If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.
powered by ChangeDetection
Well ID: 1086092702020 | Loading map...
{"type":"SATELLITE","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"100%","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"wmsoverlay":false,"copycoords":false,"static":false,"zoom":14,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"markercluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","enablefullscreen":false,"scrollwheelzoom":false,"locations":[{"text":"","title":"","link":"","lat":58.399883,"lon":-119.40467,"icon":""}]} |
Location: 02/02-27-108-09W6/0 | |
Location Alias: 02/02-27-08-09 W6M | |
Location Alias 2: 02/02-27-108-09 W6/00 | |
Country: Canada | |
Province: Alberta | |
Township: 108 | |
Meridian: 6 | |
Range: 09 | |
Section: 27 | |
County/Municipality: Mackenzie County | |
Well Name: HUSKY MOBIL RAINBOW 2-27MU-108-9 | |
Operator Name: Husky Oil Operations Limited | |
License Number: 0031674 | |
License Date: 1967-01-31 | |
License Status: Suspension | |
Spud Date: 1967-01-31 | |
Final Drill Date: 1967-02-12 | |
Well Total Depth: 1809.00 m | |
Surface Hole Latitude: 58.399883 | |
Surface Hole Longitude: -119.404670 |
Date | Event |
---|---|
1909-09-09 | Well Log Performed |
1967-01-31 | Obtained License |
1967-02-12 | Finished Drilling |
1967-02-12 | Well Mode changed to Drilled and Cased |
1967-02-14 | Production Casing Operation Performed |
1967-02-18 | Perforation Treatment Performed - Acid Squeeze - Press Used |
1967-02-18 | Perforation Treatment Performed - Jet Perforation |
1967-02-22 | Well Began Production |
1967-02-22 | Well Fluid changed to Crude Oil |
1967-02-22 | Well Mode changed to Flowing |
1967-04-16 | Perforation Treatment Performed - Jet Perforation |
1967-04-18 | Well Fluid changed to Crude Oil |
1967-04-18 | Well Mode changed to Flowing |
1967-05-23 | Perforation Treatment Performed - Cement Squeeze |
1967-05-26 | Perforation Treatment Performed - Jet Perforation |
1977-04-10 | Well Fluid changed to Crude Oil |
1977-04-10 | Well Mode changed to Pumping |
1987-08-31 | Perforation Treatment Performed - Acid Squeeze - Press Used |
1987-09-12 | Perforation Treatment Performed - Jet Perforation |
1987-09-16 | Perforation Treatment Performed - Acid Squeeze - Press Used |
1987-09-21 | Perforation Treatment Performed - Acid Squeeze - Press Used |
1987-09-24 | Perforation Treatment Performed - Acid Squeeze - Press Used |
1987-09-25 | Perforation Treatment Performed - Cement Squeeze |
1987-09-25 | Plug Back Performed |
1987-09-25 | Well Fluid changed to Crude Oil |
1987-09-25 | Well Mode changed to Pumping |
1993-09-12 | Perforation Treatment Performed - Bridge Plug Capped W/Cement |
1993-09-12 | Plug Back Performed |
1993-09-12 | Well Fluid changed to Crude Oil |
1993-09-12 | Well Log Performed |
1993-09-12 | Well Mode changed to Abandoned Zone |
1993-09-13 | Perforation Treatment Performed - Jet Perforation |
1993-09-14 | Perforation Treatment Performed - Chemical Squeeze |
1993-09-14 | Well Log Performed |
1993-09-15 | Perforation Treatment Performed - Acid Squeeze - Press Used |
1996-02-20 | Well Log Performed |
1996-03-03 | Well Log Performed |
1996-07-13 | Perforation Treatment Performed - Jet Perforation |
1996-07-13 | Well Log Performed |
1996-07-14 | Well Log Performed |
1996-07-17 | Perforation Treatment Performed - Acid Squeeze - Press Used |
1996-07-18 | Perforation Treatment Performed - Remedial Casing |
1996-07-22 | Perforation Treatment Performed - Acid Squeeze - Press Used |
1996-07-22 | Perforation Treatment Performed - Jet Perforation |
1996-07-22 | Well Log Performed |
