If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.
powered by ChangeDetection
Well ID: 1086100201020 | Loading map...
{"type":"SATELLITE","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"100%","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"wmsoverlay":false,"copycoords":false,"static":false,"zoom":14,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"markercluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","enablefullscreen":false,"scrollwheelzoom":false,"locations":[{"text":"","title":"","link":"","lat":58.34229,"lon":-119.538834,"icon":""}]} |
Location: 02/01-02-108-10W6/0 | |
Location Alias: 02/01-02-08-10 W6M | |
Location Alias 2: 02/01-02-108-10 W6/00 | |
Country: Canada | |
Province: Alberta | |
Township: 108 | |
Meridian: 6 | |
Range: 10 | |
Section: 02 | |
County/Municipality: Mackenzie County | |
Well Name: HUSKY MOBIL 102 RAINS 1-2-108-10 | |
Operator Name: Husky Oil Operations Limited | |
License Number: 0186677 | |
License Date: 1996-03-11 | |
License Status: Suspension | |
Spud Date: 1996-03-16 | |
Final Drill Date: 1996-03-31 | |
Well Total Depth: 2042.00 m | |
Surface Hole Latitude: 58.342290 | |
Surface Hole Longitude: -119.538834 |
Date | Event |
---|---|
1996-03-11 | Obtained License |
1996-03-18 | Surface Casing Operation Performed |
1996-03-22 | Direction Drilling Operation Performed - Deviate |
1996-03-28 | Well Log Performed |
1996-03-29 | Intermediate Casing Operation Performed |
1996-03-31 | Finished Drilling |
1996-03-31 | Lost Circulation Occurred |
1996-03-31 | Well Mode changed to Drilled and Cased |
1996-04-01 | Well Log Performed |
1996-04-02 | Well Log Performed |
1996-04-03 | Kick Occurred |
1996-04-03 | Liner Casing Operation Performed |
1996-04-03 | Well Log Performed |
1996-04-04 | Rig Released |
1996-04-10 | Well Log Performed |
1996-04-11 | Well Log Performed |
1996-04-17 | Perforation Treatment Performed - Jet Perforation |
1996-04-17 | Well Log Performed |
1996-04-18 | Perforation Treatment Performed - Acid Squeeze - Press Used |
1996-04-19 | Perforation Treatment Performed - Acid Squeeze - Press Used |
1996-04-20 | Perforation Treatment Performed - Acid Squeeze - Press Used |
1996-04-22 | Perforation Treatment Performed - Cement Squeeze |
1996-04-22 | Well Log Performed |
1996-04-26 | Perforation Treatment Performed - Jet Perforation |
1996-04-26 | Well Log Performed |
1996-04-27 | Perforation Treatment Performed - Acid Squeeze - Press Used |
1996-04-29 | Perforation Treatment Performed - Jet Perforation |
1996-04-29 | Well Log Performed |
1996-04-30 | Perforation Treatment Performed - Acid Squeeze - Press Used |
1996-05-01 | Well Began Production |
1996-05-01 | Well Fluid changed to Crude Oil |
1996-05-01 | Well Mode changed to Flowing |
1996-05-02 | Perforation Treatment Performed - Cement Squeeze |
1996-05-06 | Perforation Treatment Performed - Jet Perforation |
1996-05-06 | Well Log Performed |
1996-05-07 | Perforation Treatment Performed - Acid Squeeze - Press Used |
1996-05-09 | Perforation Treatment Performed - Jet Perforation |
1996-05-09 | Well Log Performed |
1996-05-20 | Perforation Treatment Performed - Acid Squeeze - Press Used |
1997-11-30 | Well Log Performed |
2009-10-20 | Well Fluid changed to Crude Oil |
2009-10-20 | Well Mode changed to Gas Lift |
2013-01-26 | Perforation Treatment Performed - Jet Perforation |
2013-01-27 | Perforation Treatment Performed - Packing Dev CPD W/Res-GYP Cem |
