X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

1096080711000

Well Details

Well ID: 1096080711000
Loading map...
Location: 00/11-07-109-08W6/0
Location Alias: 00/11-07-09-08 W6M
Location Alias 2: 00/11-07-109-08 W6/00
Country: Canada
Province: Alberta
Township: 109
Meridian: 6
Range: 08
Section: 07
County/Municipality: Mackenzie County
Well Name: HUSKY ET AL RAINBOW 11-7-109-8
Operator Name: Husky Oil Operations Limited
License Number: 0103063
License Date: 1983-09-14
License Status: Issued
Spud Date: 1983-09-17
Final Drill Date: 1983-09-29
Well Total Depth: 1918.00 m
Surface Hole Latitude: 58.451068
Surface Hole Longitude: -119.329683

For data sources see[1][2]

Well History

Date Event
1909-09-09 Well Log Performed
1983-09-14 Obtained License
1983-09-23 Lost Circulation Occurred
1983-09-29 Finished Drilling
1983-09-29 Well Log Performed
1983-09-29 Well Mode changed to Drilled and Cased
1983-10-03 Drill Stem Test Performed
1983-10-04 Drill Stem Test Performed
1983-10-07 Drill Stem Test Performed
1983-10-08 Drill Stem Test Performed
1983-10-09 Lost Circulation Occurred
1983-10-13 Production Casing Operation Performed
1983-11-03 Perforation Treatment Performed - Jet Perforation
1983-11-08 Perforation Treatment Performed - Acid Squeeze - Press Used
1983-12-04 Well Began Production
1983-12-04 Well Fluid changed to Crude Oil
1983-12-04 Well Mode changed to Flowing
1985-11-15 Well Fluid changed to Crude Oil
1985-11-15 Well Mode changed to Pumping
1987-02-13 Perforation Treatment Performed - Jet Perforation
1987-02-14 Perforation Treatment Performed - Acid Squeeze - Press Used
1987-02-15 Perforation Treatment Performed - Acid Squeeze - Press Used
1987-02-16 Perforation Treatment Performed - Acid Squeeze - Press Used
1987-02-17 Perforation Treatment Performed - Acid Squeeze - Press Used
1987-02-19 Perforation Treatment Performed - Acid Squeeze - Press Used
1995-07-09 Perforation Treatment Performed - Bridge Plug Capped W/Cement
1995-07-09 Perforation Treatment Performed - Jet Perforation
1995-07-09 Plug Back Performed
1995-07-09 Well Fluid changed to Crude Oil
1995-07-09 Well Log Performed
1995-07-09 Well Mode changed to Abandoned Zone
1995-07-10 Perforation Treatment Performed - Remedial Casing
1995-07-11 Perforation Treatment Performed - Acid Squeeze - Press Used
1995-07-12 Perforation Treatment Performed - Cement Plug
1995-07-12 Perforation Treatment Performed - Remedial Casing
1995-07-15 Perforation Treatment Performed - Jet Perforation
1995-07-15 Well Log Performed
1995-08-21 Perforation Treatment Performed - Fractured
2011-03-17 Perforation Treatment Performed - Jet Perforation
2011-03-18 Well Log Performed
2011-03-20 Well Log Performed
2011-03-21 Perforation Treatment Performed - Acid Squeeze - Press Used
2011-03-22 Perforation Treatment Performed - Acid Squeeze - Press Used
2011-03-23 Perforation Treatment Performed - Acid Squeeze - Press Used
2011-03-25 Well Log Performed
2011-03-26 Perforation Treatment Performed - Casing Patch (Over Perfs)

For data sources see[3]


Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
1983-11-03 Perforation 1900.70 1901.70 13
1983-11-08 Acid Treatment 1807.50 1901.70 0
1987-02-13 Perforation 1850.00 1853.00 13
1987-02-14 Acid Treatment 1897.80 1901.70 0
1987-02-15 Acid Treatment 1876.50 1878.50 0
1987-02-16 Acid Treatment 1850.00 1853.00 0
1987-02-17 Acid Treatment 1840.50 1843.00 0
1987-02-17 Acid Treatment 1832.00 1834.30 0
1987-02-19 Acid Treatment 1807.50 1809.00 0
1995-07-09 Packing Device Capped w/Cement 1787.00 1795.00 0
1995-07-09 Perforation 415.00 417.00 13
1983-11-03 Perforation 1897.80 1898.30 13
1995-07-09 Perforation 475.00 477.00 13
1995-07-10 Remedial Casing Cementing 475.00 477.00 0
1995-07-11 Acid Treatment 415.00 417.00 0
1995-07-12 Remedial Casing Cementing 415.00 417.00 0
1995-07-12 Cement Plug 349.50 418.50 0
1995-07-15 Perforation 461.50 467.50 13
1995-08-21 Fracture 461.50 467.50 0
2011-03-17 Perforation 1807.50 1809.00 13
2011-03-17 Perforation 1832.00 1834.30 13
2011-03-17 Perforation 1840.50 1841.50 13
1983-11-03 Perforation 1888.70 1889.20 13
2011-03-17 Perforation 1842.00 1843.00 13
2011-03-17 Perforation 1850.00 1853.00 13
2011-03-17 Perforation 1876.50 1878.50 13
2011-03-17 Perforation 1883.60 1884.60 13
2011-03-17 Perforation 1888.70 1889.20 13
2011-03-17 Perforation 1897.80 1898.30 13
2011-03-17 Perforation 1900.70 1901.70 13
2011-03-21 Acid Treatment 1876.50 1901.70 0
2011-03-22 Acid Treatment 1876.50 1901.70 0
2011-03-23 Acid Treatment 1850.00 1853.00 0
1983-11-03 Perforation 1883.60 1884.60 13
2011-03-23 Acid Treatment 1832.80 1853.00 0
2011-03-26 Casing Patch 461.50 467.50 0
1983-11-03 Perforation 1876.50 1878.50 13
1983-11-03 Perforation 1842.00 1843.00 13
1983-11-03 Perforation 1840.50 1841.50 13
1983-11-03 Perforation 1832.80 1834.30 13
1983-11-03 Perforation 1807.50 1809.00 13

For data sources see[4]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
1983 602 0.0 0.0 0.0
1984 8102 0.0 0.0 0.0
1985 8199 0.0 0.0 0.0
1986 2378 0.0 0.0 0.0
1987 7299 0.0 0.0 0.0
1988 8275 0.0 0.0 0.0
1989 8642 0.0 0.0 0.0
1990 7967 0.0 0.0 0.0
1991 7664 0.0 0.0 0.0
1992 8676 0.0 0.0 0.0
1993 8518 0.0 0.0 0.0
1994 3940 0.0 0.0 0.0

For data sources see[5]

Occurences

Occurence Date Occurence Type Occurence Depth (m) Occurence Control Depth (m)
1983-09-23 Lost Circulation 1186.00 1186.00
1983-10-09 Lost Circulation 1918.00 1918.00

For data sources see[6]

References