If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.
powered by ChangeDetection
| Well ID: 1146053502002 | Loading map...
{"type":"SATELLITE","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"100%","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"wmsoverlay":false,"copycoords":false,"static":false,"zoom":14,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"markercluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","enablefullscreen":false,"scrollwheelzoom":false,"locations":[{"text":"","title":"","link":"","lat":58.936628,"lon":-118.717184,"icon":""}]} |
| Location: 00/02-35-114-05W6/2 | |
| Location Alias: 00/02-35-14-05 W6M | |
| Location Alias 2: 00/02-35-114-05 W6/02 | |
| Country: Canada | |
| Province: Alberta | |
| Township: 114 | |
| Meridian: 6 | |
| Range: 05 | |
| Section: 35 | |
| County/Municipality: Mackenzie County | |
| Well Name: ACL VIRGO 2-35-114-5 | |
| Operator Name: Paramount Resources Ltd. | |
| License Number: 0035757 | |
| License Date: 1969-02-06 | |
| License Status: Abandoned | |
| Spud Date: 1969-02-12 | |
| Final Drill Date: 1969-02-27 | |
| Well Total Depth: 1493.50 m | |
| Surface Hole Latitude: 58.936628 | |
| Surface Hole Longitude: -118.717184 |
| Date | Event |
|---|---|
| 1909-09-09 | Well Log Performed |
| 1969-02-06 | Obtained License |
| 1969-02-27 | Finished Drilling |
| 1969-02-27 | Well Mode changed to Drilled and Cased |
| 1969-02-28 | Perforation Treatment Performed - Bridge Plug Capped W/Cement |
| 1969-03-01 | Liner Casing Operation Performed |
| 1969-03-07 | Perforation Treatment Performed - Bullet Perforation |
| 1969-03-08 | Perforation Treatment Performed - Acid Squeeze - Press Used |
| 1969-03-12 | Perforation Treatment Performed - Acid Squeeze - Press Used |
| 1985-12-04 | Perforation Treatment Performed - Jet Perforation |
| 1985-12-05 | Perforation Treatment Performed - Acid Squeeze - Press Used |
| 1994-10-06 | Well Log Performed |
| 1994-10-07 | Well Log Performed |
| 1994-10-08 | Perforation Treatment Performed - Bridge Plug Capped W/Cement |
| 1994-10-08 | Plug Back Performed |
| 1994-10-16 | Perforation Treatment Performed - Jet Perforation |
| 1994-10-16 | Well Log Performed |
| 1994-10-22 | Perforation Treatment Performed - Bridge Plug Capped W/Cement |
| 1994-10-22 | Plug Back Performed |
| 1994-10-23 | Perforation Treatment Performed - Jet Perforation |
| 1999-01-11 | Well Began Production |
| 1999-01-11 | Well Fluid changed to Gas |
| 1999-01-11 | Well Mode changed to Flowing |
| 1999-01-29 | Well Fluid changed to Gas |
| 1999-01-29 | Well Mode changed to Flowing |
| 2010-12-01 | Well Fluid changed to Gas |
| 2010-12-01 | Well Mode changed to Suspended |
| 2011-12-08 | Well Log Performed |
| 2011-12-09 | Perforation Treatment Performed - Bridge Plug Capped W/Cement |
| 2011-12-09 | Perforation Treatment Performed - Jet Perforation |
| 2011-12-09 | Plug Back Performed |
| 2011-12-09 | Well Fluid changed to Gas |
| 2011-12-09 | Well Log Performed |
| 2011-12-09 | Well Mode changed to Abandoned Zone |
| 2011-12-10 | Perforation Treatment Performed - Bridge Plug Capped W/Cement |
| 2011-12-10 | Perforation Treatment Performed - Jet Perforation |
| 2011-12-10 | Perforation Treatment Performed - Remedial Casing |
| 2011-12-10 | Well Log Performed |
| 2011-12-12 | Perforation Treatment Performed - Jet Perforation |
| 2011-12-12 | Well Log Performed |
| 2011-12-13 | Perforation Treatment Performed - Bridge Plug Capped W/Cement |
| 2011-12-13 | Perforation Treatment Performed - Remedial Casing |
| 2011-12-14 | Perforation Treatment Performed - Jet Perforation |
| 2011-12-14 | Well Log Performed |
| 2011-12-15 | Perforation Treatment Performed - Bridge Plug Capped W/Cement |
| 2011-12-15 | Perforation Treatment Performed - Remedial Casing |
| 2011-12-17 | Well Abandoned |
| 2011-12-17 | Well Fluid changed to Gas |
| 2011-12-17 | Well Mode changed to Abandoned |
For data sources see[3]
| Perforation Date | Perforation Type | Interval Top (m) | Interval Base (m) | Number of Shots |
|---|---|---|---|---|
| 1969-02-28 | Packing Device Capped w/Cement | 1466.10 | 1466.10 | 0 |
| 1994-10-16 | Perforation | 1327.20 | 1333.20 | 13 |
| 1994-10-16 | Perforation | 1298.80 | 1300.30 | 13 |
| 1994-10-16 | Perforation | 1326.50 | 1327.20 | 13 |
| 1994-10-16 | Perforation | 1279.60 | 1282.60 | 13 |
| 1994-10-22 | Packing Device Capped w/Cement | 1317.00 | 1325.00 | 0 |
| 1994-10-23 | Perforation | 1250.00 | 1251.80 | 13 |
| 2011-12-09 | Packing Device Capped w/Cement | 1237.00 | 1245.00 | 0 |
| 2011-12-09 | Perforation | 626.00 | 627.00 | 17 |
| 2011-12-10 | Remedial Casing Cementing | 626.00 | 627.00 | 0 |
| 2011-12-10 | Packing Device Capped w/Cement | 613.00 | 623.00 | 0 |
| 1969-03-07 | Bullet Perforation | 1433.80 | 1435.60 | 7 |
| 2011-12-10 | Perforation | 276.00 | 277.00 | 17 |
| 2011-12-12 | Perforation | 276.00 | 277.00 | 17 |
| 2011-12-13 | Remedial Casing Cementing | 276.00 | 277.00 | 0 |
| 2011-12-13 | Packing Device Capped w/Cement | 262.00 | 273.00 | 0 |
| 2011-12-14 | Perforation | 238.00 | 239.00 | 99 |
| 2011-12-15 | Remedial Casing Cementing | 238.00 | 239.00 | 0 |
| 2011-12-15 | Packing Device Capped w/Cement | 226.00 | 236.00 | 0 |
| 1969-03-07 | Bullet Perforation | 1441.40 | 1442.90 | 7 |
| 1969-03-08 | Acid Treatment | 1433.80 | 1442.90 | 0 |
| 1969-03-12 | Acid Treatment | 1433.80 | 1442.90 | 0 |
| 1985-12-04 | Perforation | 1430.10 | 1431.30 | 13 |
| 1985-12-05 | Acid Treatment | 1430.10 | 1435.60 | 0 |
| 1994-10-08 | Packing Device Capped w/Cement | 1417.00 | 1425.00 | 0 |
| 1994-10-16 | Perforation | 1341.10 | 1346.40 | 13 |
For data sources see[4]
| Period | Total Production Hours | Gas Quantity (m3) | Oil Quantity (m3) | Water Quantity (m3) |
|---|---|---|---|---|
| 1999 | 1290 | 0.0 | 0.0 | 0.0 |
For data sources see[5]