1996-07-23 | Perforation Treatment Performed - Cement Plug |
1996-07-23 | Perforation Treatment Performed - Remedial Casing |
1996-08-27 | Perforation Treatment Performed - Jet Perforation |
2006-02-07 | Well Log Performed |
2006-03-23 | Perforation Treatment Performed - Jet Perforation |
2006-03-23 | Perforation Treatment Performed - Remedial Casing |
For data sources see[3]
Perforation Date | Perforation Type | Interval Top (m) | Interval Base (m) | Number of Shots |
---|---|---|---|---|
1967-02-18 | Perforation | 1756.90 | 1759.00 | 7 |
1967-05-23 | Cement Squeeze | 1756.90 | 1759.00 | 0 |
1967-05-26 | Perforation | 1738.60 | 1742.80 | 7 |
1987-08-31 | Acid Treatment | 1738.60 | 1742.80 | 0 |
1987-09-12 | Perforation | 1760.50 | 1762.40 | 13 |
1987-09-12 | Perforation | 1772.10 | 1774.50 | 13 |
1987-09-16 | Acid Treatment | 1772.10 | 1774.50 | 0 |
1987-09-21 | Acid Treatment | 1760.50 | 1762.40 | 0 |
1987-09-24 | Acid Treatment | 1738.60 | 1742.80 | 0 |
1987-09-24 | Acid Treatment | 1745.60 | 1750.10 | 0 |
1987-09-25 | Cement Squeeze | 1738.60 | 1750.10 | 0 |
1967-02-18 | Perforation | 1765.10 | 1766.30 | 7 |
1993-09-12 | Packing Device Capped w/Cement | 1752.00 | 1760.00 | 0 |
1993-09-13 | Perforation | 1725.00 | 1727.00 | 13 |
1993-09-13 | Perforation | 1732.00 | 1734.00 | 13 |
1993-09-13 | Perforation | 1737.00 | 1740.00 | 13 |
1993-09-13 | Perforation | 1743.00 | 1746.00 | 13 |
1993-09-14 | Chemical Squeeze | 1725.00 | 1746.00 | 0 |
1993-09-15 | Acid Treatment | 1725.00 | 1746.00 | 0 |
1996-07-13 | Perforation | 498.00 | 498.30 | 13 |
1996-07-13 | Perforation | 397.00 | 397.30 | 13 |
1996-07-17 | Acid Treatment | 397.00 | 498.30 | 0 |
1967-02-18 | Perforation | 1767.80 | 1769.40 | 7 |
1996-07-18 | Remedial Casing Cementing | 397.00 | 498.30 | 0 |
1996-07-22 | Perforation | 396.30 | 397.30 | 13 |
1996-07-22 | Acid Treatment | 396.30 | 397.30 | 0 |
1996-07-23 | Remedial Casing Cementing | 396.30 | 397.30 | 0 |
1996-07-23 | Cement Plug | 353.00 | 400.50 | 0 |
1996-08-27 | Perforation | 1725.00 | 1727.00 | 13 |
1996-08-27 | Perforation | 1732.00 | 1734.00 | 13 |
1996-08-27 | Perforation | 1737.00 | 1740.00 | 13 |
1996-08-27 | Perforation | 1743.00 | 1746.00 | 13 |
2006-03-23 | Perforation | 498.00 | 504.00 | 13 |
1967-02-18 | Perforation | 1779.10 | 1782.20 | 7 |
2006-03-23 | Remedial Casing Cementing | 498.00 | 504.00 | 0 |
1967-02-18 | Perforation | 1784.30 | 1786.40 | 7 |
1967-02-18 | Perforation | 1791.60 | 1794.70 | 7 |
1967-02-18 | Acid Treatment | 1756.90 | 1794.70 | 0 |
1967-04-16 | Perforation | 1745.60 | 1750.20 | 7 |
1967-05-23 | Cement Squeeze | 1745.60 | 1750.20 | 0 |
For data sources see[4]
Period | Total Production Hours | Gas Quantity (m3) | Oil Quantity (m3) | Water Quantity (m3) |
---|---|---|---|---|
1967 | 0 | 0.0 | 0.0 | 0.0 |
1968 | 1059 | 0.0 | 0.0 | 0.0 |
1969 | 2486 | 0.0 | 0.0 | 0.0 |
1970 | 3236 | 0.0 | 0.0 | 0.0 |
1971 | 5148 | 0.0 | 0.0 | 0.0 |
1972 | 6719 | 0.0 | 0.0 | 0.0 |
1973 | 6564 | 0.0 | 0.0 | 0.0 |
1974 | 6408 | 0.0 | 0.0 | 0.0 |
1975 | 6283 | 0.0 | 0.0 | 0.0 |
1976 | 5650 | 0.0 | 0.0 | 0.0 |
1977 | 4065 | 0.0 | 0.0 | 0.0 |
1978 | 5509 | 0.0 | 0.0 | 0.0 |
1979 | 8271 | 0.0 | 0.0 | 0.0 |
1980 | 8323 | 0.0 | 0.0 | 0.0 |
1981 | 7163 | 0.0 | 0.0 | 0.0 |
1982 | 8405 | 0.0 | 0.0 | 0.0 |
1983 | 8569 | 0.0 | 0.0 | 0.0 |
1984 | 8035 | 0.0 | 0.0 | 0.0 |
1985 | 8337 | 0.0 | 0.0 | 0.0 |
1986 | 6856 | 0.0 | 0.0 | 0.0 |
1987 | 4851 | 0.0 | 0.0 | 0.0 |
1988 | 8002 | 0.0 | 0.0 | 0.0 |
1989 | 7042 | 0.0 | 0.0 | 0.0 |
1990 | 8149 | 0.0 | 0.0 | 0.0 |
1991 | 5116 | 0.0 | 0.0 | 0.0 |
For data sources see[5]