If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.
powered by ChangeDetection
Well ID: 1126051604002 | Loading map...
{"type":"SATELLITE","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"100%","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"wmsoverlay":false,"copycoords":false,"static":false,"zoom":14,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"markercluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","enablefullscreen":false,"scrollwheelzoom":false,"locations":[{"text":"","title":"","link":"","lat":58.719255,"lon":-118.784691,"icon":""}]} |
Location: 00/04-16-112-05W6/2 | |
Location Alias: 00/04-16-12-05 W6M | |
Location Alias 2: 00/04-16-112-05 W6/02 | |
Country: Canada | |
Province: Alberta | |
Township: 112 | |
Meridian: 6 | |
Range: 05 | |
Section: 16 | |
County/Municipality: Hay Lake 209 | |
Well Name: STRATH ET AL SOUSA 4-16-112-5 | |
Operator Name: Repsol Oil & Gas Canada Inc. | |
License Number: 0108075 | |
License Date: 1984-07-05 | |
License Status: RecExempt | |
Spud Date: 1984-09-18 | |
Final Drill Date: 1984-09-28 | |
Well Total Depth: 1521.20 m | |
Surface Hole Latitude: 58.719255 | |
Surface Hole Longitude: -118.784691 |
Date | Event |
---|---|
1984-07-05 | Obtained License |
1984-09-28 | Finished Drilling |
1984-09-28 | Perforation Treatment Performed - Open-Hole Completion |
1984-09-28 | Well Mode changed to Drilled and Cased |
1984-09-30 | Perforation Treatment Performed - Fractured |
1984-10-01 | Well Log Performed |
1984-10-02 | Well Log Performed |
1984-10-05 | Rig Released |
1985-08-07 | Well Began Injection |
1985-08-07 | Well Fluid changed to Water |
1985-08-07 | Well Type changed to Disposal |
1986-11-28 | Well Fluid changed to Water |
1986-11-28 | Well Mode changed to Suspended |
1986-11-28 | Well Type changed to Disposal |
1987-04-15 | Well Fluid changed to Water |
1987-04-15 | Well Type changed to Disposal |
1988-03-13 | Perforation Treatment Performed - Bridge Plug Capped W/Cement |
1988-03-13 | Plug Back Performed |
1988-03-13 | Well Fluid changed to Water |
1988-03-13 | Well Mode changed to Abandoned Zone |
1988-03-13 | Well Type changed to Disposal |
1988-03-14 | Perforation Treatment Performed - Bridge Plug Capped W/Cement |
1988-03-14 | Plug Back Performed |
1990-07-23 | Well Abandoned |
1990-07-23 | Well Fluid changed to Water |
1990-07-23 | Well Mode changed to Abandoned |
1990-07-23 | Well Type changed to Disposal |
For data sources see[3]
Perforation Date | Perforation Type | Interval Top (m) | Interval Base (m) | Number of Shots |
---|---|---|---|---|
1984-09-28 | Open Hole/Barefoot Completion | 1513.90 | 1521.20 | 0 |
1984-09-30 | Fracture | 1513.90 | 1521.20 | 0 |
1988-03-13 | Packing Device Capped w/Cement | 1312.00 | 1320.00 | 0 |
1988-03-13 | Packing Device Capped w/Cement | 592.00 | 600.00 | 0 |
1988-03-14 | Packing Device Capped w/Cement | 140.00 | 148.00 | 0 |
For data sources see[4]
Period | Total Production Hours | Gas Quantity (m3) | Oil Quantity (m3) | Water Quantity (m3) |
---|---|---|---|---|
1985 | 0 | 0.0 | 0.0 | 0.0 |
1986 | 0 | 0.0 | 0.0 | 0.0 |
1987 | 0 | 0.0 | 0.0 | 0.0 |
For data sources see[5]