If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.
powered by ChangeDetection
Well ID: 1136050301002 | Loading map...
{"type":"SATELLITE","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"100%","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"wmsoverlay":false,"copycoords":false,"static":false,"zoom":14,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"markercluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","enablefullscreen":false,"scrollwheelzoom":false,"locations":[{"text":"","title":"","link":"","lat":58.778589,"lon":-118.73465,"icon":""}]} |
Location: 00/01-03-113-05W6/2 | |
Location Alias: 00/01-03-13-05 W6M | |
Location Alias 2: 00/01-03-113-05 W6/02 | |
Country: Canada | |
Province: Alberta | |
Township: 113 | |
Meridian: 6 | |
Range: 05 | |
Section: 03 | |
County/Municipality: Hay Lake 209 | |
Well Name: NUVISTA SOUSA 1-3-113-5 | |
Operator Name: Advantage Oil & Gas Ltd. | |
License Number: 0246097 | |
License Date: 2000-12-06 | |
License Status: Abandoned | |
Spud Date: 2001-01-06 | |
Final Drill Date: 2001-01-28 | |
Well Total Depth: 1540.00 m | |
Surface Hole Latitude: 58.778589 | |
Surface Hole Longitude: -118.734650 |
Date | Event |
---|---|
2000-12-06 | Obtained License |
2001-01-10 | Surface Casing Operation Performed |
2001-01-19 | Intermediate Casing Operation Performed |
2001-01-25 | Direction Drilling Operation Performed - Deviate |
2001-01-28 | Finished Drilling |
2001-01-28 | Well Log Performed |
2001-01-30 | Liner Casing Operation Performed |
2001-01-30 | Rig Released |
2001-01-30 | Well Mode changed to Drilled and Cased |
2001-03-04 | Perforation Treatment Performed - Jet Perforation |
2001-03-05 | Perforation Treatment Performed - Acid Squeeze - Press Used |
2001-04-06 | Well Began Production |
2001-04-06 | Well Fluid changed to Crude Oil |
2001-04-06 | Well Mode changed to Pumping |
2010-03-09 | Perforation Treatment Performed - Bridge Plug Capped W/Cement |
2010-03-09 | Plug Back Performed |
2010-03-09 | Well Fluid changed to Crude Oil |
2010-03-09 | Well Mode changed to Abandoned Zone |
2010-03-10 | Perforation Treatment Performed - Cement Plug |
2010-03-12 | Well Abandoned |
2010-03-12 | Well Fluid changed to Crude Oil |
2010-03-12 | Well Mode changed to Abandoned |
2011-03-03 | Well Log Performed |
2011-03-07 | Perforation Treatment Performed - Jet Perforation |
2011-03-07 | Well Log Performed |
2011-03-08 | Perforation Treatment Performed - Acid Squeeze - Press Used |
2011-03-09 | Well Log Performed |
2011-03-11 | Perforation Treatment Performed - Cement Squeeze |
2018-09-24 | Perforation Treatment Performed - Jet Perforation |
2018-09-24 | Well Log Performed |
2018-09-27 | Well Log Performed |
2018-09-29 | Perforation Treatment Performed - Cement Squeeze |
2018-10-04 | Perforation Treatment Performed - Jet Perforation |
2018-10-12 | Perforation Treatment Performed - Jet Perforation |
2018-10-13 | Well Log Performed |
2018-10-20 | Perforation Treatment Performed - Bridge Plug Capped W/Cement |
2018-10-20 | Plug Back Performed |
2018-10-21 | Perforation Treatment Performed - Jet Perforation |
2018-10-21 | Well Log Performed |
2018-10-22 | Perforation Treatment Performed - Acid Squeeze - Press Used |
2018-10-25 | Perforation Treatment Performed - Cement Squeeze |
2018-10-26 | Perforation Treatment Performed - Jet Perforation |
2018-10-26 | Well Log Performed |
2018-10-29 | Perforation Treatment Performed - Acid Squeeze - Press Used |
2018-10-31 | Perforation Treatment Performed - Bridge Plug Capped W/Cement |
2018-10-31 | Plug Back Performed |
2018-11-02 | Perforation Treatment Performed - Bridge Plug Capped W/Cement |
2018-11-02 | Perforation Treatment Performed - Cement Squeeze |
2018-11-02 | Plug Back Performed |
For data sources see[3]
Start Date | Depth (m) | Reason |
---|---|---|
2001-01-25 | 1282.00 | Deviate (5 - 79 degrees) |
For data sources see[4]
Perforation Date | Perforation Type | Interval Top (m) | Interval Base (m) | Number of Shots |
---|---|---|---|---|
2001-03-04 | Perforation | 1502.00 | 1504.00 | 20 |
2018-09-29 | Cement Squeeze | 247.00 | 249.00 | 0 |
2018-10-04 | Perforation | 247.00 | 249.00 | 26 |
2018-10-12 | Perforation | 858.50 | 860.50 | 17 |
2018-10-20 | Packing Device Capped w/Cement | 843.80 | 851.80 | 0 |
2018-10-21 | Perforation | 314.00 | 316.00 | 26 |
2018-10-22 | Acid Treatment | 314.00 | 316.00 | 0 |
2018-10-25 | Cement Squeeze | 314.00 | 316.00 | 0 |
2018-10-26 | Perforation | 232.00 | 234.00 | 26 |
2018-10-29 | Acid Treatment | 232.00 | 234.00 | 0 |
2018-10-31 | Packing Device Capped w/Cement | 302.30 | 310.90 | 0 |
2001-03-04 | Perforation | 1506.00 | 1508.00 | 20 |
2018-11-02 | Cement Squeeze | 232.00 | 234.00 | 0 |
2018-11-02 | Packing Device Capped w/Cement | 220.00 | 229.20 | 0 |
2001-03-05 | Acid Treatment | 1502.00 | 1508.00 | 0 |
2010-03-09 | Packing Device Capped w/Cement | 1487.00 | 1495.00 | 0 |
2010-03-10 | Cement Plug | 1212.90 | 1270.00 | 0 |
2011-03-07 | Perforation | 858.50 | 860.50 | 17 |
2011-03-08 | Acid Treatment | 858.50 | 860.50 | 0 |
2011-03-11 | Cement Squeeze | 858.50 | 860.50 | 0 |
2018-09-24 | Perforation | 247.00 | 249.00 | 26 |
For data sources see[5]
Period | Total Production Hours | Gas Quantity (m3) | Oil Quantity (m3) | Water Quantity (m3) |
---|---|---|---|---|
2001 | 6150 | 0.0 | 0.0 | 0.0 |
2002 | 6280 | 0.0 | 0.0 | 0.0 |
2003 | 6814 | 0.0 | 0.0 | 0.0 |
For data sources see[6]
Occurence Date | Occurence Type | Occurence Depth (m) | Occurence Control Depth (m) |
---|---|---|---|
2011-03-13 | No Incident Encountered | 0.00 | 0.00 |
2018-11-03 | No Incident Encountered | 0.00 | 0.00 |
For data sources see[7]