X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

1086100208002

Well Details

Well ID: 1086100208002
Loading map...
Location: 00/08-02-108-10W6/2
Location Alias: 00/08-02-08-10 W6M
Location Alias 2: 00/08-02-108-10 W6/02
Country: Canada
Province: Alberta
Township: 108
Meridian: 6
Range: 10
Section: 02
County/Municipality: Mackenzie County
Well Name: HUSKY ET AL RAINS 8-2-108-10
Operator Name: Husky Oil Operations Limited
License Number: 0057639
License Date: 1976-03-19
License Status: Issued
Spud Date: 1976-03-24
Final Drill Date: 1976-04-10
Well Total Depth: 1914.10 m
Surface Hole Latitude: 58.344240
Surface Hole Longitude: -119.535327

For data sources see[1][2]

Well History

Date Event
1909-09-09 Well Log Performed
1976-03-19 Obtained License
1976-04-10 Finished Drilling
1976-04-10 Well Mode changed to Drilled and Cased
1976-04-11 Production Casing Operation Performed
1976-04-14 Perforation Treatment Performed - Acid Wash - No Pressure
1976-04-14 Perforation Treatment Performed - Jet Perforation
1988-07-22 Perforation Treatment Performed - Cement Squeeze
1988-07-25 Perforation Treatment Performed - Jet Perforation
1988-07-27 Perforation Treatment Performed - Acid Squeeze - Press Used
1988-08-10 Perforation Treatment Performed - Cement Squeeze
1988-08-14 Perforation Treatment Performed - Jet Perforation
1992-02-22 Perforation Treatment Performed - Jet Perforation
1994-04-02 Perforation Treatment Performed - Jet Perforation
1994-04-04 Perforation Treatment Performed - Acid Squeeze - Press Used
1994-04-05 Perforation Treatment Performed - Acid Squeeze - Press Used
1994-04-06 Perforation Treatment Performed - Acid Squeeze - Press Used
1994-04-07 Perforation Treatment Performed - Acid Squeeze - Press Used
1994-04-08 Perforation Treatment Performed - Acid Squeeze - Press Used
1994-04-12 Perforation Treatment Performed - Cement Squeeze
1994-05-06 Well Began Production
1994-05-06 Well Fluid changed to Crude Oil
1994-05-06 Well Mode changed to Pumping
1994-07-24 Well Log Performed
2001-07-09 Perforation Treatment Performed - Cement Squeeze
2001-07-09 Well Log Performed
2001-08-29 Perforation Treatment Performed - Cement Squeeze
2001-09-05 Perforation Treatment Performed - Acid Squeeze - Press Used
2001-09-05 Perforation Treatment Performed - Jet Perforation
2001-09-05 Well Log Performed
2001-09-07 Perforation Treatment Performed - Acid Squeeze - Press Used
2001-09-08 Perforation Treatment Performed - Acid Squeeze - Press Used
2001-09-10 Well Log Performed
2001-09-12 Well Log Performed
2001-09-15 Well Log Performed
2002-10-01 Well Fluid changed to Crude Oil
2002-10-01 Well Mode changed to Suspended
2003-06-26 Well Log Performed
2006-10-06 Well Log Performed
2014-04-19 Well Log Performed

For data sources see[3]


Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
1976-04-14 Perforation 1891.60 1897.70 13
1988-08-14 Perforation 1866.50 1869.50 13
1988-08-14 Perforation 1872.50 1877.50 13
1988-08-14 Perforation 1880.80 1883.30 13
1992-02-22 Perforation 1854.50 1857.00 13
1992-02-22 Perforation 1860.00 1863.50 13
1994-04-02 Perforation 1805.50 1807.50 13
1994-04-02 Perforation 1810.00 1815.00 13
1994-04-02 Perforation 1817.50 1823.50 13
1994-04-02 Perforation 1825.00 1827.00 13
1994-04-02 Perforation 1829.00 1830.00 13
1976-04-14 Perforation 1900.10 1903.20 13
1994-04-02 Perforation 1831.00 1836.00 13
1994-04-02 Perforation 1838.50 1841.50 13
1994-04-02 Perforation 1843.50 1850.50 13
1994-04-04 Acid Treatment 1843.50 1850.50 0
1994-04-05 Acid Treatment 1843.50 1850.50 0
1994-04-06 Acid Treatment 1825.00 1841.50 0
1994-04-07 Acid Treatment 1817.50 1823.50 0
1994-04-08 Acid Treatment 1805.50 1815.00 0
1994-04-12 Cement Squeeze 1805.50 1815.00 0
2001-07-09 Cement Squeeze 1817.50 1823.50 0
1976-04-14 Acid Wash 1891.60 1903.20 0
2001-07-09 Cement Squeeze 1825.00 1827.00 0
2001-07-09 Cement Squeeze 1829.00 1830.00 0
2001-07-09 Cement Squeeze 1831.00 1836.00 0
2001-08-29 Cement Squeeze 1866.50 1869.50 0
2001-08-29 Cement Squeeze 1860.00 1863.50 0
2001-08-29 Cement Squeeze 1854.50 1857.00 0
2001-08-29 Cement Squeeze 1838.50 1841.50 0
2001-08-29 Cement Squeeze 1843.50 1850.50 0
2001-09-05 Perforation 1892.00 1897.00 13
2001-09-05 Perforation 1880.80 1883.30 13
1988-07-22 Cement Squeeze 1891.60 1903.20 0
2001-09-05 Perforation 1866.50 1869.50 13
2001-09-05 Perforation 1860.00 1863.50 13
2001-09-05 Perforation 1855.00 1857.00 13
2001-09-05 Acid Treatment 1855.00 1857.00 0
2001-09-07 Acid Treatment 1880.80 1883.30 0
2001-09-07 Acid Treatment 1880.80 1883.30 0
2001-09-08 Acid Treatment 1855.00 1857.00 0
1988-07-25 Perforation 1872.50 1883.00 13
1988-07-25 Perforation 1885.00 1887.50 13
1988-07-25 Perforation 1891.60 1897.70 13
1988-07-27 Acid Treatment 1872.50 1897.70 0
1988-08-10 Cement Squeeze 1872.50 1883.00 0

For data sources see[4]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
1994 4551 0.0 0.0 0.0
1995 4708 0.0 0.0 0.0

For data sources see[5]

Occurences

Occurence Date Occurence Type Occurence Depth (m) Occurence Control Depth (m)
2014-04-25 No Incident Encountered 0.00 0.00

For data sources see[6]

References