If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.
powered by ChangeDetection
Well ID: 1106080802000 | Loading map...
{"type":"SATELLITE","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"100%","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"wmsoverlay":false,"copycoords":false,"static":false,"zoom":14,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"markercluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","enablefullscreen":false,"scrollwheelzoom":false,"locations":[{"text":"","title":"","link":"","lat":58.53072,"lon":-119.2941,"icon":""}]} |
Location: 00/02-08-110-08W6/0 | |
Location Alias: 00/02-08-10-08 W6M | |
Location Alias 2: 00/02-08-110-08 W6/00 | |
Country: Canada | |
Province: Alberta | |
Township: 110 | |
Meridian: 6 | |
Range: 08 | |
Section: 08 | |
County/Municipality: Mackenzie County | |
Well Name: SLE RAINBOW 2-8-110-8 | |
Operator Name: SanLing Energy Ltd. | |
License Number: 0029589 | |
License Date: 1965-12-10 | |
License Status: Suspension | |
Spud Date: 1965-12-14 | |
Final Drill Date: 1966-01-21 | |
Well Total Depth: 2145.80 m | |
Surface Hole Latitude: 58.530720 | |
Surface Hole Longitude: -119.294100 |
Date | Event |
---|---|
1909-09-09 | Well Log Performed |
1965-12-10 | Obtained License |
1965-12-31 | Production Casing Operation Performed |
1966-01-02 | Drill Stem Test Performed |
1966-01-03 | Drill Stem Test Performed |
1966-01-04 | Drill Stem Test Performed |
1966-01-05 | Drill Stem Test Performed |
1966-01-06 | Drill Stem Test Performed |
1966-01-11 | Drill Stem Test Performed |
1966-01-12 | Drill Stem Test Performed |
1966-01-13 | Drill Stem Test Performed |
1966-01-21 | Finished Drilling |
1966-01-22 | Drill Stem Test Performed |
1966-03-08 | Well Mode changed to Drilled and Cased |
For data sources see[3]