X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

1076091102000

Well Details

Well ID: 1076091102000
Loading map...
Location: 00/02-11-107-09W6/0
Location Alias: 00/02-11-07-09 W6M
Location Alias 2: 00/02-11-107-09 W6/00
Country: Canada
Province: Alberta
Township: 107
Meridian: 6
Range: 09
Section: 11
County/Municipality: Mackenzie County
Well Name: HUSKY IOE RAINS 11-2-107-9
Operator Name: Husky Oil Operations Limited
License Number: 0033315
License Date: 1967-12-19
License Status: Suspension
Spud Date: 1967-12-24
Final Drill Date: 1968-01-12
Well Total Depth: 1954.70 m
Surface Hole Latitude: 58.269107
Surface Hole Longitude: -119.378136

For data sources see[1][2]

Well History

Date Event
1909-09-09 Well Log Performed
1967-12-19 Obtained License
1968-01-12 Finished Drilling
1968-01-12 Well Mode changed to Drilled and Cased
1968-01-15 Drill Stem Test Performed
1968-01-16 Drill Stem Test Performed
1968-01-18 Production Casing Operation Performed
1968-01-29 Perforation Treatment Performed - Jet Perforation
1968-01-29 Well Began Production
1968-01-29 Well Fluid changed to Crude Oil
1968-01-29 Well Mode changed to Flowing
1970-10-01 Well Fluid changed to Crude Oil
1970-10-01 Well Mode changed to Suspended
1983-02-22 Perforation Treatment Performed - Cement Plug
1985-06-29 Perforation Treatment Performed - Jet Perforation
1985-06-29 Well Log Performed
1985-06-30 Perforation Treatment Performed - Acid Squeeze - Press Used
1985-10-01 Well Fluid changed to Crude Oil
1985-10-01 Well Mode changed to Flowing
1987-01-13 Perforation Treatment Performed - Chemical Squeeze
1987-01-15 Perforation Treatment Performed - Nitrogen Treatment
1990-04-29 Well Log Performed
1990-08-30 Well Fluid changed to Crude Oil
1990-08-30 Well Mode changed to Suspended
1990-09-01 Well Log Performed
1990-09-05 Perforation Treatment Performed - Cement Squeeze
1990-09-05 Well Fluid changed to Crude Oil
1990-09-05 Well Mode changed to Abandoned Zone
1990-09-06 Perforation Treatment Performed - Jet Perforation
1990-09-06 Well Log Performed
1990-09-09 Perforation Treatment Performed - Jet Perforation
1990-09-09 Well Log Performed
1990-09-10 Perforation Treatment Performed - Acid Squeeze - Press Used
1990-09-10 Perforation Treatment Performed - Cement Squeeze
1990-09-11 Perforation Treatment Performed - Jet Perforation
1990-09-11 Well Log Performed
1990-09-13 Perforation Treatment Performed - Acid Squeeze - Press Used
1995-10-23 Well Log Performed
1995-10-25 Well Log Performed
1995-10-26 Perforation Treatment Performed - Bridge Plug Capped W/Cement
1995-10-26 Plug Back Performed
1995-10-27 Well Log Performed
1996-06-26 Perforation Treatment Performed - Bridge Plug Capped W/Cement
1996-06-26 Perforation Treatment Performed - Cement Squeeze
1996-06-26 Perforation Treatment Performed - Jet Perforation
1996-06-26 Well Log Performed
1996-06-30 Well Log Performed
1996-07-03 Plug Back Performed
1996-07-04 Well Log Performed
1996-08-05 Well Log Performed

For data sources see[3]


Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
1968-01-29 Perforation 1918.70 1921.20 7
1990-09-10 Acid Treatment 1872.00 1873.00 0
1990-09-10 Cement Squeeze 1863.50 1873.00 0
1990-09-11 Perforation 1863.50 1867.00 14
1990-09-13 Acid Treatment 1863.50 1867.00 0
1995-10-26 Packing Device Capped w/Cement 1830.00 1838.00 0
1996-06-26 Perforation 1122.00 1122.30 99
1996-06-26 Cement Squeeze 1122.00 1122.30 0
1996-06-26 Packing Device Capped w/Cement 1106.00 1106.00 0
1983-02-22 Cement Plug 1918.70 1921.20 0
1985-06-29 Perforation 1922.70 1923.90 7
1985-06-30 Acid Treatment 1922.70 1923.90 0
1987-01-13 Chemical Squeeze 1922.70 1923.90 0
1987-01-15 Nitrogen Treatment 1922.70 1923.90 0
1990-09-05 Cement Squeeze 1922.70 1923.90 0
1990-09-06 Perforation 1863.50 1867.00 20
1990-09-09 Perforation 1872.00 1873.00 14

For data sources see[4]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
1968 1779 0.0 0.0 0.0
1969 137 0.0 0.0 0.0
1970 54 0.0 0.0 0.0
1985 373 0.0 0.0 0.0
1986 2870 0.0 0.0 0.0
1987 5178 0.0 0.0 0.0
1988 7655 0.0 0.0 0.0
1989 6389 0.0 0.0 0.0
1990 1185 0.0 0.0 0.0

For data sources see[5]

References