforation 1518.50 1520.00 13
1992-03-27 Acid Treatment 1518.50 1520.00 0
1994-07-17 Cement Squeeze 1518.50 1520.00 0
1994-08-21 Cement Squeeze 1539.00 1540.00 0
1994-08-26 Perforation 1554.60 1558.60 20
1994-08-27 Acid Treatment 1554.60 1558.60 0
1997-09-15 Packing Device Capped w/Cement 1497.60 1505.60 0
1997-09-15 Perforation 1490.40 1493.40 14
1997-09-20 Packing Device Capped w/Cement 1479.00 1487.00 0
1976-04-06 Acid Treatment 1525.20 1527.00 0
1997-09-20 Perforation 1386.80 1388.70 13
1997-09-20 Perforation 1375.30 1378.30 13
1997-09-21 Acid Treatment 1375.30 1388.70 0
1998-08-15 Packing Device Capped w/Cement 1357.00 1365.00 0
1998-08-15 Perforation 1296.00 1302.00 13
1998-08-16 Acid Treatment 1296.00 1302.00 0
2004-11-05 Cement Squeeze 1296.00 1302.00 0
2004-11-09 Perforation 1375.30 1378.30 13
2004-11-09 Perforation 1386.80 1388.70 13
2004-11-10 Cement Squeeze 1375.30 1388.70 0
1980-05-28 Acid Treatment 1525.20 1527.00 0
2004-11-17 Perforation 1490.40 1493.40 14
2004-11-18 Cement Squeeze 1490.40 1493.40 0
2004-11-24 Perforation 1554.60 1558.60 20
2004-12-03 Perforation 1511.00 1514.00 13
2004-12-05 Cement Squeeze 1511.00 1514.00 0
2004-12-10 Acid Treatment 1554.60 1558.60 0
2004-12-13 Perforation 1511.00 1514.00 13
2011-08-14 Packing Device Capped w/Cement 1251.60 1487.50 0
2011-08-17 Perforation 1167.00 1168.00 17
2011-08-18 Remedial Casing Cementing 1167.00 1168.00 0
1988-03-17 Perforation 1521.50 1522.50 13
2011-08-18 Packing Device Capped w/Cement 1154.00 1165.00 0
2011-08-19 Perforation 676.00 677.00 17
2011-08-20 Remedial Casing Cementing 676.00 677.00 0
2011-08-20 Packing Device Capped w/Cement 658.00 674.00 0
2011-08-21 Perforation 332.00 333.00 17
2011-08-21 Remedial Casing Cementing 332.00 333.00 0
2011-08-21 Packing Device Capped w/Cement 320.00 329.00 0
1988-03-17 Perforation 1529.00 1530.00 13
1988-03-17 Perforation 1534.00 1535.00 13
1988-03-17 Perforation 1540.00 1541.00 13
1988-03-17 Perforation 1545.00 1546.00 13

For data sources see[4]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
1968 1158 0.0 0.0 0.0
1969 4011 0.0 0.0 0.0
1970 679 0.0 0.0 0.0
1971 688 0.0 0.0 0.0
1972 1694 0.0 0.0 0.0
1973 2801 0.0 0.0 0.0
1974 2055 0.0 0.0 0.0
1975 3838 0.0 0.0 0.0
1976 2851 0.0 0.0 0.0
1977 1248 0.0 0.0 0.0
1978 1121 0.0 0.0 0.0
1979 1661 0.0 0.0 0.0
1980 1891 0.0 0.0 0.0
1981 1363 0.0 0.0 0.0
1982 3714 0.0 0.0 0.0
1983 5440 0.0 0.0 0.0
1984 7281 0.0 0.0 0.0
1985 6446 0.0 0.0 0.0
1986 6683 0.0 0.0 0.0
1987 6454 0.0 0.0 0.0
1988 5395 0.0 0.0 0.0
1989 8471 0.0 0.0 0.0
1990 8270 0.0 0.0 0.0
1991 8045 0.0 0.0 0.0
1992 7539 0.0 0.0 0.0
1993 6184 0.0 0.0 0.0
1994 2304 0.0 0.0 0.0
1995 0 0.0 0.0 0.0
1996 0 0.0 0.0 0.0
1997 0 0.0 0.0 0.0
2005 6658 0.0 0.0 0.0
2008 720 0.0 0.0 0.0

For data sources see[5]

References