If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.
powered by ChangeDetection
Well ID: 1086072809000 | Loading map...
{"type":"SATELLITE","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"100%","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"wmsoverlay":false,"copycoords":false,"static":false,"zoom":14,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"markercluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","enablefullscreen":false,"scrollwheelzoom":false,"locations":[{"text":"","title":"","link":"","lat":58.406671,"lon":-119.091001,"icon":""}]} |
Location: 00/09-28-108-07W6/0 | |
Location Alias: 00/09-28-08-07 W6M | |
Location Alias 2: 00/09-28-108-07 W6/00 | |
Country: Canada | |
Province: Alberta | |
Township: 108 | |
Meridian: 6 | |
Range: 07 | |
Section: 28 | |
County/Municipality: Mackenzie County | |
Well Name: HUSKY MOBIL RAINBOW 9-28-108-7 | |
Operator Name: Husky Oil Operations Limited | |
License Number: 0142232 | |
License Date: 1989-12-18 | |
License Status: Suspension | |
Spud Date: 1990-01-12 | |
Final Drill Date: 1990-02-01 | |
Well Total Depth: 1918.00 m | |
Surface Hole Latitude: 58.406671 | |
Surface Hole Longitude: -119.091001 |
Date | Event |
---|---|
1989-12-18 | Obtained License |
1990-01-13 | Surface Casing Operation Performed |
1990-01-23 | Lost Circulation Occurred |
1990-01-25 | Well Log Performed |
1990-01-27 | Intermediate Casing Operation Performed |
1990-01-30 | Well Log Performed |
1990-02-01 | Finished Drilling |
1990-02-01 | Lost Circulation Occurred |
1990-02-01 | Well Mode changed to Drilled and Cased |
1990-02-07 | Well Log Performed |
1990-02-09 | Liner Casing Operation Performed |
1990-02-09 | Rig Released |
1990-03-19 | Well Log Performed |
1990-03-20 | Perforation Treatment Performed - Jet Perforation |
1990-03-21 | Perforation Treatment Performed - Acid Squeeze - Press Used |
1990-03-24 | Perforation Treatment Performed - Cement Squeeze |
1990-03-27 | Perforation Treatment Performed - Jet Perforation |
1990-03-28 | Perforation Treatment Performed - Acid Squeeze - Press Used |
1990-03-29 | Perforation Treatment Performed - Acid Squeeze - Press Used |
1990-03-30 | Perforation Treatment Performed - Acid Squeeze - Press Used |
1990-04-03 | Well Began Production |
1990-04-03 | Well Fluid changed to Crude Oil |
1990-04-03 | Well Mode changed to Flowing |
1991-12-19 | Well Log Performed |
1992-01-30 | Well Log Performed |
1992-02-01 | Perforation Treatment Performed - Cement Squeeze |
1992-02-01 | Well Log Performed |
1992-02-05 | Perforation Treatment Performed - Jet Perforation |
1992-02-05 | Well Log Performed |
1992-02-06 | Perforation Treatment Performed - Acid Squeeze - Press Used |
1992-02-07 | Perforation Treatment Performed - Acid Squeeze - Press Used |
1992-02-09 | Perforation Treatment Performed - Cement Squeeze |
1992-02-12 | Perforation Treatment Performed - Jet Perforation |
1992-02-12 | Well Log Performed |
1992-02-14 | Perforation Treatment Performed - Acid Squeeze - Press Used |
1992-02-15 | Perforation Treatment Performed - Acid Squeeze - Press Used |
1992-02-16 | Perforation Treatment Performed - Acid Squeeze - Press Used |
1992-02-17 | Perforation Treatment Performed - Acid Squeeze - Press Used |
1992-02-18 | Perforation Treatment Performed - Acid Squeeze - Press Used |
1992-02-21 | Well Log Performed |
1996-02-17 | Well Log Performed |
