X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

1086100113022

Well Details

Well ID: 1086100113022
Loading map...
Location: 02/13-01-108-10W6/2
Location Alias: 02/13-01-08-10 W6M
Location Alias 2: 02/13-01-108-10 W6/02
Country: Canada
Province: Alberta
Township: 108
Meridian: 6
Range: 10
Section: 01
County/Municipality: Mackenzie County
Well Name: HUSKY MOBIL RAINS A13-1-108-10
Operator Name: Husky Oil Operations Limited
License Number: 0081899
License Date: 1980-03-28
License Status: Issued
Spud Date: 1980-01-17
Final Drill Date: 1980-02-17
Well Total Depth: 2021.00 m
Surface Hole Latitude: 58.351412
Surface Hole Longitude: -119.531560

For data sources see[1][2]

Well History

Date Event
1909-09-09 Well Log Performed
1980-02-17 Finished Drilling
1980-02-17 Well Mode changed to Drilled and Cased
1980-02-22 Liner Casing Operation Performed
1980-03-04 Perforation Treatment Performed - Jet Perforation
1980-03-05 Perforation Treatment Performed - Acid Squeeze - Press Used
1980-03-28 Obtained License
1986-03-25 Perforation Treatment Performed - Jet Perforation
1986-03-26 Perforation Treatment Performed - Acid Squeeze - Press Used
1986-04-03 Perforation Treatment Performed - Jet Perforation
1986-04-12 Perforation Treatment Performed - Jet Perforation
1986-12-21 Perforation Treatment Performed - Acid Squeeze - Press Used
1989-08-23 Perforation Treatment Performed - Bridge Plug Capped W/Cement
1989-09-23 Perforation Treatment Performed - Jet Perforation
1989-09-24 Perforation Treatment Performed - Jet Perforation
1989-09-27 Perforation Treatment Performed - Acid Squeeze - Press Used
1989-09-28 Perforation Treatment Performed - Acid Squeeze - Press Used
1989-09-29 Perforation Treatment Performed - Acid Squeeze - Press Used
1989-10-01 Perforation Treatment Performed - Acid Squeeze - Press Used
1989-10-08 Well Began Production
1989-10-08 Well Fluid changed to Crude Oil
1989-10-08 Well Mode changed to Pumping
1996-08-04 Perforation Treatment Performed - Acid Squeeze - Press Used
1996-08-23 Well Log Performed
1996-08-25 Well Log Performed
1997-02-06 Well Fluid changed to Crude Oil
1997-02-06 Well Mode changed to Suspended
1997-02-07 Perforation Treatment Performed - Cement Squeeze
1997-02-08 Well Log Performed
1997-03-19 Well Log Performed
1997-03-21 Perforation Treatment Performed - Cement Squeeze
1997-03-25 Perforation Treatment Performed - Jet Perforation
1997-03-26 Perforation Treatment Performed - Jet Perforation
1997-03-28 Well Log Performed
1997-03-31 Well Log Performed
1997-04-01 Perforation Treatment Performed - Cement Squeeze
1997-04-04 Well Log Performed
1997-04-05 Perforation Treatment Performed - Jet Perforation
1997-04-06 Perforation Treatment Performed - Acid Squeeze - Press Used
1997-04-09 Well Log Performed
1997-04-10 Perforation Treatment Performed - Jet Perforation
1997-04-11 Perforation Treatment Performed - Acid Squeeze - Press Used
1997-04-11 Well Log Performed
1997-06-03 Well Fluid changed to Crude Oil
1997-06-03 Well Mode changed to Suspended
1997-06-04 Well Fluid changed to Crude Oil
1997-06-04 Well Mode changed to Abandoned Zone
1997-08-17 Perforation Treatment Performed - Chemical Squeeze

For data sources see[3]


Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
1980-03-04 Perforation 1913.00 1918.50 7
1986-12-21 Acid Treatment 1865.00 1879.00 0
1989-08-23 Packing Device Capped w/Cement 1862.30 1863.00 0
1989-09-23 Perforation 1813.50 1815.50 13
1989-09-23 Perforation 1818.50 1824.00 13
1989-09-23 Perforation 1831.50 1836.00 20
1989-09-24 Perforation 1806.50 1808.50 13
1989-09-24 Perforation 1811.00 1812.50 13
1989-09-24 Perforation 1825.50 1827.00 13
1989-09-24 Perforation 1838.50 1841.50 20
1989-09-24 Perforation 1849.00 1850.50 20
1980-03-05 Acid Treatment 1913.00 1918.50 0
1989-09-24 Perforation 1853.50 1856.50 20
1989-09-27 Acid Treatment 1853.50 1856.50 0
1989-09-28 Acid Treatment 1849.00 1850.50 0
1989-09-29 Acid Treatment 1849.00 1850.50 0
1989-10-01 Acid Treatment 1806.50 1815.50 0
1996-08-04 Acid Treatment 1806.50 1856.50 0
1997-02-07 Cement Squeeze 1806.50 1827.00 0
1997-03-21 Cement Squeeze 1831.50 1856.50 0
1997-03-25 Perforation 1865.00 1867.00 13
1997-03-25 Perforation 1869.00 1879.00 13
1986-03-25 Perforation 1913.00 1918.50 13
1997-03-26 Perforation 1890.00 1895.00 13
1997-03-26 Perforation 1901.00 1904.00 13
1997-03-26 Perforation 1904.00 1910.00 13
1997-03-26 Perforation 1913.00 1918.50 13
1997-04-01 Cement Squeeze 1865.00 1910.00 0
1997-04-05 Perforation 1876.00 1878.00 13
1997-04-05 Perforation 1888.00 1891.00 13
1997-04-05 Perforation 1895.00 1897.00 13
1997-04-05 Perforation 1903.00 1905.00 13
1997-04-05 Perforation 1912.00 1914.00 13
1986-03-26 Acid Treatment 1913.00 1918.50 0
1997-04-06 Acid Treatment 1876.00 1914.00 0
1997-04-10 Perforation 1865.00 1867.00 13
1997-04-11 Acid Treatment 1865.00 1914.00 0
1997-08-17 Chemical Squeeze 1865.00 1914.00 0
1986-04-03 Perforation 1904.00 1910.00 13
1986-04-03 Perforation 1901.00 1904.00 13
1986-04-03 Perforation 1890.00 1895.00 13
1986-04-12 Perforation 1869.00 1879.00 13
1986-04-12 Perforation 1865.00 1867.00 13

For data sources see[4]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
1989 1794 0.0 0.0 0.0
1990 5808 0.0 0.0 0.0
1991 7180 0.0 0.0 0.0
1992 8497 0.0 0.0 0.0
1993 7950 0.0 0.0 0.0
1994 6879 0.0 0.0 0.0
1995 7956 0.0 0.0 0.0
1996 4742 0.0 0.0 0.0

For data sources see[5]

References