X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

1086092815000

Well Details

Well ID: 1086092815000
Loading map...
Location: 00/15-28-108-09W6/0
Location Alias: 00/15-28-08-09 W6M
Location Alias 2: 00/15-28-108-09 W6/00
Country: Canada
Province: Alberta
Township: 108
Meridian: 6
Range: 09
Section: 28
County/Municipality: Mackenzie County
Well Name: HUSKY TEHZE 15-28-108-9
Operator Name: Husky Oil Operations Limited
License Number: 0109100
License Date: 1984-09-04
License Status: Suspension
Spud Date: 1984-09-16
Final Drill Date: 1984-10-07
Well Total Depth: 1922.00 m
Surface Hole Latitude: 58.409905
Surface Hole Longitude: -119.432896

For data sources see[1][2]

Well History

Date Event
1984-09-04 Obtained License
1984-09-17 Surface Casing Operation Performed
1984-09-26 Drill Stem Test Performed
1984-09-30 Kick Occurred
1984-10-07 Finished Drilling
1984-10-07 Well Log Performed
1984-10-07 Well Mode changed to Drilled and Cased
1984-10-09 Well Log Performed
1984-10-11 Drill Stem Test Performed
1984-10-13 Drill Stem Test Performed
1984-10-14 Production Casing Operation Performed
1984-10-15 Rig Released
1984-12-17 Perforation Treatment Performed - Jet Perforation
1984-12-18 Perforation Treatment Performed - Acid Squeeze - Press Used
1984-12-19 Perforation Treatment Performed - Fractured
1985-01-09 Well Began Production
1985-01-09 Well Fluid changed to Crude Oil
1985-01-09 Well Mode changed to Pumping
2000-11-11 Well Log Performed
2000-11-12 Perforation Treatment Performed - Jet Perforation
2000-11-12 Well Log Performed
2000-11-14 Perforation Treatment Performed - Acid Squeeze - Press Used
2000-11-15 Perforation Treatment Performed - Acid Squeeze - Press Used
2000-11-16 Perforation Treatment Performed - Acid Squeeze - Press Used
2000-11-18 Perforation Treatment Performed - Acid Squeeze - Press Used
2000-11-19 Perforation Treatment Performed - Acid Squeeze - Press Used
2000-11-20 Perforation Treatment Performed - Acid Squeeze - Press Used
2000-11-21 Perforation Treatment Performed - Acid Squeeze - Press Used
2000-11-22 Perforation Treatment Performed - Acid Squeeze - Press Used
2000-11-23 Perforation Treatment Performed - Acid Squeeze - Press Used
2000-11-24 Perforation Treatment Performed - Acid Squeeze - Press Used
2000-11-25 Perforation Treatment Performed - Acid Squeeze - Press Used
2010-07-23 Well Log Performed
2011-08-01 Perforation Treatment Performed - Chemical Squeeze
2011-08-04 Perforation Treatment Performed - Acid Squeeze - Press Used
2011-08-04 Well Log Performed
2018-06-20 Perforation Treatment Performed - Jet Perforation
2018-06-21 Perforation Treatment Performed - Acid Squeeze - Press Used
2018-06-21 Perforation Treatment Performed - Jet Perforation
2018-06-22 Perforation Treatment Performed - Acid Squeeze - Press Used
2018-06-24 Perforation Treatment Performed - Acid Squeeze - Press Used
2018-06-26 Perforation Treatment Performed - Acid Squeeze - Press Used
2018-06-27 Perforation Treatment Performed - Acid Squeeze - Press Used
2018-06-28 Perforation Treatment Performed - Acid Squeeze - Press Used
2018-07-02 Perforation Treatment Performed - Acid Squeeze - Press Used
2019-07-19 Well Fluid changed to Crude Oil
2019-07-19 Well Mode changed to Suspended

For data sources see[3]


Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
1984-12-17 Perforation 1890.30 1891.30 13
1984-12-18 Acid Treatment 1810.60 1891.30 0
1984-12-19 Fracture 1810.60 1891.30 0
2000-11-12 Perforation 1904.50 1905.50 13
2000-11-12 Perforation 1853.00 1858.00 13
2000-11-12 Perforation 1851.00 1852.00 13
2000-11-12 Perforation 1836.00 1837.50 13
2000-11-12 Perforation 1825.00 1827.50 13
2000-11-12 Perforation 1802.00 1803.00 13
2000-11-12 Perforation 1796.00 1797.50 13
2000-11-12 Perforation 1784.50 1786.50 13
1984-12-17 Perforation 1887.70 1887.70 13
2000-11-14 Acid Treatment 1904.50 1905.50 0
2000-11-15 Acid Treatment 1904.50 1905.50 0
2000-11-16 Acid Treatment 1881.90 1891.30 0
2000-11-16 Acid Treatment 1851.00 1858.00 0
2000-11-18 Acid Treatment 1851.00 1858.00 0
2000-11-19 Acid Treatment 1844.10 1845.10 0
2000-11-20 Acid Treatment 1836.00 1837.50 0
2000-11-21 Acid Treatment 1851.00 1905.50 0
2000-11-22 Acid Treatment 1810.60 1812.60 0
2000-11-23 Acid Treatment 1802.00 1812.60 0
1984-12-17 Perforation 1885.60 1886.60 13
2000-11-24 Acid Treatment 1796.00 1797.50 0
2000-11-25 Acid Treatment 1825.00 1837.50 0
2000-11-25 Acid Treatment 1851.00 1858.00 0
2011-08-01 Chemical Squeeze 1784.50 1905.50 0
2011-08-04 Acid Treatment 1784.50 1905.50 0
2018-06-20 Perforation 1904.50 1905.50 21
2018-06-20 Perforation 1890.30 1891.30 21
2018-06-20 Perforation 1887.70 1888.90 21
2018-06-20 Perforation 1885.60 1886.60 21
2018-06-20 Perforation 1881.00 1883.00 21
1984-12-17 Perforation 1881.90 1882.90 13
2018-06-20 Perforation 1853.00 1858.00 21
2018-06-20 Perforation 1851.00 1852.00 21
2018-06-20 Perforation 1844.10 1845.10 21
2018-06-20 Perforation 1836.00 1837.50 21
2018-06-20 Perforation 1825.00 1827.50 21
2018-06-21 Perforation 1822.00 1824.00 21
2018-06-21 Perforation 1810.60 1812.60 21
2018-06-21 Perforation 1801.00 1803.00 21
2018-06-21 Acid Treatment 1904.50 1905.50 0
2018-06-21 Acid Treatment 1890.30 1891.30 0
1984-12-17 Perforation 1844.10 1845.10 13
2018-06-21 Acid Treatment 1887.80 1888.90 0
2018-06-21 Acid Treatment 1885.60 1886.60 0
2018-06-21 Acid Treatment 1881.00 1883.00 0
2018-06-21 Acid Treatment 1854.00 1857.00 0
2018-06-21 Acid Treatment 1851.00 1852.00 0
2018-06-22 Acid Treatment 1844.10 1845.10 0
2018-06-22 Acid Treatment 1836.00 1837.50 0
2018-06-22 Acid Treatment 1825.00 1827.50 0
2018-06-22 Acid Treatment 1822.00 1824.00 0
2018-06-22 Acid Treatment 1810.60 1812.60 0
1984-12-17 Perforation 1810.60 1812.60 13
2018-06-22 Acid Treatment 1801.00 1803.00 0
2018-06-24 Acid Treatment 1890.30 1891.30 0
2018-06-24 Acid Treatment 1887.70 1888.90 0
2018-06-24 Acid Treatment 1885.60 1886.60 0
2018-06-24 Acid Treatment 1881.00 1883.00 0
2018-06-26 Acid Treatment 1822.00 1824.00 0
2018-06-26 Acid Treatment 1825.00 1827.50 0
2018-06-26 Acid Treatment 1836.00 1837.50 0
2018-06-26 Acid Treatment 1844.10 1845.10 0
2018-06-27 Acid Treatment 1822.00 1824.00 0
1984-12-17 Perforation 1844.10 1845.10 13
2018-06-27 Acid Treatment 1825.00 1827.50 0
2018-06-27 Acid Treatment 1836.00 1837.50 0
2018-06-27 Acid Treatment 1844.10 1845.10 0
2018-06-28 Acid Treatment 1801.00 1803.00 0
2018-06-28 Acid Treatment 1810.60 1812.60 0
2018-07-02 Acid Treatment 1904.50 1905.50 0
1984-12-18 Acid Treatment 1844.10 1845.10 0
1984-12-18 Acid Treatment 1810.60 1812.60 0

For data sources see[4]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
1985 8147 0.0 0.0 0.0
1986 8402 0.0 0.0 0.0
1987 7984 0.0 0.0 0.0
1988 8328 0.0 0.0 0.0
1989 8261 0.0 0.0 0.0
1990 7941 0.0 0.0 0.0
1991 7908 0.0 0.0 0.0
1992 8670 0.0 0.0 0.0
1993 7366 0.0 0.0 0.0
1994 6810 0.0 0.0 0.0
1995 7680 0.0 0.0 0.0
1996 8405 0.0 0.0 0.0
1997 8157 0.0 0.0 0.0
1998 3023 0.0 0.0 0.0
1999 5965 0.0 0.0 0.0
2000 3300 0.0 0.0 0.0
2001 7365 0.0 0.0 0.0
2002 8247 0.0 0.0 0.0
2003 5918 0.0 0.0 0.0
2004 7822 0.0 0.0 0.0
2005 8585 0.0 0.0 0.0
2006 7648 0.0 0.0 0.0
2007 8331 0.0 0.0 0.0
2008 8724 0.0 0.0 0.0
2009 8183 0.0 0.0 0.0
2010 4172 0.0 0.0 0.0
2011 3423 0.0 0.0 0.0
2012 8113 0.0 0.0 0.0
2013 8168 0.0 0.0 0.0
2014 6814 0.0 0.0 0.0
2015 8142 0.0 0.0 0.0
2016 8679 0.0 0.0 0.0
2017 8208 0.0 0.0 0.0
2018 7719 0.0 0.0 0.0
2019 3647 0.0 0.0 0.0

For data sources see[5]

Occurences

Occurence Date Occurence Type Occurence Depth (m) Occurence Control Depth (m)
1984-09-30 Kick 1690.00 1690.00
2018-07-04 No Incident Encountered 0.00 0.00

For data sources see[6]

References