X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

1086091410000

Well Details

Well ID: 1086091410000
Loading map...
Location: 00/10-14-108-09W6/0
Location Alias: 00/10-14-08-09 W6M
Location Alias 2: 00/10-14-108-09 W6/00
Country: Canada
Province: Alberta
Township: 108
Meridian: 6
Range: 09
Section: 14
County/Municipality: Mackenzie County
Well Name: HUSKY HZ RAINBOWS 10-14-108-9
Operator Name: Husky Oil Operations Limited
License Number: 0490343
License Date: 2018-08-03
License Status: Issued
Spud Date: 2018-08-16
Final Drill Date: 2018-08-30
Well Total Depth: 4065.00 m
Surface Hole Latitude: 58.376084
Surface Hole Longitude: -119.333043

For data sources see[1][2]

Well History

Date Event
2018-08-03 Obtained License
2018-08-18 Surface Casing Operation Performed
2018-08-20 Direction Drilling Operation Performed - Deviate
2018-08-22 Direction Drilling Operation Performed - Horizontal
2018-08-23 Intermediate Casing Operation Performed
2018-08-30 Finished Drilling
2018-08-30 Well Log Performed
2018-08-30 Well Mode changed to Drilled and Cased
2018-08-31 Liner Casing Operation Performed
2018-08-31 Perforation Treatment Performed - Open-Hole Completion
2018-09-02 Rig Released
2018-11-09 Perforation Treatment Performed - Multi-Stage Fracture
2018-11-10 Perforation Treatment Performed - Multi-Stage Fracture
2018-12-04 Perforation Treatment Performed - Multi-Stage Fracture
2019-02-05 Well Began Production
2019-02-05 Well Fluid changed to Crude Oil
2019-02-05 Well Mode changed to Pumping

For data sources see[3]

Spud Table

Spud Date Contractor Rig Number New Projected Depth (m) Activity Type
2018-08-16 Akita Drilling Ltd. 31 N/A Drill To LD

For data sources see[4]

Directional Drilling

Start Date Depth (m) Reason
2018-08-20 1386.40 Deviate (5 - 79 degrees)
2018-08-22 2019.60 Horizontal

For data sources see[5]

Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
2018-08-31 Open Hole/Barefoot Completion 4055.00 4065.00 0
2018-11-09 Multi-Stage Fracture 3462.90 3463.00 0
2018-11-09 Multi-Stage Fracture 3401.10 3401.20 0
2018-11-09 Multi-Stage Fracture 3339.50 3339.60 0
2018-11-09 Multi-Stage Fracture 3264.70 3264.80 0
2018-11-10 Multi-Stage Fracture 3203.00 3203.10 0
2018-11-10 Multi-Stage Fracture 3141.20 3141.30 0
2018-11-10 Multi-Stage Fracture 3079.50 3079.60 0
2018-11-10 Multi-Stage Fracture 3018.60 3018.70 0
2018-11-10 Multi-Stage Fracture 2957.40 2957.50 0
2018-11-10 Multi-Stage Fracture 2895.80 2895.90 0
2018-11-09 Multi-Stage Fracture 3968.40 3968.50 0
2018-11-10 Multi-Stage Fracture 2834.20 2834.30 0
2018-12-04 Multi-Stage Fracture 2772.40 2772.50 0
2018-12-04 Multi-Stage Fracture 2696.60 2696.70 0
2018-12-04 Multi-Stage Fracture 2382.90 2383.00 0
2018-12-04 Multi-Stage Fracture 2321.10 2321.20 0
2018-12-04 Multi-Stage Fracture 2259.60 2259.70 0
2018-12-04 Multi-Stage Fracture 2197.80 2197.90 0
2018-11-09 Multi-Stage Fracture 3894.00 3894.10 0
2018-11-09 Multi-Stage Fracture 3832.20 3832.30 0
2018-11-09 Multi-Stage Fracture 3770.70 3770.80 0
2018-11-09 Multi-Stage Fracture 3709.10 3709.20 0
2018-11-09 Multi-Stage Fracture 3647.30 3647.40 0
2018-11-09 Multi-Stage Fracture 3585.70 3585.80 0
2018-11-09 Multi-Stage Fracture 3524.60 3524.70 0

For data sources see[6]

Fracking Activities

Fracking Jobs

Job Number Job Start Date Job End Date True Vertical Depth (ft) Total Water Volume (gal) Total Non-Water Volume (gal)
1 2018-11-09 2018-12-04 1,825 2,036 N/A

Fluid Composition Data

Job Number Trade Name Supplier Purpose Ingredient Name CAS Number Additive Percentage by Mass Job Percentage by Mass Mass Used (lb)
1 Water 7732-18-5 100 93.4526 N/A
20/40 Import Sand Step Energy Services Crystalline Silica 14808-60-7 100 5.8109 N/A
Secure BIO-10B (Biocide) Step Energy Services Bactericide/Biocide 2-bromo-2-nitro.3-diol 52-51-7 100 0.0142 N/A
Methyl Alcohol 67-56-1 100 0.0142 N/A
Non-Hazardous Ingredients Not Available 100 0.0142 N/A
SCBO-2 (Breaker) Step Energy Services Breaker Ammonium Persulfate 7727-54-0 100 0.0184 N/A
Cured Acrylic Resin Not Available 100 0.0184 N/A
Non-Hazardous Ingredients Not Available 100 0.0184 N/A
SCS-1 (Clay Control) Step Energy Services Clay Control Choline chloride 67-48-1 100 0.1376 N/A
Non-Hazardous Ingredients Not Available 100 0.1376 N/A
SBX-7 (Crosslinker) Step Energy Services Crosslinker Non-Hazardous Ingredients Not Available 100 0.1899 N/A
Petroleum Distillates. hydrotreated light 64742-47-8 100 0.1899 N/A
SFR-106 (Friction Reducer) Step Energy Services Friction Reducer Ethoxylated Alcohol 78330-21-9 100 0.089 N/A
Non-Hazardous Ingredients Not Available 100 0.089 N/A
Petroleum distillates. hydrotreated light 64742-47-8 100 0.089 N/A
SWG-101 (Gellant) Step Energy Services Gelling Agent Guar gum 9000-30-0 100 0.2008 N/A
SNE-2 (Non-Emulsifier) Step Energy Services Surfactant 2-Ethylhexanol distillation residue 68609-68-7 100 0.0862 N/A
Dodecylbenzene Sulfonic Acid 27176-87-0 100 0.0862 N/A
Methanol 67-56-1 100 0.0862 N/A
Monoethanolamine 141-43-5 100 0.0862 N/A
Oxirane. methyl-. polymer 11/6/9003 100 0.0862 N/A
Poly(oxy-1.2-ethanediyl). alphaisotridecyl-omega-hydroxy- 9043-30-5 100 0.0862 N/A
Water 7732-18-5 100 0.0862 N/A

For data sources see[7]

Water Sources

Water Diversion Start Date Water Diversion End Date Water Source Type Total Water Volume (m3)
2018-11-09 2018-11-10 Surface Water - Runoff 1617
2018-12-04 2018-12-04 Surface Water - Runoff 461

For data sources see[8]

Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
2019 6714 0.0 0.0 0.0
2020 2183 0.0 0.0 0.0

For data sources see[9]

Occurences

Occurence Date Occurence Type Occurence Depth (m) Occurence Control Depth (m)
2018-09-02 No Incident Encountered 0.00 0.00
2018-12-02 No Incident Encountered 0.00 0.00
2019-01-12 No Incident Encountered 0.00 0.00

For data sources see[10]

References