X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

1096080306000

Well Details

Well ID: 1096080306000
Loading map...
Location: 00/06-03-109-08W6/0
Location Alias: 00/06-03-09-08 W6M
Location Alias 2: 00/06-03-109-08 W6/00
Country: Canada
Province: Alberta
Township: 109
Meridian: 6
Range: 08
Section: 03
County/Municipality: Mackenzie County
Well Name: HUSKY ET AL RAINBOW 6-3-109-8
Operator Name: Husky Oil Operations Limited
License Number: 0151809
License Date: 1992-02-24
License Status: Suspension
Spud Date: 1992-03-06
Final Drill Date: 1992-03-22
Well Total Depth: 1900.00 m
Surface Hole Latitude: 58.431493
Surface Hole Longitude: -119.245306

For data sources see[1][2]

Well History

Date Event
1992-02-24 Obtained License
1992-03-07 Surface Casing Operation Performed
1992-03-13 Direction Drilling Operation Performed - Deviate
1992-03-16 Lost Circulation Occurred
1992-03-20 Intermediate Casing Operation Performed
1992-03-21 Lost Circulation Occurred
1992-03-22 Finished Drilling
1992-03-22 Well Log Performed
1992-03-22 Well Mode changed to Drilled and Cased
1992-03-24 Well Log Performed
1992-03-26 Rig Released
1992-04-03 Well Log Performed
1992-04-07 Liner Casing Operation Performed
1992-04-11 Well Log Performed
1992-04-12 Perforation Treatment Performed - Jet Perforation
1992-04-12 Well Log Performed
1992-04-13 Perforation Treatment Performed - Acid Wash - No Pressure
1992-04-14 Well Began Production
1992-04-14 Well Fluid changed to Crude Oil
1992-04-14 Well Mode changed to Flowing
1992-04-15 Perforation Treatment Performed - Jet Perforation
1992-04-15 Well Log Performed
1992-04-17 Perforation Treatment Performed - Acid Squeeze - Press Used
1992-04-20 Well Log Performed
1992-04-21 Perforation Treatment Performed - Cement Squeeze
1992-04-26 Perforation Treatment Performed - Acid Squeeze - Press Used
1992-04-26 Perforation Treatment Performed - Jet Perforation
1992-04-26 Well Log Performed
1992-04-27 Perforation Treatment Performed - Acid Squeeze - Press Used
1992-05-05 Well Log Performed
1995-10-19 Perforation Treatment Performed - Acid Squeeze - Press Used
1995-10-19 Perforation Treatment Performed - Acid Wash - No Pressure
1997-03-27 Perforation Treatment Performed - Jet Perforation
1997-03-27 Well Log Performed
1997-04-03 Perforation Treatment Performed - Acid Squeeze - Press Used
2001-11-13 Perforation Treatment Performed - Acid Squeeze - Press Used
2001-11-13 Perforation Treatment Performed - Jet Perforation
2001-11-13 Well Log Performed
2001-11-15 Perforation Treatment Performed - Acid Squeeze - Press Used
2001-11-16 Perforation Treatment Performed - Acid Squeeze - Press Used
2001-11-17 Perforation Treatment Performed - Acid Squeeze - Press Used
2001-11-18 Perforation Treatment Performed - Acid Squeeze - Press Used
2001-11-20 Well Log Performed
2001-11-27 Perforation Treatment Performed - Cement Squeeze
2001-11-29 Perforation Treatment Performed - Jet Perforation
2001-11-29 Well Log Performed
2001-12-01 Well Log Performed
2001-12-03 Perforation Treatment Performed - Cement Squeeze
2001-12-07 Perforation Treatment Performed - Jet Perforation
2001-12-07 Well Log Performed
2001-12-08 Perforation Treatment Performed - Acid Squeeze - Press Used
2001-12-09 Perforation Treatment Performed - Acid Squeeze - Press Used
2001-12-11 Perforation Treatment Performed - Acid Squeeze - Press Used
2001-12-12 Perforation Treatment Performed - Acid Squeeze - Press Used
2001-12-13 Perforation Treatment Performed - Jet Perforation
2001-12-13 Well Log Performed
2001-12-14 Perforation Treatment Performed - Acid Squeeze - Press Used
2001-12-16 Perforation Treatment Performed - Acid Squeeze - Press Used
2001-12-17 Perforation Treatment Performed - Acid Squeeze - Press Used
2001-12-19 Well Log Performed
2004-08-13 Well Fluid changed to Crude Oil
2004-08-13 Well Mode changed to Suspended
2011-09-15 Perforation Treatment Performed - Cement Squeeze
2011-09-20 Well Log Performed
2011-09-21 Perforation Treatment Performed - Jet Perforation
2011-09-21 Well Log Performed
2011-09-23 Perforation Treatment Performed - Acid Squeeze - Press Used
2011-09-24 Perforation Treatment Performed - Acid Squeeze - Press Used
2011-09-25 Perforation Treatment Performed - Acid Squeeze - Press Used
2011-09-26 Perforation Treatment Performed - Acid Squeeze - Press Used
2011-09-27 Perforation Treatment Performed - Acid Squeeze - Press Used
2011-09-30 Perforation Treatment Performed - Cement Squeeze
2011-10-05 Perforation Treatment Performed - Jet Perforation
2011-10-05 Well Log Performed
2011-10-07 Perforation Treatment Performed - Acid Squeeze - Press Used
2011-10-08 Perforation Treatment Performed - Acid Squeeze - Press Used
2011-10-09 Perforation Treatment Performed - Acid Squeeze - Press Used
2011-10-10 Perforation Treatment Performed - Acid Squeeze - Press Used
2011-10-11 Perforation Treatment Performed - Acid Squeeze - Press Used
2011-10-12 Perforation Treatment Performed - Acid Squeeze - Press Used
2011-10-20 Perforation Treatment Performed - Cement Squeeze
2011-10-25 Perforation Treatment Performed - Jet Perforation
2011-10-25 Well Log Performed
2011-10-27 Perforation Treatment Performed - Acid Squeeze - Press Used
2011-10-28 Perforation Treatment Performed - Acid Squeeze - Press Used
2011-10-29 Perforation Treatment Performed - Acid Squeeze - Press Used
2011-10-30 Perforation Treatment Performed - Acid Squeeze - Press Used
2011-10-31 Perforation Treatment Performed - Acid Squeeze - Press Used
2011-11-01 Perforation Treatment Performed - Acid Squeeze - Press Used
2011-11-03 Perforation Treatment Performed - Jet Perforation
2011-11-03 Well Log Performed
2011-11-05 Perforation Treatment Performed - Acid Squeeze - Press Used
2011-11-08 Perforation Treatment Performed - Acid Squeeze - Press Used
2011-11-11 Well Fluid changed to Crude Oil
2011-11-11 Well Mode changed to Flowing
2013-11-07 Well Fluid changed to Crude Oil
2013-11-07 Well Mode changed to Suspended

