X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

1086073306002

Well Details

Well ID: 1086073306002
Loading map...
Location: 00/06-33-108-07W6/2
Location Alias: 00/06-33-08-07 W6M
Location Alias 2: 00/06-33-108-07 W6/02
Country: Canada
Province: Alberta
Township: 108
Meridian: 6
Range: 07
Section: 33
County/Municipality: Mackenzie County
Well Name: HUSKY MOBIL RAINBOW 6-33-108-7
Operator Name: Husky Oil Operations Limited
License Number: 0063366
License Date: 1977-04-01
License Status: Suspension
Spud Date: 1977-06-29
Final Drill Date: 1977-07-26
Well Total Depth: 1914.10 m
Surface Hole Latitude: 58.418314
Surface Hole Longitude: -119.106145

For data sources see[1][2]

Well History

Date Event
1909-09-09 Well Log Performed
1977-04-01 Obtained License
1977-07-20 Lost Circulation Occurred
1977-07-24 Kick Occurred
1977-07-26 Finished Drilling
1977-07-26 Lost Circulation Occurred
1977-07-26 Well Mode changed to Drilled and Cased
1977-07-27 Well Log Performed
1977-08-16 Perforation Treatment Performed - Jet Perforation
1977-08-17 Perforation Treatment Performed - Acid Squeeze - Press Used
1984-03-04 Perforation Treatment Performed - Cement Squeeze
1984-03-08 Perforation Treatment Performed - Jet Perforation
1988-06-05 Perforation Treatment Performed - Cement Squeeze
1988-06-10 Perforation Treatment Performed - Jet Perforation
1989-12-13 Perforation Treatment Performed - Jet Perforation
1989-12-19 Perforation Treatment Performed - Cement Squeeze
1989-12-22 Perforation Treatment Performed - Jet Perforation
1989-12-31 Perforation Treatment Performed - Bridge Plug Capped W/Cement
1997-11-06 Well Log Performed
1997-11-09 Well Log Performed
2005-03-21 Well Log Performed
2005-03-22 Perforation Treatment Performed - Jet Perforation
2005-03-28 Well Log Performed
2005-04-14 Well Log Performed
2014-02-21 Well Log Performed
2014-02-24 Well Log Performed
2014-02-25 Well Log Performed
2014-03-07 Liner Casing Operation Performed
2014-03-11 Well Log Performed
2014-03-12 Perforation Treatment Performed - Jet Perforation
2014-03-12 Well Log Performed
2014-03-17 Perforation Treatment Performed - Cement Squeeze
2014-03-20 Perforation Treatment Performed - Jet Perforation
2014-03-20 Well Log Performed
2014-03-21 Perforation Treatment Performed - Jet Perforation
2014-03-21 Well Log Performed
2014-03-22 Perforation Treatment Performed - Acid Squeeze - Press Used
2014-03-25 Perforation Treatment Performed - Acid Squeeze - Press Used
2014-03-26 Perforation Treatment Performed - Acid Squeeze - Press Used
2014-03-27 Perforation Treatment Performed - Acid Squeeze - Press Used
2014-04-02 Perforation Treatment Performed - Cement Squeeze
2014-04-07 Perforation Treatment Performed - Jet Perforation
2014-04-07 Well Log Performed
2014-04-08 Perforation Treatment Performed - Acid Squeeze - Press Used
2014-04-09 Perforation Treatment Performed - Acid Squeeze - Press Used
2014-04-10 Perforation Treatment Performed - Acid Squeeze - Press Used
2014-04-12 Perforation Treatment Performed - Jet Perforation
2014-04-12 Well Log Performed
2014-04-13 Perforation Treatment Performed - Acid Squeeze - Press Used
2014-04-13 Perforation Treatment Performed - Chemical Squeeze
2014-04-14 Perforation Treatment Performed - Chemical Squeeze
2014-05-09 Well Began Production
2014-05-09 Well Fluid changed to Crude Oil
2014-05-09 Well Mode changed to Pumping
2014-10-01 Perforation Treatment Performed - Chemical Squeeze
2014-10-02 Perforation Treatment Performed - Acid Squeeze - Press Used
2017-10-04 Well Fluid changed to Crude Oil
2017-10-04 Well Mode changed to Suspended

For data sources see[3]


Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
1977-08-16 Perforation 1852.90 1856.20 7
1989-12-19 Cement Squeeze 1827.00 1841.00 0
1989-12-22 Perforation 1829.00 1831.00 13
1989-12-22 Perforation 1825.50 1827.50 13
1989-12-31 Packing Device Capped w/Cement 1847.00 1851.00 0
2005-03-22 Perforation 1867.00 1869.00 13
2005-03-22 Perforation 1873.00 1874.00 13
2014-03-12 Perforation 1769.50 1771.00 13
2014-03-12 Perforation 1756.50 1758.00 13
2014-03-12 Perforation 1742.50 1748.00 13
2014-03-12 Perforation 1730.00 1731.50 13
1977-08-17 Acid Treatment 1852.90 1856.20 0
2014-03-12 Perforation 1725.00 1726.50 13
2014-03-12 Perforation 1716.50 1718.00 13
2014-03-12 Perforation 1710.50 1712.00 13
2014-03-12 Perforation 1706.00 1707.50 13
2014-03-17 Cement Squeeze 1706.00 1771.00 0
2014-03-20 Perforation 1769.50 1771.00 13
2014-03-20 Perforation 1756.50 1758.00 13
2014-03-20 Perforation 1742.50 1748.00 13
2014-03-20 Perforation 1730.00 1731.50 13
2014-03-20 Perforation 1725.00 1726.50 13
1984-03-04 Cement Squeeze 1852.90 1856.20 0
2014-03-21 Perforation 1716.50 1718.00 13
2014-03-21 Perforation 1710.50 1712.00 13
2014-03-21 Perforation 1706.00 1707.50 13
2014-03-22 Acid Treatment 1769.50 1771.00 0
2014-03-25 Acid Treatment 1706.00 1758.00 0
2014-03-26 Acid Treatment 1742.50 1758.00 0
2014-03-27 Acid Treatment 1706.00 1718.00 0
2014-04-02 Cement Squeeze 1706.00 1771.00 0
2014-04-07 Perforation 1742.50 1748.00 13
2014-04-07 Perforation 1730.00 1731.50 13
1984-03-08 Perforation 1852.50 1856.20 13
2014-04-07 Perforation 1725.00 1726.50 13
2014-04-07 Perforation 1716.50 1718.00 13
2014-04-07 Perforation 1710.50 1712.00 13
2014-04-07 Perforation 1706.00 1707.50 13
2014-04-08 Acid Treatment 1742.50 1748.00 0
2014-04-09 Acid Treatment 1725.00 1731.50 0
2014-04-10 Acid Treatment 1706.00 1718.00 0
2014-04-12 Perforation 1716.50 1718.00 13
2014-04-12 Perforation 1710.50 1712.00 13
2014-04-12 Perforation 1706.00 1707.50 13
1984-03-08 Perforation 1837.90 1842.80 13
2014-04-13 Chemical Squeeze 1706.00 1718.00 0
2014-04-13 Acid Treatment 1706.00 1718.00 0
2014-04-14 Chemical Squeeze 1706.00 1718.00 0
2014-10-01 Chemical Squeeze 1706.00 1718.00 0
2014-10-01 Chemical Squeeze 1725.00 1731.50 0
2014-10-01 Chemical Squeeze 1742.50 1748.00 0
2014-10-02 Acid Treatment 1706.00 1718.00 0
2014-10-02 Acid Treatment 1725.00 1731.50 0
2014-10-02 Acid Treatment 1742.50 1748.00 0
1988-06-05 Cement Squeeze 1837.90 1856.20 0
1988-06-10 Perforation 1832.00 1835.00 13
1988-06-10 Perforation 1837.00 1841.00 13
1989-12-13 Perforation 1827.00 1828.00 13

For data sources see[4]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
2014 195 0.0 0.0 0.0
2015 710 0.0 0.0 0.0
2016 479 0.0 0.0 0.0
2017 344 0.0 0.0 0.0

For data sources see[5]

Occurences

Occurence Date Occurence Type Occurence Depth (m) Occurence Control Depth (m)
1977-07-20 Lost Circulation 1797.10 1797.10
1977-07-24 Kick 1864.20 1864.20
1977-07-26 Lost Circulation 1914.10 1914.10
2014-04-18 No Incident Encountered 0.00 0.00
2014-10-02 No Incident Encountered 0.00 0.00

For data sources see[6]

References