X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

1126051604002

Well Details

Well ID: 1126051604002
Loading map...
Location: 00/04-16-112-05W6/2
Location Alias: 00/04-16-12-05 W6M
Location Alias 2: 00/04-16-112-05 W6/02
Country: Canada
Province: Alberta
Township: 112
Meridian: 6
Range: 05
Section: 16
County/Municipality: Hay Lake 209
Well Name: STRATH ET AL SOUSA 4-16-112-5
Operator Name: Repsol Oil & Gas Canada Inc.
License Number: 0108075
License Date: 1984-07-05
License Status: RecExempt
Spud Date: 1984-09-18
Final Drill Date: 1984-09-28
Well Total Depth: 1521.20 m
Surface Hole Latitude: 58.719255
Surface Hole Longitude: -118.784691

For data sources see[1][2]

Well History

Date Event
1984-07-05 Obtained License
1984-09-28 Finished Drilling
1984-09-28 Perforation Treatment Performed - Open-Hole Completion
1984-09-28 Well Mode changed to Drilled and Cased
1984-09-30 Perforation Treatment Performed - Fractured
1984-10-01 Well Log Performed
1984-10-02 Well Log Performed
1984-10-05 Rig Released
1985-08-07 Well Began Injection
1985-08-07 Well Fluid changed to Water
1985-08-07 Well Type changed to Disposal
1986-11-28 Well Fluid changed to Water
1986-11-28 Well Mode changed to Suspended
1986-11-28 Well Type changed to Disposal
1987-04-15 Well Fluid changed to Water
1987-04-15 Well Type changed to Disposal
1988-03-13 Perforation Treatment Performed - Bridge Plug Capped W/Cement
1988-03-13 Plug Back Performed
1988-03-13 Well Fluid changed to Water
1988-03-13 Well Mode changed to Abandoned Zone
1988-03-13 Well Type changed to Disposal
1988-03-14 Perforation Treatment Performed - Bridge Plug Capped W/Cement
1988-03-14 Plug Back Performed
1990-07-23 Well Abandoned
1990-07-23 Well Fluid changed to Water
1990-07-23 Well Mode changed to Abandoned
1990-07-23 Well Type changed to Disposal

For data sources see[3]


Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
1984-09-28 Open Hole/Barefoot Completion 1513.90 1521.20 0
1984-09-30 Fracture 1513.90 1521.20 0
1988-03-13 Packing Device Capped w/Cement 1312.00 1320.00 0
1988-03-13 Packing Device Capped w/Cement 592.00 600.00 0
1988-03-14 Packing Device Capped w/Cement 140.00 148.00 0

For data sources see[4]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
1985 0 0.0 0.0 0.0
1986 0 0.0 0.0 0.0
1987 0 0.0 0.0 0.0

For data sources see[5]

References