Well Details

Well ID: 1096080316000
Loading map...
Location: 00/16-03-109-08W6/0
Location Alias: 00/16-03-09-08 W6M
Location Alias 2: 00/16-03-109-08 W6/00
Country: Canada
Province: Alberta
Township: 109
Meridian: 6
Range: 08
Section: 03
County/Municipality: Mackenzie County
Well Name: HUSKY MOBIL RAINBOW 16-3-109-8
Operator Name: Husky Oil Operations Limited
License Number: 0144524
License Date: 1990-06-21
License Status: Issued
Spud Date: 1990-06-28
Final Drill Date: 1990-07-16
Well Total Depth: 1905.00 m
Surface Hole Latitude: 58.441111
Surface Hole Longitude: -119.233691

For data sources see[1][2]

Well History

Date Event
1990-06-21 Obtained License
1990-06-29 Surface Casing Operation Performed
1990-07-05 Direction Drilling Operation Performed - Deviate
1990-07-09 Well Log Performed
1990-07-11 Intermediate Casing Operation Performed
1990-07-12 Well Log Performed
1990-07-13 Lost Circulation Occurred
1990-07-16 Finished Drilling
1990-07-16 Well Mode changed to Drilled and Cased
1990-07-17 Well Log Performed
1990-07-19 Liner Casing Operation Performed
1990-07-20 Rig Released
1990-08-22 Perforation Treatment Performed - Jet Perforation
1990-08-23 Perforation Treatment Performed - Acid Squeeze - Press Used
1990-08-24 Perforation Treatment Performed - Acid Squeeze - Press Used
1990-08-26 Perforation Treatment Performed - Jet Perforation
1990-08-27 Perforation Treatment Performed - Acid Squeeze - Press Used
1990-09-14 Well Began Production
1990-09-14 Well Fluid changed to Crude Oil
1990-09-14 Well Mode changed to Flowing
1993-09-30 Well Log Performed
1993-10-01 Perforation Treatment Performed - Jet Perforation
1993-10-04 Perforation Treatment Performed - Acid Squeeze - Press Used
1996-05-24 Well Log Performed
1996-05-25 Perforation Treatment Performed - Cement Squeeze
1996-05-28 Perforation Treatment Performed - Jet Perforation
1996-05-28 Well Log Performed
1996-05-29 Perforation Treatment Performed - Acid Squeeze - Press Used
1996-05-30 Perforation Treatment Performed - Jet Perforation
1996-05-30 Well Log Performed
1996-06-01 Perforation Treatment Performed - Acid Squeeze - Press Used
1996-06-02 Well Log Performed
2005-01-27 Perforation Treatment Performed - Jet Perforation
2007-01-10 Well Log Performed
2007-01-12 Perforation Treatment Performed - Cement Squeeze
2007-01-13 Well Log Performed
2007-01-19 Perforation Treatment Performed - Jet Perforation
2007-01-22 Perforation Treatment Performed - Acid Squeeze - Press Used
2007-01-24 Perforation Treatment Performed - Acid Squeeze - Press Used
2007-01-25 Perforation Treatment Performed - Jet Perforation
2007-01-26 Perforation Treatment Performed - Chemical Squeeze
2007-01-27 Perforation Treatment Performed - Chemical Squeeze
2007-01-30 Perforation Treatment Performed - Acid Squeeze - Press Used
2007-02-01 Perforation Treatment Performed - Jet Perforation
2007-02-01 Well Log Performed
2007-02-03 Well Log Performed
2010-07-24 Well Log Performed

For data sources see[3]

Directional Drilling

Start Date Depth (m) Reason
1990-07-05 1399.00 Deviate (5 - 79 degrees)

For data sources see[4]

Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
1990-08-22 Perforation 1785.00 1787.00 13
1996-05-28 Perforation 1806.00 1808.00 13
1996-05-28 Perforation 1830.00 1832.00 13
1996-05-29 Acid Treatment 1806.00 1808.00 0
1996-05-29 Acid Treatment 1830.00 1832.00 0
1996-05-30 Perforation 1785.00 1787.00 13
1996-05-30 Perforation 1789.50 1792.00 13
1996-06-01 Acid Treatment 1785.00 1792.00 0
1996-06-01 Acid Treatment 1830.00 1832.00 0
2005-01-27 Perforation 1837.00 1841.00 13
2007-01-12 Cement Squeeze 1785.00 1787.00 0
1990-08-22 Perforation 1795.00 1799.00 13
2007-01-12 Cement Squeeze 1789.50 1792.00 0
2007-01-12 Cement Squeeze 1806.00 1808.00 0
2007-01-12 Cement Squeeze 1830.00 1832.00 0
2007-01-12 Cement Squeeze 1837.00 1841.00 0
2007-01-19 Perforation 1863.00 1867.00 13
2007-01-19 Perforation 1854.00 1859.00 13
2007-01-19 Perforation 1847.00 1851.00 13
2007-01-22 Acid Treatment 1854.00 1859.00 0
2007-01-24 Acid Treatment 1847.00 1851.00 0
2007-01-25 Perforation 1854.00 1860.00 13
1990-08-23 Acid Treatment 1785.00 1787.00 0
2007-01-25 Perforation 1847.00 1851.00 13
2007-01-26 Chemical Squeeze 1854.00 1860.00 0
2007-01-27 Chemical Squeeze 1847.00 1851.00 0
2007-01-30 Acid Treatment 1854.00 1860.00 0
2007-02-01 Perforation 1785.00 1787.00 13
1990-08-24 Acid Treatment 1795.00 1799.00 0
1990-08-26 Perforation 1804.00 1809.00 14
1990-08-27 Acid Treatment 1804.00 1809.00 0
1993-10-01 Perforation 1820.00 1824.00 13
1993-10-04 Acid Treatment 1820.00 1824.00 0
1996-05-25 Cement Squeeze 1785.00 1799.00 0

For data sources see[5]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
1990 2550 0.0 0.0 0.0
1991 7726 0.0 0.0 0.0
1992 8592 0.0 0.0 0.0
1993 8249 0.0 0.0 0.0
1994 8393 0.0 0.0 0.0
1995 8598 0.0 0.0 0.0
1996 7273 0.0 0.0 0.0
1997 8635 0.0 0.0 0.0
1998 8751 0.0 0.0 0.0
1999 8494 0.0 0.0 0.0
2000 8778 0.0 0.0 0.0
2001 8632 0.0 0.0 0.0
2002 6967 0.0 0.0 0.0
2003 7609 0.0 0.0 0.0
2004 30 0.0 0.0 0.0
2005 4306 0.0 0.0 0.0
2006 864 0.0 0.0 0.0
2007 7735 0.0 0.0 0.0
2008 7486 0.0 0.0 0.0
2009 8309 0.0 0.0 0.0
2010 7220 0.0 0.0 0.0
2011 4693 0.0 0.0 0.0
2012 2840 0.0 0.0 0.0
2013 5376 0.0 0.0 0.0
2014 1698 0.0 0.0 0.0
2015 2343 0.0 0.0 0.0
2016 6155 0.0 0.0 0.0
2017 5640 0.0 0.0 0.0
2018 5382 0.0 0.0 0.0
2019 7932 0.0 0.0 0.0
2020 2183 0.0 0.0 0.0

For data sources see[6]

Occurences

Occurence Date Occurence Type Occurence Depth (m) Occurence Control Depth (m)
1990-07-13 Lost Circulation 1809.00 1905.00

For data sources see[7]