2013-01-27 | Plug Back Performed |
2013-01-27 | Well Fluid changed to Crude Oil |
2013-01-27 | Well Log Performed |
2013-01-27 | Well Mode changed to Abandoned Zone |
2013-01-28 | Perforation Treatment Performed - Jet Perforation |
2013-01-28 | Well Log Performed |
2013-01-31 | Perforation Treatment Performed - Acid Squeeze - Press Used |
2013-02-01 | Perforation Treatment Performed - Acid Squeeze - Press Used |
2013-02-02 | Perforation Treatment Performed - Acid Squeeze - Press Used |
2013-02-06 | Well Log Performed |
For data sources see[3]
Start Date | Depth (m) | Reason |
---|---|---|
1996-03-22 | 1270.00 | Deviate (5 - 79 degrees) |
For data sources see[4]
Perforation Date | Perforation Type | Interval Top (m) | Interval Base (m) | Number of Shots |
---|---|---|---|---|
1996-04-17 | Perforation | 1893.00 | 1898.00 | 13 |
1996-04-26 | Perforation | 1893.00 | 1896.00 | 13 |
1996-04-26 | Perforation | 1903.00 | 1905.00 | 13 |
1996-04-26 | Perforation | 1906.50 | 1908.00 | 13 |
1996-04-26 | Perforation | 1915.50 | 1919.50 | 13 |
1996-04-26 | Perforation | 1926.00 | 1929.00 | 13 |
1996-04-27 | Acid Treatment | 1903.00 | 1929.00 | 0 |
1996-04-29 | Perforation | 1881.00 | 1882.00 | 13 |
1996-04-30 | Acid Treatment | 1881.00 | 1882.00 | 0 |
1996-05-02 | Cement Squeeze | 1881.00 | 1896.00 | 0 |
1996-05-06 | Perforation | 1893.00 | 1896.00 | 13 |
1996-04-17 | Perforation | 1903.00 | 1905.00 | 13 |
1996-05-07 | Acid Treatment | 1893.00 | 1896.00 | 0 |
1996-05-09 | Perforation | 1884.00 | 1885.00 | 13 |
1996-05-20 | Acid Treatment | 1884.00 | 1885.00 | 0 |
2013-01-26 | Perforation | 1874.00 | 1875.00 | 13 |
2013-01-26 | Perforation | 1853.70 | 1863.50 | 13 |
2013-01-27 | Packing Dev Cpd w/Res-Gyp Cem | 1869.00 | 1872.00 | 0 |
2013-01-28 | Perforation | 1839.80 | 1848.50 | 13 |
2013-01-28 | Perforation | 1828.00 | 1836.30 | 13 |
2013-01-31 | Acid Treatment | 1853.70 | 1863.50 | 0 |
2013-02-01 | Acid Treatment | 1839.80 | 1848.50 | 0 |
1996-04-17 | Perforation | 1906.50 | 1909.00 | 13 |
2013-02-02 | Acid Treatment | 1828.00 | 1836.30 | 0 |
1996-04-17 | Perforation | 1915.50 | 1919.50 | 13 |
1996-04-17 | Perforation | 1926.00 | 1929.00 | 13 |
1996-04-18 | Acid Treatment | 1915.50 | 1929.00 | 0 |
1996-04-19 | Acid Treatment | 1903.00 | 1915.50 | 0 |
1996-04-20 | Acid Treatment | 1893.00 | 1898.00 | 0 |
1996-04-22 | Cement Squeeze | 1893.00 | 1929.00 | 0 |
For data sources see[5]
Period | Total Production Hours | Gas Quantity (m3) | Oil Quantity (m3) | Water Quantity (m3) |
---|---|---|---|---|
1996 | 5212 | 0.0 | 0.0 | 0.0 |
1997 | 8562 | 0.0 | 0.0 | 0.0 |
1998 | 4792 | 0.0 | 0.0 | 0.0 |
1999 | 1778 | 0.0 | 0.0 | 0.0 |
2000 | 5941 | 0.0 | 0.0 | 0.0 |
2001 | 5081 | 0.0 | 0.0 | 0.0 |
2002 | 8535 | 0.0 | 0.0 | 0.0 |
2003 | 8681 | 0.0 | 0.0 | 0.0 |
2004 | 7776 | 0.0 | 0.0 | 0.0 |
2005 | 5559 | 0.0 | 0.0 | 0.0 |
2006 | 6703 | 0.0 | 0.0 | 0.0 |
2007 | 8073 | 0.0 | 0.0 | 0.0 |
2008 | 6445 | 0.0 | 0.0 | 0.0 |
2009 | 1628 | 0.0 | 0.0 | 0.0 |
2010 | 8475 | 0.0 | 0.0 | 0.0 |
2011 | 3420 | 0.0 | 0.0 | 0.0 |
2012 | 3126 | 0.0 | 0.0 | 0.0 |
2013 | 514 | 0.0 | 0.0 | 0.0 |
For data sources see[6]
Occurence Date | Occurence Type | Occurence Depth (m) | Occurence Control Depth (m) |
---|---|---|---|
1996-03-31 | Lost Circulation | 1872.00 | 2042.00 |
1996-04-03 | Kick | 2042.00 | 2042.00 |
2013-02-09 | No Incident Encountered | 0.00 | 0.00 |
For data sources see[7]