X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

1146062811000

Well Details

Well ID: 1146062811000
Loading map...
Location: 00/11-28-114-06W6/0
Location Alias: 00/11-28-14-06 W6M
Location Alias 2: 00/11-28-114-06 W6/00
Country: Canada
Province: Alberta
Township: 114
Meridian: 6
Range: 06
Section: 28
County/Municipality: Mackenzie County
Well Name: ACL VIRGO 11-28-114-6
Operator Name: Paramount Resources Ltd.
License Number: 0038530
License Date: 1970-08-05
License Status: Suspension
Spud Date: 1970-08-07
Final Drill Date: 1970-08-24
Well Total Depth: 1600.20 m
Surface Hole Latitude: 58.930418
Surface Hole Longitude: -118.946104

For data sources see[1][2]

Well History

Date Event
1909-09-09 Well Log Performed
1970-08-05 Obtained License
1970-08-19 Intermediate Casing Operation Performed
1970-08-24 Finished Drilling
1970-08-24 Well Mode changed to Drilled and Cased
1970-08-25 Drill Stem Test Performed
1970-08-26 Drill Stem Test Performed
1970-08-27 Drill Stem Test Performed
1970-08-28 Perforation Treatment Performed - Open-Hole Completion
1970-09-16 Well Began Production
1970-09-16 Well Fluid changed to Crude Oil
1970-09-16 Well Mode changed to Flowing
1975-03-03 Well Fluid changed to Crude Oil
1975-03-03 Well Mode changed to Pumping
1982-08-12 Perforation Treatment Performed - Acid Squeeze - Press Used
1989-11-01 Well Fluid changed to Crude Oil
1989-11-01 Well Mode changed to Suspended
1997-03-03 Perforation Treatment Performed - Bridge Plug Capped W/Cement
1997-03-03 Perforation Treatment Performed - Jet Perforation
1997-03-03 Plug Back Performed
1997-03-03 Well Fluid changed to Crude Oil
1997-03-03 Well Log Performed
1997-03-03 Well Mode changed to Abandoned Zone
1997-03-06 Perforation Treatment Performed - Cement Squeeze
1997-03-06 Well Log Performed
1997-03-08 Perforation Treatment Performed - Acid Squeeze - Press Used
1997-03-08 Perforation Treatment Performed - Cement Squeeze
1997-03-08 Perforation Treatment Performed - Jet Perforation
1997-04-02 Perforation Treatment Performed - Acid Squeeze - Press Used

For data sources see[3]


Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
1970-08-28 Open Hole/Barefoot Completion 1440.20 1557.50 0
1997-03-08 Cement Squeeze 1391.70 1392.90 0
1997-03-08 Cement Squeeze 1396.00 1397.80 0
1997-03-08 Perforation 1310.00 1311.80 13
1997-03-08 Acid Treatment 1310.00 1311.80 0
1997-04-02 Acid Treatment 1310.00 1311.80 0
1982-08-12 Acid Treatment 1440.20 1557.50 0
1997-03-03 Packing Device Capped w/Cement 1422.00 1430.00 0
1997-03-03 Perforation 1387.40 1389.30 13
1997-03-03 Perforation 1391.70 1392.90 13
1997-03-03 Perforation 1396.00 1397.80 13
1997-03-03 Perforation 1400.80 1402.10 13
1997-03-06 Cement Squeeze 1400.80 1402.10 0
1997-03-08 Cement Squeeze 1387.40 1389.30 0

For data sources see[4]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
1970 1980 0.0 0.0 0.0
1971 5687 0.0 0.0 0.0
1972 2372 0.0 0.0 0.0
1973 4626 0.0 0.0 0.0
1974 3023 0.0 0.0 0.0
1975 3236 0.0 0.0 0.0
1976 2556 0.0 0.0 0.0
1977 3158 0.0 0.0 0.0
1978 8147 0.0 0.0 0.0
1979 8122 0.0 0.0 0.0
1980 7565 0.0 0.0 0.0
1981 3304 0.0 0.0 0.0
1982 1745 0.0 0.0 0.0
1983 4965 0.0 0.0 0.0
1984 7202 0.0 0.0 0.0
1985 7290 0.0 0.0 0.0
1986 7670 0.0 0.0 0.0
1987 8228 0.0 0.0 0.0
1988 6610 0.0 0.0 0.0
1989 2044 0.0 0.0 0.0

For data sources see[5]

References