For data sources see[3]

Directional Drilling

Start Date Depth (m) Reason
1992-03-13 1310.00 Deviate (5 - 79 degrees)

For data sources see[4]

Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
1992-04-12 Perforation 1804.50 1805.50 13
1992-04-27 Acid Treatment 1804.00 1806.00 0
2011-10-30 Acid Treatment 1870.50 1871.50 0
2011-10-31 Acid Treatment 1870.50 1871.50 0
2011-11-01 Acid Treatment 1866.00 1867.00 0
2011-11-01 Acid Treatment 1861.50 1862.50 0
2011-11-03 Perforation 1810.00 1812.00 20
2011-11-05 Acid Treatment 1870.50 1871.50 0
2011-11-05 Acid Treatment 1866.00 1867.00 0
2011-11-08 Acid Treatment 1810.00 1812.00 0
1995-10-19 Acid Wash 1804.00 1832.00 0
1995-10-19 Acid Treatment 1830.00 1832.00 0
1997-03-27 Perforation 1846.00 1849.00 13
1997-04-03 Acid Treatment 1846.00 1849.00 0
2001-11-13 Perforation 1804.00 1806.00 13
2001-11-13 Perforation 1837.00 1840.50 13
2001-11-13 Perforation 1846.00 1849.00 13
2001-11-13 Perforation 1856.00 1860.00 13
2001-11-13 Perforation 1866.00 1869.00 13
1992-04-12 Perforation 1814.00 1816.00 13
2001-11-13 Acid Treatment 1804.00 1869.00 0
2001-11-15 Acid Treatment 1866.00 1869.00 0
2001-11-16 Acid Treatment 1856.00 1859.00 0
2001-11-17 Acid Treatment 1846.00 1859.00 0
2001-11-18 Acid Treatment 1804.00 1869.00 0
2001-11-27 Cement Squeeze 1804.00 1806.00 0
2001-11-27 Cement Squeeze 1814.00 1816.00 0
2001-11-27 Cement Squeeze 1820.00 1822.00 0
2001-11-27 Cement Squeeze 1825.00 1832.00 0
2001-11-29 Perforation 1804.00 1806.00 13
1992-04-12 Perforation 1820.00 1822.00 13
2001-11-29 Perforation 1837.00 1840.50 13
2001-11-29 Perforation 1846.00 1849.00 13
2001-11-29 Perforation 1856.00 1860.00 13
2001-11-29 Perforation 1866.00 1869.00 13
2001-12-03 Cement Squeeze 1804.00 1806.00 0
2001-12-03 Cement Squeeze 1837.00 1840.50 0
2001-12-03 Cement Squeeze 1846.00 1849.00 0
2001-12-03 Cement Squeeze 1856.00 1860.00 0
2001-12-03 Cement Squeeze 1866.00 1869.00 0
2001-12-07 Perforation 1804.00 1806.00 13
1992-04-13 Acid Wash 1804.50 1822.00 0
2001-12-07 Perforation 1837.00 1840.50 13
2001-12-07 Perforation 1846.00 1849.00 13
2001-12-07 Perforation 1856.00 1860.00 13
2001-12-07 Perforation 1866.00 1869.00 13
2001-12-08 Acid Treatment 1866.00 1869.00 0
2001-12-09 Acid Treatment 1846.00 1849.00 0
2001-12-11 Acid Treatment 1837.00 1840.50 0
2001-12-12 Acid Treatment 1804.00 1806.00 0
2001-12-13 Perforation 1837.50 1840.50 14
2001-12-13 Perforation 1846.50 1848.50 14
1992-04-15 Perforation 1830.00 1832.00 13
2001-12-13 Perforation 1857.00 1859.00 14
2001-12-14 Acid Treatment 1857.00 1859.00 0
2001-12-16 Acid Treatment 1846.50 1848.50 0
2001-12-17 Acid Treatment 1837.50 1840.50 0
2011-09-15 Cement Squeeze 1866.00 1869.00 0
2011-09-15 Cement Squeeze 1856.00 1860.00 0
