If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.
powered by ChangeDetection
Well ID: 1086082813000 | Loading map...
{"type":"SATELLITE","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"100%","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"wmsoverlay":false,"copycoords":false,"static":false,"zoom":14,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"markercluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","enablefullscreen":false,"scrollwheelzoom":false,"locations":[{"text":"","title":"","link":"","lat":58.410816,"lon":-119.281052,"icon":""}]} |
Location: 00/13-28-108-08W6/0 | |
Location Alias: 00/13-28-08-08 W6M | |
Location Alias 2: 00/13-28-108-08 W6/00 | |
Country: Canada | |
Province: Alberta | |
Township: 108 | |
Meridian: 6 | |
Range: 08 | |
Section: 28 | |
County/Municipality: Mackenzie County | |
Well Name: HUSKY MOBIL RAINBOW 13-28-108-8 | |
Operator Name: Husky Oil Operations Limited | |
License Number: 0030496 | |
License Date: 1966-06-01 | |
License Status: Abandoned | |
Spud Date: 1966-06-03 | |
Final Drill Date: 1966-08-07 | |
Well Total Depth: 2083.30 m | |
Surface Hole Latitude: 58.410816 | |
Surface Hole Longitude: -119.281052 |
Date | Event |
---|---|
1909-09-09 | Well Log Performed |
1966-06-01 | Obtained License |
1966-06-19 | Drill Stem Test Performed |
1966-06-28 | Drill Stem Test Performed |
1966-07-02 | Liner Casing Operation Performed |
1966-07-06 | Drill Stem Test Performed |
1966-07-08 | Drill Stem Test Performed |
1966-07-11 | Perforation Treatment Performed - Jet Perforation |
1966-07-20 | Drill Stem Test Performed |
1966-07-22 | Lost Circulation Occurred |
1966-07-25 | Drill Stem Test Performed |
1966-08-07 | Finished Drilling |
1966-08-07 | Perforation Treatment Performed - Open-Hole Completion |
1966-08-07 | Well Mode changed to Drilled and Cased |
1966-08-11 | Perforation Treatment Performed - Acid Squeeze - Press Used |
1966-08-12 | Well Began Production |
1966-08-12 | Well Fluid changed to Crude Oil |
1966-08-12 | Well Mode changed to Flowing |
1969-02-13 | Well Fluid changed to Crude Oil |
1969-02-13 | Well Mode changed to Suspended |
1972-03-25 | Perforation Treatment Performed - Cement Squeeze |
1972-03-29 | Perforation Treatment Performed - Jet Perforation |
1972-03-30 | Perforation Treatment Performed - Acid Squeeze - Press Used |
1972-10-21 | Well Began Injection |
1972-10-21 | Well Fluid changed to Gas |
1972-10-21 | Well Type changed to Injection |
1979-05-06 | Well Log Performed |
1983-09-08 | Perforation Treatment Performed - Jet Perforation |
1983-09-10 | Perforation Treatment Performed - Acid Squeeze - Press Used |
1983-09-12 | Perforation Treatment Performed - Acid Squeeze - Press Used |
1983-09-16 | Perforation Treatment Performed - Acid Squeeze - Press Used |
1983-09-21 | Perforation Treatment Performed - Jet Perforation |
1983-09-24 | Perforation Treatment Performed - Acid Squeeze - Press Used |
1983-09-24 | Perforation Treatment Performed - Jet Perforation |
1983-09-24 | Well Fluid changed to Gas |
1983-09-24 | Well Type changed to Injection |
1984-01-20 | Perforation Treatment Performed - Acid Squeeze - Press Used |
1984-05-28 | Perforation Treatment Performed - Acid Squeeze - Press Used |
1996-03-16 | Well Log Performed |
1996-03-17 | Well Log Performed |
1996-03-21 | Perforation Treatment Performed - Jet Perforation |
1996-03-21 | Well Log Performed |
1996-03-22 | Well Log Performed |
1996-03-23 | Perforation Treatment Performed - Acid Squeeze - Press Used |
1996-03-24 | Well Log Performed |
1996-03-25 | Well Log Performed |
1996-04-01 | Well Fluid changed to Gas |
1996-04-01 | Well Type changed to Injection |
2003-11-01 | Well Fluid changed to Gas |
2003-11-01 | Well Mode changed to Suspended |
2003-11-01 | Well Type changed to Injection |
2017-07-10 | Well Log Performed |
2017-07-13 | Well Log Performed |
2017-07-15 | Well Log Performed |
2017-07-16 | Perforation Treatment Performed - Bridge Plug Capped W/Cement |
2017-07-17 | Perforation Treatment Performed - Jet Perforation |
2017-07-17 | Well Log Performed |
2017-07-18 | Perforation Treatment Performed - Bridge Plug Capped W/Cement |
2017-07-18 | Perforation Treatment Performed - Cement Plug |
