X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

1096060611000

Well Details

Well ID: 1096060611000
Loading map...
Location: 00/11-06-109-06W6/0
Location Alias: 00/11-06-09-06 W6M
Location Alias 2: 00/11-06-109-06 W6/00
Country: Canada
Province: Alberta
Township: 109
Meridian: 6
Range: 06
Section: 06
County/Municipality: Mackenzie County
Well Name: HUSKY RAINBOW 11-6-109-6
Operator Name: Husky Oil Operations Limited
License Number: 0078529
License Date: 1979-10-10
License Status: Suspension
Spud Date: 1979-10-30
Final Drill Date: 1979-12-15
Well Total Depth: 1904.00 m
Surface Hole Latitude: 58.436575
Surface Hole Longitude: -118.995061

For data sources see[1][2]

Well History

Date Event
1909-09-09 Well Log Performed
1979-10-10 Obtained License
1979-11-28 Production Casing Operation Performed
1979-12-15 Finished Drilling
1979-12-15 Perforation Treatment Performed - Open-Hole Completion
1979-12-15 Well Mode changed to Drilled and Cased
1979-12-16 Perforation Treatment Performed - Bridge Plug Capped W/Cement
1979-12-16 Perforation Treatment Performed - Open-Hole Completion
1979-12-16 Well Log Performed
1980-03-26 Perforation Treatment Performed - Jet Perforation
1980-04-12 Well Began Production
1980-04-12 Well Fluid changed to Crude Oil
1980-04-12 Well Mode changed to Flowing
1983-04-27 Well Log Performed
1984-04-28 Well Log Performed
1984-09-15 Perforation Treatment Performed - Open-Hole Completion
1984-09-22 Well Log Performed
1984-09-23 Liner Casing Operation Performed
1984-09-23 Perforation Treatment Performed - Cement Squeeze
1984-09-27 Well Log Performed
1984-09-28 Perforation Treatment Performed - Acid Squeeze - Press Used
1984-09-28 Perforation Treatment Performed - Jet Perforation
1984-09-28 Well Log Performed
1984-10-10 Well Log Performed
1984-10-11 Perforation Treatment Performed - Bridge Plug Capped W/Cement
1984-10-11 Perforation Treatment Performed - Jet Perforation
1984-10-12 Perforation Treatment Performed - Acid Squeeze - Press Used
1985-08-30 Perforation Treatment Performed - Jet Perforation
1985-08-30 Well Log Performed
1985-08-31 Perforation Treatment Performed - Acid Squeeze - Press Used
1985-09-07 Well Log Performed
1985-09-08 Perforation Treatment Performed - Bridge Plug Capped W/Cement
1985-09-08 Perforation Treatment Performed - Jet Perforation
1985-09-08 Plug Back Performed
1985-09-09 Perforation Treatment Performed - Acid Squeeze - Press Used
1986-03-09 Well Fluid changed to Crude Oil
1986-03-09 Well Mode changed to Pumping
1986-12-28 Perforation Treatment Performed - Jet Perforation
1986-12-30 Perforation Treatment Performed - Jet Perforation
1986-12-30 Well Log Performed
1986-12-31 Perforation Treatment Performed - Fractured
1986-12-31 Well Log Performed
1991-08-05 Well Log Performed
1991-08-06 Well Log Performed
1992-04-02 Well Began Injection
1992-04-02 Well Fluid changed to Solvent
1992-04-02 Well Type changed to Injection
1993-05-01 Well Fluid changed to Crude Oil
1993-05-01 Well Mode changed to Flowing
1993-10-06 Perforation Treatment Performed - Jet Perforation
1993-10-07 Perforation Treatment Performed - Acid Squeeze - Press Used
1997-01-21 Perforation Treatment Performed - Jet Perforation
2000-05-01 Well Fluid changed to Water
2000-05-01 Well Type changed to Injection
2005-11-30 Well Fluid changed to Water
2005-11-30 Well Mode changed to Suspended
2005-11-30 Well Type changed to Injection

For data sources see[3]


Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
1979-12-15 Open Hole/Barefoot Completion 1731.50 1904.00 0
1984-10-11 Perforation 1770.00 1775.00 13
1984-10-12 Acid Treatment 1770.00 1775.00 0
1985-08-30 Perforation 1803.00 1811.00 13
1985-08-31 Acid Treatment 1803.00 1811.00 0
1985-09-08 Packing Device Capped w/Cement 1799.00 1802.00 0
1985-09-08 Perforation 1791.00 1794.00 13
1985-09-09 Acid Treatment 1791.00 1794.00 0
1986-12-28 Perforation 1803.00 1811.00 13
1986-12-30 Perforation 1845.00 1848.50 13
1986-12-30 Perforation 1836.00 1840.50 13
1979-12-16 Packing Device Capped w/Cement 1870.00 1870.00 0
1986-12-30 Perforation 1814.00 1816.00 13
1986-12-31 Fracture 1803.00 1848.50 0
1993-10-06 Perforation 1868.00 1875.00 13
1993-10-06 Perforation 1857.00 1860.00 13
1993-10-07 Acid Treatment 1857.00 1860.00 0
1997-01-21 Perforation 1879.00 1882.00 18
1979-12-16 Open Hole/Barefoot Completion 1731.50 1870.00 0
1980-03-26 Perforation 1764.00 1771.00 13
1984-09-15 Open Hole/Barefoot Completion 1731.50 1904.00 0
1984-09-23 Cement Squeeze 1731.50 1904.00 0
1984-09-28 Perforation 1803.00 1811.00 13
1984-09-28 Acid Treatment 1803.00 1811.00 0
1984-10-11 Packing Device Capped w/Cement 1787.00 1790.00 0

For data sources see[4]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
1980 4291 0.0 0.0 0.0
1981 5552 0.0 0.0 0.0
1982 7697 0.0 0.0 0.0
1983 6497 0.0 0.0 0.0
1984 5211 0.0 0.0 0.0
1985 3020 0.0 0.0 0.0
1986 7213 0.0 0.0 0.0
1987 4772 0.0 0.0 0.0
1988 3833 0.0 0.0 0.0
1989 4282 0.0 0.0 0.0
1990 5612 0.0 0.0 0.0
1991 7890 0.0 0.0 0.0
1992 1843 0.0 0.0 0.0
1993 4391 0.0 0.0 0.0
1994 7496 0.0 0.0 0.0
1995 8523 0.0 0.0 0.0
1996 7987 0.0 0.0 0.0
1997 5696 0.0 0.0 0.0
2000 0 0.0 0.0 0.0
2001 0 0.0 0.0 0.0
2002 0 0.0 0.0 0.0
2003 0 0.0 0.0 0.0

For data sources see[5]

References