X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

1096060606000

Well Details

Well ID: 1096060606000
Loading map...
Location: 00/06-06-109-06W6/0
Location Alias: 00/06-06-09-06 W6M
Location Alias 2: 00/06-06-109-06 W6/00
Country: Canada
Province: Alberta
Township: 109
Meridian: 6
Range: 06
Section: 06
County/Municipality: Mackenzie County
Well Name: HUBER ET AL RAINBOW 6-6-109-6
Operator Name: ExxonMobil Canada Ltd.
License Number: 0035563
License Date: 1969-01-06
License Status: RecCertified
Spud Date: 1969-01-26
Final Drill Date: 1969-02-11
Well Total Depth: 1937.00 m
Surface Hole Latitude: 58.433209
Surface Hole Longitude: -118.995245

For data sources see[1][2]

Well History

Date Event
1909-09-09 Well Log Performed
1969-01-06 Obtained License
1969-02-11 Finished Drilling
1969-02-11 Well Log Performed
1969-02-11 Well Mode changed to Drilled and Cased
1969-02-13 Production Casing Operation Performed
1969-02-19 Perforation Treatment Performed - Jet Perforation
1969-02-22 Well Began Production
1969-02-22 Well Fluid changed to Crude Oil
1969-02-22 Well Mode changed to Flowing
1973-01-05 Perforation Treatment Performed - Cement Squeeze
1973-01-05 Perforation Treatment Performed - Jet Perforation
1974-12-12 Well Fluid changed to Crude Oil
1974-12-12 Well Mode changed to Suspended
1976-08-10 Perforation Treatment Performed - Bridge Plug Capped W/Cement
1976-12-02 Perforation Treatment Performed - Jet Perforation
1976-12-04 Perforation Treatment Performed - Acid Squeeze - Press Used
1976-12-09 Perforation Treatment Performed - Cement Squeeze
1976-12-13 Perforation Treatment Performed - Cement Squeeze
1976-12-19 Perforation Treatment Performed - Jet Perforation
1976-12-19 Well Fluid changed to Crude Oil
1976-12-19 Well Mode changed to Abandoned Zone
1976-12-22 Perforation Treatment Performed - Acid Squeeze - Press Used
1985-06-02 Perforation Treatment Performed - Fractured
1990-06-11 Perforation Treatment Performed - Bridge Plug Capped W/Cement
1990-06-11 Perforation Treatment Performed - Cement Plug
1990-06-11 Perforation Treatment Performed - Cement Squeeze
1990-06-11 Plug Back Performed
1990-06-12 Well Abandoned

For data sources see[3]


Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
1969-02-19 Perforation 1829.40 1832.50 7
1976-12-19 Perforation 1666.00 1668.50 7
1976-12-19 Perforation 1674.60 1677.60 7
1976-12-22 Acid Treatment 1666.00 1677.60 0
1985-06-02 Fracture 1666.00 1677.60 0
1990-06-11 Cement Squeeze 1666.00 1677.60 0
1990-06-11 Packing Device Capped w/Cement 1520.00 1643.00 0
1990-06-11 Cement Plug 360.00 761.00 0
1973-01-05 Perforation 1845.30 1846.50 13
1973-01-05 Cement Squeeze 1845.30 1846.50 0
1976-08-10 Packing Device Capped w/Cement 1813.60 1822.70 0
1976-12-02 Perforation 1666.00 1670.00 7
1976-12-02 Perforation 1674.60 1677.60 7
1976-12-04 Acid Treatment 1666.00 1677.60 0
1976-12-09 Cement Squeeze 1666.00 1677.60 0
1976-12-13 Cement Squeeze 1666.00 1677.60 0

For data sources see[4]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
1969 2079 0.0 0.0 0.0
1970 4571 0.0 0.0 0.0
1971 3554 0.0 0.0 0.0
1972 5978 0.0 0.0 0.0
1973 5075 0.0 0.0 0.0
1974 1339 0.0 0.0 0.0

For data sources see[5]

References