2017-07-18 | Perforation Treatment Performed - Jet Perforation |
2017-07-18 | Perforation Treatment Performed - Remedial Casing |
2017-07-18 | Well Log Performed |
2017-07-19 | Perforation Treatment Performed - Cement Plug |
2017-07-20 | Perforation Treatment Performed - Cement Plug |
2017-07-20 | Perforation Treatment Performed - Jet Perforation |
2017-07-20 | Well Log Performed |
2017-07-21 | Perforation Treatment Performed - Jet Perforation |
2017-07-21 | Well Log Performed |
2017-07-22 | Perforation Treatment Performed - Bridge Plug Capped W/Cement |
2017-07-22 | Perforation Treatment Performed - Cement Plug |
2017-07-22 | Perforation Treatment Performed - Remedial Casing |
2017-07-22 | Plug Back Performed |
2017-07-22 | Well Fluid changed to Gas |
2017-07-22 | Well Mode changed to Abandoned Zone |
2017-07-22 | Well Type changed to Injection |
2017-07-23 | Well Log Performed |
2017-08-29 | Well Abandoned |
For data sources see[3]
Perforation Date | Perforation Type | Interval Top (m) | Interval Base (m) | Number of Shots |
---|---|---|---|---|
1966-07-11 | Perforation | 1742.80 | 1743.20 | 20 |
1983-09-16 | Acid Treatment | 1946.00 | 1953.50 | 0 |
1983-09-21 | Perforation | 1937.60 | 1942.50 | 7 |
1983-09-24 | Perforation | 1946.00 | 1953.50 | 7 |
1983-09-24 | Perforation | 1937.60 | 1942.50 | 7 |
1983-09-24 | Acid Treatment | 1937.60 | 1953.50 | 0 |
1984-01-20 | Acid Treatment | 1937.60 | 1953.50 | 0 |
1984-05-28 | Acid Treatment | 1937.60 | 1953.50 | 0 |
1996-03-21 | Perforation | 1980.50 | 1983.50 | 20 |
1996-03-21 | Perforation | 1977.50 | 1980.50 | 20 |
1996-03-21 | Perforation | 1974.50 | 1977.50 | 20 |
1966-08-07 | Open Hole/Barefoot Completion | 1748.60 | 2083.30 | 0 |
1996-03-23 | Acid Treatment | 1974.50 | 1983.50 | 0 |
2017-07-16 | Packing Device Capped w/Cement | 1569.00 | 1740.00 | 0 |
2017-07-17 | Perforation | 1026.00 | 1029.00 | 17 |
2017-07-18 | Remedial Casing Cementing | 1026.00 | 1029.00 | 0 |
2017-07-18 | Cement Plug | 1021.00 | 1040.00 | 0 |
2017-07-18 | Packing Device Capped w/Cement | 987.00 | 1021.00 | 0 |
2017-07-18 | Perforation | 880.00 | 883.00 | 17 |
2017-07-19 | Cement Plug | 825.00 | 897.00 | 0 |
2017-07-20 | Perforation | 668.00 | 671.00 | 17 |
2017-07-20 | Cement Plug | 614.20 | 689.00 | 0 |
1966-08-11 | Acid Treatment | 1748.60 | 2083.30 | 0 |
2017-07-21 | Perforation | 438.00 | 441.00 | 20 |
2017-07-22 | Remedial Casing Cementing | 438.00 | 441.00 | 0 |
2017-07-22 | Cement Plug | 437.80 | 445.50 | 0 |
2017-07-22 | Packing Device Capped w/Cement | 424.70 | 432.70 | 0 |
1972-03-25 | Cement Squeeze | 1742.80 | 2083.30 | 0 |
1972-03-29 | Perforation | 1780.60 | 1789.20 | 13 |
1972-03-30 | Acid Treatment | 1780.60 | 1789.20 | 0 |
1983-09-08 | Perforation | 1946.00 | 1953.50 | 13 |
1983-09-10 | Acid Treatment | 1946.00 | 1953.50 | 0 |
1983-09-12 | Acid Treatment | 1946.00 | 1953.50 | 0 |
For data sources see[4]
Period | Total Production Hours | Gas Quantity (m3) | Oil Quantity (m3) | Water Quantity (m3) |
---|---|---|---|---|
1966 | 0 | 0.0 | 0.0 | 0.0 |
1967 | 879 | 0.0 | 0.0 | 0.0 |
1972 | 0 | 0.0 | 0.0 | 0.0 |
1973 | 0 | 0.0 | 0.0 | 0.0 |
1974 | 0 | 0.0 | 0.0 | 0.0 |
1975 | 0 | 0.0 | 0.0 | 0.0 |
1976 | 0 | 0.0 | 0.0 | 0.0 |
1977 | 0 | 0.0 | 0.0 | 0.0 |
1978 | 0 | 0.0 | 0.0 | 0.0 |
1979 | 0 | 0.0 | 0.0 | 0.0 |
1980 | 0 | 0.0 | 0.0 | 0.0 |
1981 | 0 | 0.0 | 0.0 | 0.0 |
1982 | 0 | 0.0 | 0.0 | 0.0 |
1983 | 0 | 0.0 | 0.0 | 0.0 |
1984 | 0 | 0.0 | 0.0 | 0.0 |
1985 | 0 | 0.0 | 0.0 | 0.0 |
1986 | 0 | 0.0 | 0.0 | 0.0 |
1987 | 0 | 0.0 | 0.0 | 0.0 |
1988 | 0 | 0.0 | 0.0 | 0.0 |
1989 | 0 | 0.0 | 0.0 | 0.0 |
1990 | 0 | 0.0 | 0.0 | 0.0 |
1991 | 0 | 0.0 | 0.0 | 0.0 |
1992 | 0 | 0.0 | 0.0 | 0.0 |
1993 | 0 | 0.0 | 0.0 | 0.0 |
1994 | 0 | 0.0 | 0.0 | 0.0 |
1995 | 0 | 0.0 | 0.0 | 0.0 |
1996 | 0 | 0.0 | 0.0 | 0.0 |
1997 | 0 | 0.0 | 0.0 | 0.0 |
1998 | 0 | 0.0 | 0.0 | 0.0 |
1999 | 0 | 0.0 | 0.0 | 0.0 |
2000 | 0 | 0.0 | 0.0 | 0.0 |
For data sources see[5]
Occurence Date | Occurence Type | Occurence Depth (m) | Occurence Control Depth (m) |
---|---|---|---|
1966-07-22 | Lost Circulation | 1812.00 | 1812.00 |
2017-07-23 | No Incident Encountered | 0.00 | 0.00 |
For data sources see[6]