If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.
powered by ChangeDetection
Well ID: 1086072403000 | Loading map...
{"type":"SATELLITE","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"100%","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"wmsoverlay":false,"copycoords":false,"static":false,"zoom":14,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"markercluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","enablefullscreen":false,"scrollwheelzoom":false,"locations":[{"text":"","title":"","link":"","lat":58.386183,"lon":-119.025707,"icon":""}]} |
Location: 00/03-24-108-07W6/0 | |
Location Alias: 00/03-24-08-07 W6M | |
Location Alias 2: 00/03-24-108-07 W6/00 | |
Country: Canada | |
Province: Alberta | |
Township: 108 | |
Meridian: 6 | |
Range: 07 | |
Section: 24 | |
County/Municipality: Mackenzie County | |
Well Name: CABOT ENERGY RAINBOW 3-24-108-7 | |
Operator Name: Cabot Energy Inc. | |
License Number: 0143009 | |
License Date: 1990-01-29 | |
License Status: Suspension | |
Spud Date: 1990-02-10 | |
Final Drill Date: 1990-03-13 | |
Well Total Depth: 1953.00 m | |
Surface Hole Latitude: 58.386183 | |
Surface Hole Longitude: -119.025707 |
Date | Event |
---|---|
1990-01-29 | Obtained License |
1990-02-11 | Surface Casing Operation Performed |
1990-02-13 | Kick Occurred |
1990-02-14 | Kick Occurred |
1990-02-14 | Lost Circulation Occurred |
1990-02-25 | Well Log Performed |
1990-03-03 | Well Log Performed |
1990-03-04 | Well Log Performed |
1990-03-06 | Intermediate Casing Operation Performed |
1990-03-13 | Finished Drilling |
1990-03-13 | Well Mode changed to Drilled and Cased |
1990-03-14 | Well Log Performed |
1990-03-15 | Liner Casing Operation Performed |
1990-03-17 | Rig Released |
1990-03-17 | Well Log Performed |
1990-03-27 | Perforation Treatment Performed - Jet Perforation |
1990-03-28 | Perforation Treatment Performed - Acid Squeeze - Press Used |
1990-03-30 | Perforation Treatment Performed - Acid Squeeze - Press Used |
1990-04-01 | Well Began Production |
1990-04-01 | Well Fluid changed to Crude Oil |
1990-04-01 | Well Mode changed to Flowing |
1992-11-11 | Perforation Treatment Performed - Bridge Plug Capped W/Cement |
1992-11-11 | Perforation Treatment Performed - Jet Perforation |
1992-11-11 | Well Log Performed |
1992-11-14 | Perforation Treatment Performed - Bridge Plug Capped W/Cement |
1992-11-15 | Perforation Treatment Performed - Jet Perforation |
1992-11-15 | Well Log Performed |
1992-11-16 | Perforation Treatment Performed - Acid Squeeze - Press Used |
1996-11-02 | Perforation Treatment Performed - Bridge Plug Capped W/Cement |
1996-11-02 | Plug Back Performed |
1996-11-02 | Well Fluid changed to Crude Oil |
1996-11-02 | Well Log Performed |
1996-11-02 | Well Mode changed to Abandoned Zone |
1996-11-03 | Well Fluid changed to Crude Oil |
1996-11-03 | Well Mode changed to Abandoned Zone |
2001-08-08 | Perforation Treatment Performed - Jet Perforation |
2002-03-14 | Perforation Treatment Performed - Cement Squeeze |
2002-03-14 | Plug Back Performed |
For data sources see[3]
Perforation Date | Perforation Type | Interval Top (m) | Interval Base (m) | Number of Shots |
---|---|---|---|---|
1990-03-27 | Perforation | 1899.00 | 1904.00 | 13 |
1996-11-02 | Packing Device Capped w/Cement | 1837.00 | 1845.00 | 0 |
2001-08-08 | Perforation | 602.00 | 605.00 | 17 |
2002-03-14 | Cement Squeeze | 602.00 | 605.00 | 0 |
1990-03-28 | Acid Treatment | 1899.00 | 1904.00 | 0 |
1990-03-30 | Acid Treatment | 1899.00 | 1904.00 | 0 |
1992-11-11 | Packing Device Capped w/Cement | 1894.00 | 1897.00 | 0 |
1992-11-11 | Perforation | 1885.00 | 1890.00 | 13 |
1992-11-14 | Packing Device Capped w/Cement | 1875.00 | 1883.00 | 0 |
1992-11-15 | Perforation | 1855.00 | 1859.00 | 13 |
1992-11-15 | Perforation | 1865.00 | 1869.00 | 13 |
1992-11-16 | Acid Treatment | 1855.00 | 1869.00 | 0 |
For data sources see[4]
Period | Total Production Hours | Gas Quantity (m3) | Oil Quantity (m3) | Water Quantity (m3) |
---|---|---|---|---|
1990 | 4620 | 0.0 | 0.0 | 0.0 |
1991 | 8277 | 0.0 | 0.0 | 0.0 |
1992 | 2889 | 0.0 | 0.0 | 0.0 |
1993 | 2769 | 0.0 | 0.0 | 0.0 |
1998 | 672 | 0.0 | 0.0 | 0.0 |
For data sources see[5]
Occurence Date | Occurence Type | Occurence Depth (m) | Occurence Control Depth (m) |
---|---|---|---|
1990-02-13 | Kick | 610.00 | 610.00 |
1990-02-14 | Lost Circulation | 661.00 | 1238.00 |
1990-02-14 | Kick | 661.00 | 661.00 |
For data sources see[6]