If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.
powered by ChangeDetection
Well ID: 1076093206002 | Loading map...
{"type":"SATELLITE","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"100%","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"wmsoverlay":false,"copycoords":false,"static":false,"zoom":14,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"markercluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","enablefullscreen":false,"scrollwheelzoom":false,"locations":[{"text":"","title":"","link":"","lat":58.329589,"lon":-119.469289,"icon":""}]} |
Location: 00/06-32-107-09W6/2 | |
Location Alias: 00/06-32-07-09 W6M | |
Location Alias 2: 00/06-32-107-09 W6/02 | |
Country: Canada | |
Province: Alberta | |
Township: 107 | |
Meridian: 6 | |
Range: 09 | |
Section: 32 | |
County/Municipality: Mackenzie County | |
Well Name: HUSKY RAINBOW SOUTH 11-32-107-9 | |
Operator Name: Husky Oil Operations Limited | |
License Number: 0028152 | |
License Date: 1965-04-29 | |
License Status: Abandoned | |
Spud Date: 1965-05-03 | |
Final Drill Date: 1965-07-03 | |
Well Total Depth: 2148.20 m | |
Surface Hole Latitude: 58.329589 | |
Surface Hole Longitude: -119.469289 |
Date | Event |
---|---|
1909-09-09 | Well Log Performed |
1965-04-29 | Obtained License |
1965-06-11 | Drill Stem Test Performed |
1965-06-12 | Lost Circulation Occurred |
1965-06-21 | Drill Stem Test Performed |
1965-06-22 | Drill Stem Test Performed |
1965-06-27 | Drill Stem Test Performed |
1965-06-28 | Drill Stem Test Performed |
1965-07-03 | Finished Drilling |
1965-07-03 | Well Mode changed to Drilled and Cased |
1965-07-08 | Drill Stem Test Performed |
1965-07-09 | Drill Stem Test Performed |
1965-07-10 | Drill Stem Test Performed |
1965-07-11 | Drill Stem Test Performed |
1965-07-12 | Liner Casing Operation Performed |
1965-12-08 | Perforation Treatment Performed - Bullet Perforation |
1965-12-10 | Perforation Treatment Performed - Bullet Perforation |
1965-12-11 | Perforation Treatment Performed - Acid Squeeze - Press Used |
1965-12-12 | Well Began Production |
1965-12-12 | Well Fluid changed to Crude Oil |
1965-12-12 | Well Mode changed to Flowing |
1966-12-03 | Perforation Treatment Performed - Bullet Perforation |
1966-12-17 | Perforation Treatment Performed - Acid Squeeze - Press Used |
1967-11-10 | Perforation Treatment Performed - Acid Squeeze - Press Used |
1973-01-01 | Well Fluid changed to Crude Oil |
1973-01-01 | Well Mode changed to Suspended |
1977-11-15 | Well Fluid changed to Crude Oil |
1977-11-15 | Well Mode changed to Pumping |
1982-12-01 | Well Fluid changed to Crude Oil |
1982-12-01 | Well Mode changed to Suspended |
1992-11-15 | Well Fluid changed to Crude Oil |
1992-11-15 | Well Mode changed to Pumping |
1995-07-27 | Perforation Treatment Performed - Bridge Plug Capped W/Cement |
1995-07-27 | Plug Back Performed |
1995-07-27 | Well Fluid changed to Crude Oil |
1995-07-27 | Well Mode changed to Abandoned and Whipstocked |
2016-10-16 | Well Abandoned |
For data sources see[3]
Perforation Date | Perforation Type | Interval Top (m) | Interval Base (m) | Number of Shots |
---|---|---|---|---|
1965-12-08 | Bullet Perforation | 1951.30 | 1954.40 | 3 |
1965-12-11 | Acid Treatment | 1876.00 | 1941.00 | 0 |
1966-12-03 | Bullet Perforation | 1846.80 | 1852.30 | 7 |
1966-12-03 | Bullet Perforation | 1857.10 | 1862.60 | 7 |
1966-12-17 | Acid Treatment | 1857.10 | 1941.00 | 0 |
1967-11-10 | Acid Treatment | 1951.30 | 1954.40 | 0 |
1995-07-27 | Packing Device Capped w/Cement | 1941.70 | 1944.70 | 0 |
1995-07-27 | Packing Device Capped w/Cement | 1834.00 | 1842.00 | 0 |
1965-12-10 | Bullet Perforation | 1921.20 | 1922.70 | 7 |
1965-12-10 | Bullet Perforation | 1936.70 | 1941.00 | 7 |
1965-12-10 | Bullet Perforation | 1898.60 | 1899.80 | 7 |
1965-12-10 | Bullet Perforation | 1905.30 | 1908.40 | 7 |
1965-12-10 | Bullet Perforation | 1889.50 | 1891.30 | 7 |
1965-12-10 | Bullet Perforation | 1885.50 | 1886.70 | 7 |
1965-12-10 | Bullet Perforation | 1878.20 | 1879.70 | 7 |
1965-12-10 | Bullet Perforation | 1876.00 | 1877.30 | 7 |
For data sources see[4]
Period | Total Production Hours | Gas Quantity (m3) | Oil Quantity (m3) | Water Quantity (m3) |
---|---|---|---|---|
1965 | 0 | 0.0 | 0.0 | 0.0 |
1966 | 0 | 0.0 | 0.0 | 0.0 |
1967 | 4282 | 0.0 | 0.0 | 0.0 |
1968 | 2156 | 0.0 | 0.0 | 0.0 |
1969 | 1008 | 0.0 | 0.0 | 0.0 |
1970 | 383 | 0.0 | 0.0 | 0.0 |
1971 | 48 | 0.0 | 0.0 | 0.0 |
1973 | 24 | 0.0 | 0.0 | 0.0 |
1975 | 48 | 0.0 | 0.0 | 0.0 |
1977 | 514 | 0.0 | 0.0 | 0.0 |
1978 | 3136 | 0.0 | 0.0 | 0.0 |
1979 | 5401 | 0.0 | 0.0 | 0.0 |
1980 | 3746 | 0.0 | 0.0 | 0.0 |
1981 | 24 | 0.0 | 0.0 | 0.0 |
1992 | 382 | 0.0 | 0.0 | 0.0 |
1993 | 5093 | 0.0 | 0.0 | 0.0 |
1994 | 5508 | 0.0 | 0.0 | 0.0 |
1995 | 778 | 0.0 | 0.0 | 0.0 |
For data sources see[5]
Occurence Date | Occurence Type | Occurence Depth (m) | Occurence Control Depth (m) |
---|---|---|---|
1965-06-12 | Lost Circulation | 1972.30 | 1972.30 |
For data sources see[6]