X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

1096080305000

Well Details

Well ID: 1096080305000
Loading map...
Location: 00/05-03-109-08W6/0
Location Alias: 00/05-03-09-08 W6M
Location Alias 2: 00/05-03-109-08 W6/00
Country: Canada
Province: Alberta
Township: 109
Meridian: 6
Range: 08
Section: 03
County/Municipality: Mackenzie County
Well Name: HUSKY ET AL RAINBOW 5-3-109-8
Operator Name: Husky Oil Operations Limited
License Number: 0106704
License Date: 1984-04-06
License Status: Issued
Spud Date: 1984-04-10
Final Drill Date: 1984-04-28
Well Total Depth: 1907.00 m
Surface Hole Latitude: 58.432276
Surface Hole Longitude: -119.251770

For data sources see[1][2]

Well History

Date Event
1984-04-06 Obtained License
1984-04-22 Well Log Performed
1984-04-23 Drill Stem Test Performed
1984-04-28 Finished Drilling
1984-04-28 Well Mode changed to Drilled and Cased
1984-04-29 Well Log Performed
1984-04-30 Well Log Performed
1984-05-02 Intermediate Casing Operation Performed
1984-06-11 Perforation Treatment Performed - Jet Perforation
1984-06-12 Perforation Treatment Performed - Acid Squeeze - Press Used
1984-06-12 Well Began Production
1984-06-12 Well Fluid changed to Crude Oil
1984-06-12 Well Mode changed to Flowing
1985-01-21 Perforation Treatment Performed - Jet Perforation
1988-02-15 Perforation Treatment Performed - Jet Perforation
2002-10-26 Perforation Treatment Performed - Jet Perforation
2002-10-26 Well Log Performed
2002-10-27 Perforation Treatment Performed - Acid Squeeze - Press Used
2002-10-29 Well Log Performed
2002-10-30 Perforation Treatment Performed - Cement Squeeze
2002-11-08 Perforation Treatment Performed - Acid Squeeze - Press Used
2002-11-08 Perforation Treatment Performed - Jet Perforation
2002-11-08 Well Log Performed
2002-11-10 Perforation Treatment Performed - Acid Squeeze - Press Used
2002-11-11 Perforation Treatment Performed - Acid Squeeze - Press Used
2002-11-13 Well Log Performed
2008-02-08 Well Log Performed
2009-02-02 Perforation Treatment Performed - Cement Squeeze
2009-02-09 Perforation Treatment Performed - Jet Perforation
2009-02-14 Perforation Treatment Performed - Acid Squeeze - Press Used
2009-02-15 Perforation Treatment Performed - Acid Squeeze - Press Used
2009-02-16 Perforation Treatment Performed - Acid Squeeze - Press Used
2012-05-29 Well Fluid changed to Crude Oil
2012-05-29 Well Mode changed to Suspended
2013-08-09 Perforation Treatment Performed - Cement Squeeze
2013-08-22 Well Log Performed
2013-08-26 Perforation Treatment Performed - Open-Hole Completion
2013-08-28 Well Log Performed
2013-08-30 Well Log Performed
2013-08-31 Well Log Performed
2014-05-08 Well Began Injection
2014-05-08 Well Fluid changed to Water
2014-05-08 Well Type changed to Injection
2016-02-08 Well Log Performed

For data sources see[3]


Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
1984-06-11 Perforation 1785.00 1788.00 13
2002-10-27 Acid Treatment 1849.00 1852.00 0
2002-10-27 Acid Treatment 1839.00 1845.00 0
2002-10-27 Acid Treatment 1832.50 1834.50 0
2002-10-27 Acid Treatment 1824.00 1828.00 0
2002-10-27 Acid Treatment 1785.00 1788.00 0
2002-10-30 Cement Squeeze 1824.00 1828.00 0
2002-10-30 Cement Squeeze 1811.50 1814.50 0
2002-10-30 Cement Squeeze 1801.00 1804.00 0
2002-10-30 Cement Squeeze 1785.00 1788.00 0
2002-11-08 Perforation 1849.00 1852.00 13
1984-06-11 Perforation 1824.00 1828.00 13
2002-11-08 Perforation 1839.50 1844.50 13
2002-11-08 Perforation 1833.00 1834.50 13
2002-11-08 Perforation 1824.50 1827.50 13
2002-11-08 Perforation 1785.00 1788.50 13
2002-11-08 Acid Treatment 1849.00 1852.00 0
2002-11-08 Acid Treatment 1839.50 1844.50 0
2002-11-08 Acid Treatment 1833.00 1834.50 0
2002-11-10 Acid Treatment 1833.00 1834.50 0
2002-11-10 Acid Treatment 1839.50 1844.50 0
2002-11-10 Acid Treatment 1824.50 1827.50 0
1984-06-12 Acid Treatment 1824.00 1828.00 0
2002-11-11 Acid Treatment 1839.50 1844.50 0
2002-11-11 Acid Treatment 1833.00 1834.50 0
2002-11-11 Acid Treatment 1785.00 1788.00 0
2009-02-02 Cement Squeeze 1849.00 1852.00 0
2009-02-02 Cement Squeeze 1839.50 1844.50 0
2009-02-02 Cement Squeeze 1833.00 1834.00 0
2009-02-02 Cement Squeeze 1824.50 1827.50 0
2009-02-02 Cement Squeeze 1785.00 1788.50 0
2009-02-09 Perforation 1864.00 1866.00 13
2009-02-09 Perforation 1858.00 1862.00 13
1984-06-12 Acid Treatment 1785.00 1788.00 0
2009-02-09 Perforation 1852.00 1855.00 13
2009-02-09 Perforation 1842.00 1844.50 13
2009-02-09 Perforation 1785.00 1788.00 13
2009-02-14 Acid Treatment 1842.00 1844.50 0
2009-02-15 Acid Treatment 1864.00 1866.00 0
2009-02-16 Acid Treatment 1785.00 1788.00 0
2013-08-09 Cement Squeeze 1864.00 1866.00 0
2013-08-09 Cement Squeeze 1858.00 1862.00 0
2013-08-09 Cement Squeeze 1852.00 1855.00 0
2013-08-09 Cement Squeeze 1842.00 1844.50 0
1985-01-21 Perforation 1811.50 1814.50 13
2013-08-09 Cement Squeeze 1785.00 1788.00 0
2013-08-26 Open Hole/Barefoot Completion 1890.00 1907.00 0
1985-01-21 Perforation 1801.00 1804.00 13
1988-02-15 Perforation 1839.00 1845.00 13
2002-10-26 Perforation 1849.00 1852.00 13
2002-10-26 Perforation 1832.50 1834.50 13

For data sources see[4]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
1984 4083 0.0 0.0 0.0
1985 7934 0.0 0.0 0.0
1986 8456 0.0 0.0 0.0
1987 8579 0.0 0.0 0.0
1988 8445 0.0 0.0 0.0
1989 8209 0.0 0.0 0.0
1990 8032 0.0 0.0 0.0
1991 7054 0.0 0.0 0.0
1992 8050 0.0 0.0 0.0
1993 8257 0.0 0.0 0.0
1994 8383 0.0 0.0 0.0
1995 8751 0.0 0.0 0.0
1996 8721 0.0 0.0 0.0
1997 8758 0.0 0.0 0.0
1998 8758 0.0 0.0 0.0
1999 8477 0.0 0.0 0.0
2000 7276 0.0 0.0 0.0
2001 384 0.0 0.0 0.0
2002 1099 0.0 0.0 0.0
2003 8280 0.0 0.0 0.0
2004 8744 0.0 0.0 0.0
2005 8751 0.0 0.0 0.0
2006 7966 0.0 0.0 0.0
2007 8626 0.0 0.0 0.0
2008 5694 0.0 0.0 0.0
2009 5682 0.0 0.0 0.0
2010 2541 0.0 0.0 0.0
2011 55 0.0 0.0 0.0
2014 0 0.0 0.0 0.0
2015 0 0.0 0.0 0.0
2016 0 0.0 0.0 0.0
2017 0 0.0 0.0 0.0
2018 0 0.0 0.0 0.0
2019 0 0.0 0.0 0.0
2020 0 0.0 0.0 0.0

For data sources see[5]

Occurences

Occurence Date Occurence Type Occurence Depth (m) Occurence Control Depth (m)
2013-09-03 No Incident Encountered 0.00 0.00
2002-11-14 No Incident Encountered 0.00 0.00
2016-02-11 No Incident Encountered 0.00 0.00

For data sources see[6]

References