X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

1086072809002

Well Details

Well ID: 1086072809002
Loading map...
Location: 00/09-28-108-07W6/2
Location Alias: 00/09-28-08-07 W6M
Location Alias 2: 00/09-28-108-07 W6/02
Country: Canada
Province: Alberta
Township: 108
Meridian: 6
Range: 07
Section: 28
County/Municipality: Mackenzie County
Well Name: HUSKY MOBIL RAINBOW 9-28-108-7
Operator Name: Husky Oil Operations Limited
License Number: 0142232
License Date: 1989-12-18
License Status: Suspension
Spud Date: 1990-01-12
Final Drill Date: 1990-02-01
Well Total Depth: 1918.00 m
Surface Hole Latitude: 58.406671
Surface Hole Longitude: -119.091001

For data sources see[1][2]

Well History

Date Event
1989-12-18 Obtained License
1990-01-13 Surface Casing Operation Performed
1990-01-23 Lost Circulation Occurred
1990-01-25 Well Log Performed
1990-01-27 Intermediate Casing Operation Performed
1990-01-30 Well Log Performed
1990-02-01 Finished Drilling
1990-02-01 Lost Circulation Occurred
1990-02-01 Well Mode changed to Drilled and Cased
1990-02-07 Well Log Performed
1990-02-09 Liner Casing Operation Performed
1990-02-09 Rig Released
1990-03-19 Well Log Performed
1990-03-20 Perforation Treatment Performed - Jet Perforation
1990-03-21 Perforation Treatment Performed - Acid Squeeze - Press Used
1990-03-24 Perforation Treatment Performed - Cement Squeeze
1990-03-27 Perforation Treatment Performed - Jet Perforation
1990-03-28 Perforation Treatment Performed - Acid Squeeze - Press Used
1990-03-29 Perforation Treatment Performed - Acid Squeeze - Press Used
1990-03-30 Perforation Treatment Performed - Acid Squeeze - Press Used
1991-12-19 Well Log Performed
1992-01-30 Well Log Performed
1992-02-01 Perforation Treatment Performed - Cement Squeeze
1992-02-01 Well Log Performed
1992-02-05 Perforation Treatment Performed - Jet Perforation
1992-02-05 Well Log Performed
1992-02-06 Perforation Treatment Performed - Acid Squeeze - Press Used
1992-02-07 Perforation Treatment Performed - Acid Squeeze - Press Used
1992-02-09 Perforation Treatment Performed - Cement Squeeze
1992-02-12 Perforation Treatment Performed - Jet Perforation
1992-02-12 Well Log Performed
1992-02-14 Perforation Treatment Performed - Acid Squeeze - Press Used
1992-02-15 Perforation Treatment Performed - Acid Squeeze - Press Used
1992-02-16 Perforation Treatment Performed - Acid Squeeze - Press Used
1992-02-17 Perforation Treatment Performed - Acid Squeeze - Press Used
1992-02-18 Perforation Treatment Performed - Acid Squeeze - Press Used
1992-02-21 Well Log Performed
1996-02-17 Well Log Performed
1996-02-19 Perforation Treatment Performed - Jet Perforation
1996-02-19 Well Log Performed
1996-02-20 Perforation Treatment Performed - Acid Squeeze - Press Used
1996-02-21 Perforation Treatment Performed - Cement Squeeze
1996-02-25 Well Log Performed
1996-02-26 Perforation Treatment Performed - Jet Perforation
1996-02-27 Well Log Performed
1996-02-29 Perforation Treatment Performed - Acid Squeeze - Press Used
1996-03-03 Well Log Performed
1996-03-04 Perforation Treatment Performed - Jet Perforation
1996-03-05 Perforation Treatment Performed - Acid Squeeze - Press Used
2009-09-02 Perforation Treatment Performed - Cement Squeeze
2009-09-18 Perforation Treatment Performed - Jet Perforation
2009-09-18 Well Log Performed
2009-09-29 Well Log Performed
2009-10-04 Perforation Treatment Performed - Cement Squeeze
2009-11-05 Well Log Performed
2009-12-13 Perforation Treatment Performed - Cement Squeeze
2009-12-13 Well Log Performed
2009-12-14 Perforation Treatment Performed - Jet Perforation
2009-12-16 Well Log Performed
2009-12-17 Perforation Treatment Performed - Acid Squeeze - Press Used
2009-12-18 Perforation Treatment Performed - Jet Perforation
2009-12-18 Well Log Performed
2010-01-13 Perforation Treatment Performed - Acid Squeeze - Press Used
2010-01-14 Perforation Treatment Performed - Jet Perforation
2010-01-16 Perforation Treatment Performed - Acid Squeeze - Press Used
2014-05-10 Well Log Performed
2014-05-11 Perforation Treatment Performed - Jet Perforation
2014-05-11 Well Log Performed
2014-05-13 Perforation Treatment Performed - Acid Squeeze - Press Used
2014-07-22 Well Began Production
2014-07-22 Well Fluid changed to Crude Oil
2014-07-22 Well Mode changed to Pumping
2020-03-20 Well Fluid changed to Crude Oil
2020-03-20 Well Mode changed to Suspended

