X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

1096060513002

Well Details

Well ID: 1096060513002
Loading map...
Location: 00/13-05-109-06W6/2
Location Alias: 00/13-05-09-06 W6M
Location Alias 2: 00/13-05-109-06 W6/02
Country: Canada
Province: Alberta
Township: 109
Meridian: 6
Range: 06
Section: 05
County/Municipality: Mackenzie County
Well Name: SLE RAINBOW 13-5-109-6
Operator Name: SanLing Energy Ltd.
License Number: 0125340
License Date: 1986-12-22
License Status: Issued
Spud Date: 1986-12-31
Final Drill Date: 1987-01-19
Well Total Depth: 1911.00 m
Surface Hole Latitude: 58.439437
Surface Hole Longitude: -118.971367

For data sources see[1][2]

Well History

Date Event
1986-12-22 Obtained License
1987-01-01 Surface Casing Operation Performed
1987-01-15 Lost Circulation Occurred
1987-01-16 Well Log Performed
1987-01-18 Well Log Performed
1987-01-19 Finished Drilling
1987-01-19 Well Log Performed
1987-01-19 Well Mode changed to Drilled and Cased
1987-01-21 Production Casing Operation Performed
1987-01-21 Rig Released
1987-07-09 Well Log Performed
1987-07-10 Perforation Treatment Performed - Jet Perforation
1987-07-10 Well Log Performed
1989-03-27 Well Log Performed
1989-05-16 Well Log Performed
1989-05-18 Well Log Performed
1989-05-26 Well Log Performed
1989-05-27 Perforation Treatment Performed - Jet Perforation
1989-06-08 Well Log Performed
1989-06-16 Well Began Injection
1989-06-16 Well Fluid changed to Water
1989-06-16 Well Type changed to Injection
1989-12-06 Well Log Performed
1989-12-08 Well Log Performed
1990-06-01 Well Fluid changed to Water
1990-06-01 Well Mode changed to Suspended
1990-06-01 Well Type changed to Injection
1990-07-03 Well Log Performed
1990-07-05 Well Log Performed
1990-07-07 Perforation Treatment Performed - Cement Squeeze
1990-07-07 Well Log Performed
1990-07-08 Perforation Treatment Performed - Cement Squeeze
1990-07-08 Well Log Performed
1990-07-14 Perforation Treatment Performed - Jet Perforation
1990-07-14 Well Log Performed
1990-07-19 Perforation Treatment Performed - Jet Perforation
1990-07-19 Well Log Performed
1990-07-25 Perforation Treatment Performed - Cement Squeeze
1990-07-25 Well Log Performed
1990-07-26 Perforation Treatment Performed - Cement Squeeze
1990-07-26 Well Log Performed
1990-08-01 Perforation Treatment Performed - Acid Squeeze - Press Used
1990-08-01 Perforation Treatment Performed - Jet Perforation
1990-08-01 Well Log Performed
1998-01-24 Well Log Performed
1998-01-26 Perforation Treatment Performed - Jet Perforation
2008-08-18 Perforation Treatment Performed - Bridge Plug Capped W/Cement
2008-08-18 Perforation Treatment Performed - Jet Perforation
2008-08-18 Plug Back Performed
2008-08-18 Well Log Performed

For data sources see[3]


Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
1987-07-10 Perforation 1838.00 1842.00 13
1990-08-01 Perforation 1839.00 1844.00 13
1990-08-01 Acid Treatment 1839.00 1844.00 0
1998-01-26 Perforation 1829.50 1834.00 13
2008-08-18 Packing Device Capped w/Cement 1795.00 1803.00 0
2008-08-18 Perforation 1784.00 1789.00 13
2008-08-18 Perforation 1779.00 1784.00 13
1987-07-10 Perforation 1848.00 1852.50 13
1989-05-27 Perforation 1888.00 1891.00 13
1990-07-07 Cement Squeeze 1848.00 1852.50 0
1990-07-08 Cement Squeeze 1838.00 1842.00 0
1990-07-14 Perforation 1819.00 1826.00 13
1990-07-19 Perforation 1806.50 1809.00 13
1990-07-25 Cement Squeeze 1819.00 1826.00 0
1990-07-26 Cement Squeeze 1806.50 1809.00 0

For data sources see[4]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
1989 0 0.0 0.0 0.0
1990 0 0.0 0.0 0.0

For data sources see[5]

Occurences

Occurence Date Occurence Type Occurence Depth (m) Occurence Control Depth (m)
1987-01-15 Lost Circulation 1810.00 1860.00

For data sources see[6]

References