X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

1086072809000

Well Details

Well ID: 1086072809000
Loading map...
Location: 00/09-28-108-07W6/0
Location Alias: 00/09-28-08-07 W6M
Location Alias 2: 00/09-28-108-07 W6/00
Country: Canada
Province: Alberta
Township: 108
Meridian: 6
Range: 07
Section: 28
County/Municipality: Mackenzie County
Well Name: HUSKY MOBIL RAINBOW 9-28-108-7
Operator Name: Husky Oil Operations Limited
License Number: 0142232
License Date: 1989-12-18
License Status: Suspension
Spud Date: 1990-01-12
Final Drill Date: 1990-02-01
Well Total Depth: 1918.00 m
Surface Hole Latitude: 58.406671
Surface Hole Longitude: -119.091001

For data sources see[1][2]

Well History

Date Event
1989-12-18 Obtained License
1990-01-13 Surface Casing Operation Performed
1990-01-23 Lost Circulation Occurred
1990-01-25 Well Log Performed
1990-01-27 Intermediate Casing Operation Performed
1990-01-30 Well Log Performed
1990-02-01 Finished Drilling
1990-02-01 Lost Circulation Occurred
1990-02-01 Well Mode changed to Drilled and Cased
1990-02-07 Well Log Performed
1990-02-09 Liner Casing Operation Performed
1990-02-09 Rig Released
1990-03-19 Well Log Performed
1990-03-20 Perforation Treatment Performed - Jet Perforation
1990-03-21 Perforation Treatment Performed - Acid Squeeze - Press Used
1990-03-24 Perforation Treatment Performed - Cement Squeeze
1990-03-27 Perforation Treatment Performed - Jet Perforation
1990-03-28 Perforation Treatment Performed - Acid Squeeze - Press Used
1990-03-29 Perforation Treatment Performed - Acid Squeeze - Press Used
1990-03-30 Perforation Treatment Performed - Acid Squeeze - Press Used
1990-04-03 Well Began Production
1990-04-03 Well Fluid changed to Crude Oil
1990-04-03 Well Mode changed to Flowing
1991-12-19 Well Log Performed
1992-01-30 Well Log Performed
1992-02-01 Perforation Treatment Performed - Cement Squeeze
1992-02-01 Well Log Performed
1992-02-05 Perforation Treatment Performed - Jet Perforation
1992-02-05 Well Log Performed
1992-02-06 Perforation Treatment Performed - Acid Squeeze - Press Used
1992-02-07 Perforation Treatment Performed - Acid Squeeze - Press Used
1992-02-09 Perforation Treatment Performed - Cement Squeeze
1992-02-12 Perforation Treatment Performed - Jet Perforation
1992-02-12 Well Log Performed
1992-02-14 Perforation Treatment Performed - Acid Squeeze - Press Used
1992-02-15 Perforation Treatment Performed - Acid Squeeze - Press Used
1992-02-16 Perforation Treatment Performed - Acid Squeeze - Press Used
1992-02-17 Perforation Treatment Performed - Acid Squeeze - Press Used
1992-02-18 Perforation Treatment Performed - Acid Squeeze - Press Used
1992-02-21 Well Log Performed
1996-02-17 Well Log Performed
1996-02-19 Perforation Treatment Performed - Jet Perforation
1996-02-19 Well Log Performed
1996-02-20 Perforation Treatment Performed - Acid Squeeze - Press Used
1996-02-21 Perforation Treatment Performed - Cement Squeeze
1996-02-25 Well Log Performed
1996-02-26 Perforation Treatment Performed - Jet Perforation
1996-02-27 Well Log Performed
1996-02-29 Perforation Treatment Performed - Acid Squeeze - Press Used
1996-03-03 Well Log Performed
1996-03-04 Perforation Treatment Performed - Jet Perforation
1996-03-05 Perforation Treatment Performed - Acid Squeeze - Press Used
2009-09-02 Perforation Treatment Performed - Cement Squeeze
2009-09-18 Perforation Treatment Performed - Jet Perforation
2009-09-18 Well Log Performed
2009-09-29 Well Log Performed
2009-10-04 Perforation Treatment Performed - Cement Squeeze
2009-11-05 Well Log Performed
2009-12-13 Perforation Treatment Performed - Cement Squeeze
2009-12-13 Well Log Performed
2009-12-14 Perforation Treatment Performed - Jet Perforation
2009-12-16 Well Log Performed
2009-12-17 Perforation Treatment Performed - Acid Squeeze - Press Used
2009-12-18 Perforation Treatment Performed - Jet Perforation
2009-12-18 Well Log Performed
2010-01-13 Perforation Treatment Performed - Acid Squeeze - Press Used
2010-01-14 Perforation Treatment Performed - Jet Perforation
2010-01-16 Perforation Treatment Performed - Acid Squeeze - Press Used
2014-01-03 Well Fluid changed to Crude Oil
2014-01-03 Well Mode changed to Suspended
2014-05-10 Well Log Performed
2014-05-11 Perforation Treatment Performed - Jet Perforation
2014-05-11 Well Log Performed
2014-05-13 Perforation Treatment Performed - Acid Squeeze - Press Used

For data sources see[3]


Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
1990-03-20 Perforation 1819.00 1823.50 13
1990-03-29 Acid Treatment 1827.00 1831.50 0
1990-03-30 Acid Treatment 1819.00 1823.50 0
1992-02-01 Cement Squeeze 1819.00 1836.50 0
1992-02-05 Perforation 1800.00 1802.00 13
1992-02-05 Perforation 1819.00 1821.00 13
1992-02-05 Perforation 1827.00 1829.00 13
1992-02-05 Perforation 1834.00 1836.50 13
1992-02-06 Acid Treatment 1819.00 1821.00 0
1992-02-07 Acid Treatment 1800.00 1802.00 0
1992-02-09 Cement Squeeze 1800.00 1836.50 0
1990-03-20 Perforation 1827.00 1831.50 13
1992-02-12 Perforation 1800.00 1802.00 13
1992-02-12 Perforation 1819.00 1821.00 13
1992-02-12 Perforation 1827.00 1829.00 13
1992-02-12 Perforation 1834.00 1836.50 13
1992-02-14 Acid Treatment 1827.00 1829.00 0
1992-02-15 Acid Treatment 1819.00 1821.00 0
1992-02-16 Acid Treatment 1819.00 1821.00 0
1992-02-17 Acid Treatment 1819.00 1821.00 0
1992-02-18 Acid Treatment 1800.00 1802.00 0
1996-02-19 Perforation 1806.00 1807.50 13
1990-03-20 Perforation 1834.00 1836.50 13
1996-02-19 Perforation 1813.00 1814.50 13
1996-02-20 Acid Treatment 1813.00 1814.50 0
1996-02-21 Cement Squeeze 1800.00 1814.50 0
1996-02-26 Perforation 1800.00 1802.00 13
1996-02-26 Perforation 1806.20 1807.20 13
1996-02-26 Perforation 1813.20 1814.20 13
1996-02-29 Acid Treatment 1800.00 1807.20 0
1996-03-04 Perforation 1800.00 1802.00 13
1996-03-04 Perforation 1806.20 1807.20 13
1996-03-05 Acid Treatment 1806.20 1807.20 0
1990-03-21 Acid Treatment 1834.00 1836.50 0
1996-03-05 Acid Treatment 1800.00 1802.00 0
2009-09-02 Cement Squeeze 1834.00 1836.50 0
2009-09-02 Cement Squeeze 1827.00 1829.00 0
2009-09-02 Cement Squeeze 1819.00 1821.00 0
2009-09-02 Cement Squeeze 1813.20 1814.20 0
2009-09-02 Cement Squeeze 1806.00 1807.20 0
2009-09-02 Cement Squeeze 1800.00 1802.00 0
2009-09-18 Perforation 1874.00 1878.00 13
2009-09-18 Perforation 1865.00 1869.00 13
2009-09-18 Perforation 1856.00 1860.00 13
1990-03-24 Cement Squeeze 1819.00 1831.50 0
2009-09-18 Perforation 1849.00 1852.00 13
2009-09-18 Perforation 1834.50 1836.00 13
2009-10-04 Cement Squeeze 1874.00 1878.00 0
2009-10-04 Cement Squeeze 1865.00 1869.00 0
2009-10-04 Cement Squeeze 1856.00 1860.00 0
2009-10-04 Cement Squeeze 1849.00 1852.00 0
2009-12-13 Cement Squeeze 1834.50 1836.00 0
2009-12-14 Perforation 1874.50 1877.50 13
2009-12-14 Perforation 1865.50 1868.50 13
2009-12-14 Perforation 1856.50 1859.50 13
1990-03-27 Perforation 1819.00 1823.50 13
2009-12-14 Perforation 1849.50 1851.50 13
2009-12-14 Perforation 1834.50 1836.00 13
2009-12-17 Acid Treatment 1856.50 1859.50 0
2009-12-17 Acid Treatment 1856.50 1859.50 0
2009-12-18 Perforation 1861.80 1862.80 20
2010-01-13 Acid Treatment 1861.80 1862.80 0
2010-01-14 Perforation 1800.00 1802.00 13
2010-01-16 Acid Treatment 1800.00 1802.00 0
2014-05-11 Perforation 1746.00 1751.00 13
2014-05-13 Acid Treatment 1746.00 1751.00 0
1990-03-27 Perforation 1827.00 1831.50 13
1990-03-27 Perforation 1834.00 1836.50 13
1990-03-28 Acid Treatment 1834.00 1836.50 0

For data sources see[4]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
1990 4431 0.0 0.0 0.0
1991 5861 0.0 0.0 0.0
1992 6421 0.0 0.0 0.0
1993 8025 0.0 0.0 0.0
1994 3478 0.0 0.0 0.0
1995 2413 0.0 0.0 0.0
1996 6105 0.0 0.0 0.0
1997 6076 0.0 0.0 0.0
1998 6110 0.0 0.0 0.0
1999 7996 0.0 0.0 0.0
2000 8292 0.0 0.0 0.0
2001 4862 0.0 0.0 0.0
2002 7322 0.0 0.0 0.0
2003 8376 0.0 0.0 0.0
2004 8317 0.0 0.0 0.0
2005 8427 0.0 0.0 0.0
2006 7433 0.0 0.0 0.0
2007 8413 0.0 0.0 0.0
2008 7597 0.0 0.0 0.0
2009 2831 0.0 0.0 0.0
2010 5166 0.0 0.0 0.0
2011 4318 0.0 0.0 0.0
2012 7071 0.0 0.0 0.0
2013 2627 0.0 0.0 0.0

For data sources see[5]

Occurences

Occurence Date Occurence Type Occurence Depth (m) Occurence Control Depth (m)
1990-01-23 Lost Circulation 1688.00 1704.00
1990-02-01 Lost Circulation 1841.80 1918.00
2014-06-24 No Incident Encountered 0.00 0.00

For data sources see[6]

References