For data sources see[3]


Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
1990-03-20 Perforation 1819.00 1823.50 13
1990-03-29 Acid Treatment 1827.00 1831.50 0
1990-03-30 Acid Treatment 1819.00 1823.50 0
1992-02-01 Cement Squeeze 1819.00 1836.50 0
1992-02-05 Perforation 1800.00 1802.00 13
1992-02-05 Perforation 1819.00 1821.00 13
1992-02-05 Perforation 1827.00 1829.00 13
1992-02-05 Perforation 1834.00 1836.50 13
1992-02-06 Acid Treatment 1819.00 1821.00 0
1992-02-07 Acid Treatment 1800.00 1802.00 0
1992-02-09 Cement Squeeze 1800.00 1836.50 0
1990-03-20 Perforation 1827.00 1831.50 13
1992-02-12 Perforation 1800.00 1802.00 13
1992-02-12 Perforation 1819.00 1821.00 13
1992-02-12 Perforation 1827.00 1829.00 13
1992-02-12 Perforation 1834.00 1836.50 13
1992-02-14 Acid Treatment 1827.00 1829.00 0
1992-02-15 Acid Treatment 1819.00 1821.00 0
1992-02-16 Acid Treatment 1819.00 1821.00 0
1992-02-17 Acid Treatment 1819.00 1821.00 0
1992-02-18 Acid Treatment 1800.00 1802.00 0
1996-02-19 Perforation 1806.00 1807.50 13
1990-03-20 Perforation 1834.00 1836.50 13
1996-02-19 Perforation 1813.00 1814.50 13
1996-02-20 Acid Treatment 1813.00 1814.50 0
1996-02-21 Cement Squeeze 1800.00 1814.50 0
1996-02-26 Perforation 1800.00 1802.00 13
1996-02-26 Perforation 1806.20 1807.20 13
1996-02-26 Perforation 1813.20 1814.20 13
1996-02-29 Acid Treatment 1800.00 1807.20 0
1996-03-04 Perforation 1800.00 1802.00 13
1996-03-04 Perforation 1806.20 1807.20 13
1996-03-05 Acid Treatment 1806.20 1807.20 0
1990-03-21 Acid Treatment 1834.00 1836.50 0
1996-03-05 Acid Treatment 1800.00 1802.00 0
2009-09-02 Cement Squeeze 1834.00 1836.50 0
2009-09-02 Cement Squeeze 1827.00 1829.00 0
2009-09-02 Cement Squeeze 1819.00 1821.00 0
2009-09-02 Cement Squeeze 1813.20 1814.20 0
2009-09-02 Cement Squeeze 1806.00 1807.20 0
2009-09-02 Cement Squeeze 1800.00 1802.00 0
2009-09-18 Perforation 1874.00 1878.00 13
2009-09-18 Perforation 1865.00 1869.00 13
2009-09-18 Perforation 1856.00 1860.00 13
1990-03-24 Cement Squeeze 1819.00 1831.50 0
2009-09-18 Perforation 1849.00 1852.00 13
2009-09-18 Perforation 1834.50 1836.00 13
2009-10-04 Cement Squeeze 1874.00 1878.00 0
2009-10-04 Cement Squeeze 1865.00 1869.00 0
2009-10-04 Cement Squeeze 1856.00 1860.00 0
2009-10-04 Cement Squeeze 1849.00 1852.00 0
2009-12-13 Cement Squeeze 1834.50 1836.00 0
2009-12-14 Perforation 1874.50 1877.50 13
2009-12-14 Perforation 1865.50 1868.50 13
2009-12-14 Perforation 1856.50 1859.50 13
1990-03-27 Perforation 1819.00 1823.50 13
2009-12-14 Perforation 1849.50 1851.50 13
2009-12-14 Perforation 1834.50 1836.00 13
2009-12-17 Acid Treatment 1856.50 1859.50 0
2009-12-17 Acid Treatment 1856.50 1859.50 0
2009-12-18 Perforation 1861.80 1862.80 20
2010-01-13 Acid Treatment 1861.80 1862.80 0
2010-01-14 Perforation 1800.00 1802.00 13
2010-01-16 Acid Treatment 1800.00 1802.00 0
2014-05-11 Perforation 1746.00 1751.00 13
2014-05-13 Acid Treatment 1746.00 1751.00 0
1990-03-27 Perforation 1827.00 1831.50 13
1990-03-27 Perforation 1834.00 1836.50 13
1990-03-28 Acid Treatment 1834.00 1836.50 0

For data sources see[4]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
2014 3305 0.0 0.0 0.0
2015 4570 0.0 0.0 0.0
2016 4196 0.0 0.0 0.0
2017 8434 0.0 0.0 0.0
2018 8446 0.0 0.0 0.0
2019 4829 0.0 0.0 0.0
2020 274 0.0 0.0 0.0

For data sources see[5]

Occurences

Occurence Date Occurence Type Occurence Depth (m) Occurence Control Depth (m)
1990-01-23 Lost Circulation 1688.00 1704.00
1990-02-01 Lost Circulation 1841.80 1918.00
2014-06-24 No Incident Encountered 0.00 0.00

For data sources see[6]

References