1996-02-19 | Perforation Treatment Performed - Jet Perforation |
1996-02-19 | Well Log Performed |
1996-02-20 | Perforation Treatment Performed - Acid Squeeze - Press Used |
1996-02-21 | Perforation Treatment Performed - Cement Squeeze |
1996-02-25 | Well Log Performed |
1996-02-26 | Perforation Treatment Performed - Jet Perforation |
1996-02-27 | Well Log Performed |
1996-02-29 | Perforation Treatment Performed - Acid Squeeze - Press Used |
1996-03-03 | Well Log Performed |
1996-03-04 | Perforation Treatment Performed - Jet Perforation |
1996-03-05 | Perforation Treatment Performed - Acid Squeeze - Press Used |
2009-09-02 | Perforation Treatment Performed - Cement Squeeze |
2009-09-18 | Perforation Treatment Performed - Jet Perforation |
2009-09-18 | Well Log Performed |
2009-09-29 | Well Log Performed |
2009-10-04 | Perforation Treatment Performed - Cement Squeeze |
2009-11-05 | Well Log Performed |
2009-12-13 | Perforation Treatment Performed - Cement Squeeze |
2009-12-13 | Well Log Performed |
2009-12-14 | Perforation Treatment Performed - Jet Perforation |
2009-12-16 | Well Log Performed |
2009-12-17 | Perforation Treatment Performed - Acid Squeeze - Press Used |
2009-12-18 | Perforation Treatment Performed - Jet Perforation |
2009-12-18 | Well Log Performed |
2010-01-13 | Perforation Treatment Performed - Acid Squeeze - Press Used |
2010-01-14 | Perforation Treatment Performed - Jet Perforation |
2010-01-16 | Perforation Treatment Performed - Acid Squeeze - Press Used |
2014-01-03 | Well Fluid changed to Crude Oil |
2014-01-03 | Well Mode changed to Suspended |
2014-05-10 | Well Log Performed |
2014-05-11 | Perforation Treatment Performed - Jet Perforation |
2014-05-11 | Well Log Performed |
2014-05-13 | Perforation Treatment Performed - Acid Squeeze - Press Used |
For data sources see[3]
Perforation Date | Perforation Type | Interval Top (m) | Interval Base (m) | Number of Shots |
---|---|---|---|---|
1990-03-20 | Perforation | 1819.00 | 1823.50 | 13 |
1990-03-29 | Acid Treatment | 1827.00 | 1831.50 | 0 |
1990-03-30 | Acid Treatment | 1819.00 | 1823.50 | 0 |
1992-02-01 | Cement Squeeze | 1819.00 | 1836.50 | 0 |
1992-02-05 | Perforation | 1800.00 | 1802.00 | 13 |
1992-02-05 | Perforation | 1819.00 | 1821.00 | 13 |
1992-02-05 | Perforation | 1827.00 | 1829.00 | 13 |
1992-02-05 | Perforation | 1834.00 | 1836.50 | 13 |
1992-02-06 | Acid Treatment | 1819.00 | 1821.00 | 0 |
1992-02-07 | Acid Treatment | 1800.00 | 1802.00 | 0 |
1992-02-09 | Cement Squeeze | 1800.00 | 1836.50 | 0 |
1990-03-20 | Perforation | 1827.00 | 1831.50 | 13 |
1992-02-12 | Perforation | 1800.00 | 1802.00 | 13 |
1992-02-12 | Perforation | 1819.00 | 1821.00 | 13 |
1992-02-12 | Perforation | 1827.00 | 1829.00 | 13 |
1992-02-12 | Perforation | 1834.00 | 1836.50 | 13 |
1992-02-14 | Acid Treatment | 1827.00 | 1829.00 | 0 |
1992-02-15 | Acid Treatment | 1819.00 | 1821.00 | 0 |
1992-02-16 | Acid Treatment | 1819.00 | 1821.00 | 0 |
1992-02-17 | Acid Treatment | 1819.00 | 1821.00 | 0 |
1992-02-18 | Acid Treatment | 1800.00 | 1802.00 | 0 |
1996-02-19 | Perforation | 1806.00 | 1807.50 | 13 |
1990-03-20 | Perforation | 1834.00 | 1836.50 | 13 |
1996-02-19 | Perforation | 1813.00 | 1814.50 | 13 |
1996-02-20 | Acid Treatment | 1813.00 | 1814.50 | 0 |
1996-02-21 | Cement Squeeze | 1800.00 | 1814.50 | 0 |
1996-02-26 | Perforation | 1800.00 | 1802.00 | 13 |
1996-02-26 | Perforation | 1806.20 | 1807.20 | 13 |