2011-09-15 Cement Squeeze 1846.00 1849.00 0
2011-09-15 Cement Squeeze 1837.00 1840.00 0
2011-09-15 Cement Squeeze 1804.00 1806.00 0
2011-09-21 Perforation 1880.00 1881.00 20
1992-04-17 Acid Treatment 1814.00 1816.00 0
2011-09-21 Perforation 1876.00 1877.00 20
2011-09-21 Perforation 1870.50 1871.50 20
2011-09-21 Perforation 1866.00 1867.00 20
2011-09-21 Perforation 1861.50 1862.50 20
2011-09-23 Acid Treatment 1880.00 1881.00 0
2011-09-24 Acid Treatment 1876.00 1877.00 0
2011-09-25 Acid Treatment 1876.00 1877.00 0
2011-09-26 Acid Treatment 1870.00 1871.50 0
2011-09-27 Acid Treatment 1866.00 1867.00 0
2011-09-30 Cement Squeeze 1880.00 1881.00 0
1992-04-21 Cement Squeeze 1814.00 1816.00 0
2011-09-30 Cement Squeeze 1876.00 1877.00 0
2011-09-30 Cement Squeeze 1870.50 1871.50 0
2011-09-30 Cement Squeeze 1866.00 1867.00 0
2011-09-30 Cement Squeeze 1861.50 1862.50 0
2011-10-05 Perforation 1880.00 1881.00 20
2011-10-05 Perforation 1876.00 1877.00 20
2011-10-05 Perforation 1870.50 1871.50 20
2011-10-05 Perforation 1866.00 1867.00 20
2011-10-05 Perforation 1861.50 1862.50 20
2011-10-07 Acid Treatment 1880.00 1881.00 0
1992-04-26 Acid Treatment 1804.50 1805.50 0
2011-10-08 Acid Treatment 1876.00 1877.00 0
2011-10-09 Acid Treatment 1870.50 1871.50 0
2011-10-10 Acid Treatment 1866.00 1867.00 0
2011-10-11 Acid Treatment 1866.00 1867.00 0
2011-10-12 Acid Treatment 1861.50 1862.50 0
2011-10-20 Cement Squeeze 1880.00 1881.00 0
2011-10-20 Cement Squeeze 1876.00 1877.00 0
2011-10-20 Cement Squeeze 1870.50 1871.50 0
2011-10-20 Cement Squeeze 1866.00 1867.00 0
2011-10-20 Cement Squeeze 1861.50 1862.50 0
1992-04-26 Perforation 1804.00 1806.00 13
2011-10-25 Perforation 1880.00 1881.00 20
2011-10-25 Perforation 1876.00 1877.00 20
2011-10-25 Perforation 1870.50 1871.50 20
2011-10-25 Perforation 1866.00 1867.00 20
2011-10-25 Perforation 1861.50 1862.50 20
2011-10-27 Acid Treatment 1880.00 1881.00 0
2011-10-28 Acid Treatment 1880.00 1881.00 0
2011-10-28 Acid Treatment 1876.00 1877.00 0
2011-10-29 Acid Treatment 1876.00 1877.00 0
2011-10-30 Acid Treatment 1876.00 1877.00 0

For data sources see[5]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
1992 5141 0.0 0.0 0.0
1993 7005 0.0 0.0 0.0
1994 7959 0.0 0.0 0.0
1995 7538 0.0 0.0 0.0
1996 8774 0.0 0.0 0.0
1997 8469 0.0 0.0 0.0
1998 8758 0.0 0.0 0.0
1999 8464 0.0 0.0 0.0
2000 8767 0.0 0.0 0.0
2001 579 0.0 0.0 0.0
2002 236 0.0 0.0 0.0
2011 712 0.0 0.0 0.0
2012 8676 0.0 0.0 0.0
2013 5094 0.0 0.0 0.0

For data sources see[6]

Occurences

Occurence Date Occurence Type Occurence Depth (m) Occurence Control Depth (m)
1992-03-16 Lost Circulation 1714.00 1815.00
1992-03-21 Lost Circulation 1815.00 1900.00

For data sources see[7]

References