X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

1096071807020

Well Details

Well ID: 1096071807020
Loading map...
Location: 02/07-18-109-07W6/0
Location Alias: 02/07-18-09-07 W6M
Location Alias 2: 02/07-18-109-07 W6/00
Country: Canada
Province: Alberta
Township: 109
Meridian: 6
Range: 07
Section: 18
County/Municipality: Mackenzie County
Well Name: HUSKY MOBIL RAIN 7-18RN-109-7
Operator Name: Husky Oil Operations Limited
License Number: 0041998
License Date: 1972-01-27
License Status: Suspension
Spud Date: 1972-02-08
Final Drill Date: 1972-03-02
Well Total Depth: 1905.00 m
Surface Hole Latitude: 58.463078
Surface Hole Longitude: -119.153461

For data sources see[1][2]

Well History

Date Event
1909-09-09 Well Log Performed
1972-01-27 Obtained License
1972-02-26 Liner Casing Operation Performed
1972-03-02 Finished Drilling
1972-03-02 Well Mode changed to Drilled and Cased
1972-03-05 Perforation Treatment Performed - Acid Squeeze - Press Used
1972-03-05 Perforation Treatment Performed - Jet Perforation
1972-10-08 Well Began Production
1972-10-08 Well Fluid changed to Crude Oil
1972-10-08 Well Mode changed to Flowing
1972-10-26 Perforation Treatment Performed - Acid Squeeze - Press Used
1982-11-21 Perforation Treatment Performed - Acid Squeeze - Press Used
1982-11-24 Perforation Treatment Performed - Jet Perforation
1982-11-27 Perforation Treatment Performed - Acid Squeeze - Press Used
1982-11-30 Perforation Treatment Performed - Jet Perforation
1982-12-03 Perforation Treatment Performed - Acid Squeeze - Press Used
1982-12-11 Perforation Treatment Performed - Cement Squeeze
1982-12-14 Perforation Treatment Performed - Jet Perforation
1982-12-20 Perforation Treatment Performed - Acid Squeeze - Press Used
1989-05-05 Perforation Treatment Performed - Jet Perforation
1989-05-06 Perforation Treatment Performed - Acid Squeeze - Press Used
1989-05-09 Perforation Treatment Performed - Cement Squeeze
1989-05-13 Perforation Treatment Performed - Jet Perforation
1989-05-16 Perforation Treatment Performed - Acid Squeeze - Press Used
1989-05-18 Perforation Treatment Performed - Acid Squeeze - Press Used
1989-05-19 Perforation Treatment Performed - Jet Perforation
1989-05-20 Perforation Treatment Performed - Acid Squeeze - Press Used
1989-05-21 Perforation Treatment Performed - Acid Squeeze - Press Used
1989-05-24 Perforation Treatment Performed - Jet Perforation
1989-05-24 Well Fluid changed to Crude Oil
1989-05-24 Well Mode changed to Flowing
1989-05-25 Perforation Treatment Performed - Acid Squeeze - Press Used
1989-05-28 Perforation Treatment Performed - Jet Perforation
1989-05-29 Perforation Treatment Performed - Jet Perforation
1989-05-31 Perforation Treatment Performed - Acid Squeeze - Press Used
1989-06-01 Perforation Treatment Performed - Acid Squeeze - Press Used
1989-06-02 Perforation Treatment Performed - Acid Squeeze - Press Used
1989-06-03 Perforation Treatment Performed - Acid Squeeze - Press Used
1989-06-07 Perforation Treatment Performed - Acid Squeeze - Press Used
1993-11-03 Perforation Treatment Performed - Nitrogen Treatment
1995-01-23 Well Log Performed
1995-01-24 Perforation Treatment Performed - Acid Squeeze - Press Used
1995-01-24 Perforation Treatment Performed - Jet Perforation
1995-01-25 Perforation Treatment Performed - Acid Squeeze - Press Used
1995-01-25 Well Log Performed
1996-06-09 Perforation Treatment Performed - Jet Perforation
1996-06-10 Perforation Treatment Performed - Acid Squeeze - Press Used
1996-06-13 Perforation Treatment Performed - Acid Squeeze - Press Used
1996-06-15 Well Log Performed
2007-12-09 Perforation Treatment Performed - Bridge Plug Capped W/Cement
2007-12-19 Well Fluid changed to Crude Oil
2007-12-19 Well Mode changed to Suspended

For data sources see[3]


Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
1972-03-05 Perforation 1853.20 1859.30 7
1982-12-11 Cement Squeeze 1853.20 1874.00 0
1982-12-14 Perforation 1857.00 1859.50 13
1982-12-20 Acid Treatment 1857.00 1859.50 0
1989-05-05 Perforation 1871.50 1872.50 13
1989-05-06 Acid Treatment 1871.50 1872.50 0
1989-05-09 Cement Squeeze 1857.00 1859.50 0
1989-05-13 Perforation 1868.50 1870.50 13
1989-05-16 Acid Treatment 1868.50 1870.50 0
1989-05-18 Acid Treatment 1868.50 1870.50 0
1989-05-19 Perforation 1864.00 1866.00 13
1972-03-05 Perforation 1860.20 1864.50 7
1989-05-20 Acid Treatment 1864.00 1866.00 0
1989-05-21 Acid Treatment 1864.00 1866.00 0
1989-05-24 Perforation 1748.00 1749.50 26
1989-05-24 Perforation 1745.00 1747.00 26
1989-05-24 Perforation 1738.00 1739.00 26
1989-05-24 Perforation 1727.00 1729.50 26
1989-05-24 Perforation 1719.00 1721.00 26
1989-05-24 Perforation 1712.50 1714.00 26
1989-05-25 Acid Treatment 1745.00 1749.50 0
1989-05-28 Perforation 1740.00 1741.50 26
1972-03-05 Acid Treatment 1860.20 1864.50 0
1989-05-28 Perforation 1722.00 1725.50 26
1989-05-29 Perforation 1706.00 1707.50 26
1989-05-29 Perforation 1703.20 1705.20 26
1989-05-29 Perforation 1698.00 1699.50 26
1989-05-29 Perforation 1691.00 1694.50 26
1989-05-29 Perforation 1688.00 1689.80 26
1989-05-29 Perforation 1683.00 1684.50 26
1989-05-31 Acid Treatment 1719.00 1749.50 0
1989-06-01 Acid Treatment 1712.50 1714.00 0
1989-06-02 Acid Treatment 1683.00 1707.50 0
1972-10-26 Acid Treatment 1853.20 1864.50 0
1989-06-03 Acid Treatment 1683.00 1684.50 0
1989-06-07 Acid Treatment 1683.00 1749.50 0
1993-11-03 Nitrogen Treatment 1864.00 1872.50 0
1995-01-24 Perforation 1875.00 1878.00 13
1995-01-24 Acid Treatment 1875.00 1878.00 0
1995-01-25 Acid Treatment 1875.00 1878.00 0
1996-06-09 Perforation 1885.00 1886.00 13
1996-06-09 Perforation 1891.50 1892.50 13
1996-06-10 Acid Treatment 1885.00 1892.50 0
1996-06-13 Acid Treatment 1683.00 1749.50 0
1982-11-21 Acid Treatment 1853.20 1864.50 0
2007-12-09 Packing Device Capped w/Cement 1779.00 1792.00 0
1982-11-24 Perforation 1870.00 1874.00 13
1982-11-27 Acid Treatment 1870.00 1874.00 0
1982-11-30 Perforation 1861.00 1866.00 13
1982-12-03 Acid Treatment 1853.20 1874.00 0

For data sources see[4]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
1972 1763 0.0 0.0 0.0
1973 8248 0.0 0.0 0.0
1974 7882 0.0 0.0 0.0
1975 7624 0.0 0.0 0.0
1976 7691 0.0 0.0 0.0
1977 7333 0.0 0.0 0.0
1978 7179 0.0 0.0 0.0
1979 8435 0.0 0.0 0.0
1980 8578 0.0 0.0 0.0
1981 8426 0.0 0.0 0.0
1982 7330 0.0 0.0 0.0
1983 8590 0.0 0.0 0.0
1984 8305 0.0 0.0 0.0
1985 8630 0.0 0.0 0.0
1986 8541 0.0 0.0 0.0
1987 8187 0.0 0.0 0.0
1988 8401 0.0 0.0 0.0
1989 7583 0.0 0.0 0.0
1990 8389 0.0 0.0 0.0
1991 7826 0.0 0.0 0.0
1992 8287 0.0 0.0 0.0
1993 7855 0.0 0.0 0.0
1994 2254 0.0 0.0 0.0
1995 7424 0.0 0.0 0.0
1996 7588 0.0 0.0 0.0
1997 5693 0.0 0.0 0.0
1998 4240 0.0 0.0 0.0
1999 17 0.0 0.0 0.0
2003 7647 0.0 0.0 0.0
2004 8432 0.0 0.0 0.0
2005 8180 0.0 0.0 0.0
2006 6900 0.0 0.0 0.0
2007 2302 0.0 0.0 0.0

For data sources see[5]

References