1996-02-26 | Perforation | 1813.20 | 1814.20 | 13 |
1996-02-29 | Acid Treatment | 1800.00 | 1807.20 | 0 |
1996-03-04 | Perforation | 1800.00 | 1802.00 | 13 |
1996-03-04 | Perforation | 1806.20 | 1807.20 | 13 |
1996-03-05 | Acid Treatment | 1806.20 | 1807.20 | 0 |
1990-03-21 | Acid Treatment | 1834.00 | 1836.50 | 0 |
1996-03-05 | Acid Treatment | 1800.00 | 1802.00 | 0 |
2009-09-02 | Cement Squeeze | 1834.00 | 1836.50 | 0 |
2009-09-02 | Cement Squeeze | 1827.00 | 1829.00 | 0 |
2009-09-02 | Cement Squeeze | 1819.00 | 1821.00 | 0 |
2009-09-02 | Cement Squeeze | 1813.20 | 1814.20 | 0 |
2009-09-02 | Cement Squeeze | 1806.00 | 1807.20 | 0 |
2009-09-02 | Cement Squeeze | 1800.00 | 1802.00 | 0 |
2009-09-18 | Perforation | 1874.00 | 1878.00 | 13 |
2009-09-18 | Perforation | 1865.00 | 1869.00 | 13 |
2009-09-18 | Perforation | 1856.00 | 1860.00 | 13 |
1990-03-24 | Cement Squeeze | 1819.00 | 1831.50 | 0 |
2009-09-18 | Perforation | 1849.00 | 1852.00 | 13 |
2009-09-18 | Perforation | 1834.50 | 1836.00 | 13 |
2009-10-04 | Cement Squeeze | 1874.00 | 1878.00 | 0 |
2009-10-04 | Cement Squeeze | 1865.00 | 1869.00 | 0 |
2009-10-04 | Cement Squeeze | 1856.00 | 1860.00 | 0 |
2009-10-04 | Cement Squeeze | 1849.00 | 1852.00 | 0 |
2009-12-13 | Cement Squeeze | 1834.50 | 1836.00 | 0 |
2009-12-14 | Perforation | 1874.50 | 1877.50 | 13 |
2009-12-14 | Perforation | 1865.50 | 1868.50 | 13 |
2009-12-14 | Perforation | 1856.50 | 1859.50 | 13 |
1990-03-27 | Perforation | 1819.00 | 1823.50 | 13 |
2009-12-14 | Perforation | 1849.50 | 1851.50 | 13 |
2009-12-14 | Perforation | 1834.50 | 1836.00 | 13 |
2009-12-17 | Acid Treatment | 1856.50 | 1859.50 | 0 |
2009-12-17 | Acid Treatment | 1856.50 | 1859.50 | 0 |
2009-12-18 | Perforation | 1861.80 | 1862.80 | 20 |
2010-01-13 | Acid Treatment | 1861.80 | 1862.80 | 0 |
2010-01-14 | Perforation | 1800.00 | 1802.00 | 13 |
2010-01-16 | Acid Treatment | 1800.00 | 1802.00 | 0 |
2014-05-11 | Perforation | 1746.00 | 1751.00 | 13 |
2014-05-13 | Acid Treatment | 1746.00 | 1751.00 | 0 |
1990-03-27 | Perforation | 1827.00 | 1831.50 | 13 |
1990-03-27 | Perforation | 1834.00 | 1836.50 | 13 |
1990-03-28 | Acid Treatment | 1834.00 | 1836.50 | 0 |
For data sources see[4]
Period | Total Production Hours | Gas Quantity (m3) | Oil Quantity (m3) | Water Quantity (m3) |
---|---|---|---|---|
1990 | 4431 | 0.0 | 0.0 | 0.0 |
1991 | 5861 | 0.0 | 0.0 | 0.0 |
1992 | 6421 | 0.0 | 0.0 | 0.0 |
1993 | 8025 | 0.0 | 0.0 | 0.0 |
1994 | 3478 | 0.0 | 0.0 | 0.0 |
1995 | 2413 | 0.0 | 0.0 | 0.0 |
1996 | 6105 | 0.0 | 0.0 | 0.0 |
1997 | 6076 | 0.0 | 0.0 | 0.0 |
1998 | 6110 | 0.0 | 0.0 | 0.0 |
1999 | 7996 | 0.0 | 0.0 | 0.0 |
2000 | 8292 | 0.0 | 0.0 | 0.0 |
2001 | 4862 | 0.0 | 0.0 | 0.0 |
2002 | 7322 | 0.0 | 0.0 | 0.0 |
2003 | 8376 | 0.0 | 0.0 | 0.0 |
2004 | 8317 | 0.0 | 0.0 | 0.0 |
2005 | 8427 | 0.0 | 0.0 | 0.0 |
2006 | 7433 | 0.0 | 0.0 | 0.0 |
2007 | 8413 | 0.0 | 0.0 | 0.0 |
2008 | 7597 | 0.0 | 0.0 | 0.0 |
2009 | 2831 | 0.0 | 0.0 | 0.0 |
2010 | 5166 | 0.0 | 0.0 | 0.0 |
2011 | 4318 | 0.0 | 0.0 | 0.0 |
2012 | 7071 | 0.0 | 0.0 | 0.0 |
2013 | 2627 | 0.0 | 0.0 | 0.0 |
For data sources see[5]
Occurence Date | Occurence Type | Occurence Depth (m) | Occurence Control Depth (m) |
---|---|---|---|
1990-01-23 | Lost Circulation | 1688.00 | 1704.00 |
1990-02-01 | Lost Circulation | 1841.80 | 1918.00 |
2014-06-24 | No Incident Encountered | 0.00 | 0.00 |
For data sources see[6]