If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.
powered by ChangeDetection
Well ID: 1075052803000 | Loading map...
{"type":"SATELLITE","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"100%","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"wmsoverlay":false,"copycoords":false,"static":false,"zoom":14,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"markercluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","enablefullscreen":false,"scrollwheelzoom":false,"locations":[{"text":"","title":"","link":"","lat":58.315014,"lon":-114.751896,"icon":""}]} |
Location: 00/03-28-107-05W5/0 | |
Location Alias: 00/03-28-07-05 W5M | |
Location Alias 2: 00/03-28-107-05 W5/00 | |
Country: Canada | |
Province: Alberta | |
Township: 107 | |
Meridian: 5 | |
Range: 05 | |
Section: 28 | |
County/Municipality: Mackenzie County | |
Well Name: ACL HZ MIKKWA 3-28-107-5 | |
Operator Name: Paramount Resources Ltd. | |
License Number: 0429569 | |
License Date: 2011-01-07 | |
License Status: Abandoned | |
Spud Date: 2011-02-02 | |
Final Drill Date: 2011-02-15 | |
Well Total Depth: 1690.00 m | |
Surface Hole Latitude: 58.315014 | |
Surface Hole Longitude: -114.751896 |
Date | Event |
---|---|
2011-01-07 | Obtained License |
2011-02-04 | Surface Casing Operation Performed |
2011-02-05 | Direction Drilling Operation Performed - Horizontal |
2011-02-09 | Well Log Performed |
2011-02-10 | Intermediate Casing Operation Performed |
2011-02-15 | Finished Drilling |
2011-02-15 | Well Mode changed to Drilled and Cased |
2011-02-18 | Perforation Treatment Performed - Open-Hole Completion |
2011-02-19 | Rig Released |
2011-02-23 | Liner Casing Operation Performed |
2011-02-26 | Perforation Treatment Performed - Multi-Stage Fracture |
2011-03-12 | Well Began Production |
2011-03-12 | Well Fluid changed to Crude Oil |
2011-03-12 | Well Mode changed to Flowing |
2012-05-07 | Well Fluid changed to Crude Oil |
2012-05-07 | Well Mode changed to Suspended |
2015-01-17 | Well Log Performed |
2015-01-18 | Well Log Performed |
2015-01-19 | Perforation Treatment Performed - Bridge Plug Capped W/Cement |
2015-01-19 | Plug Back Performed |
2015-01-19 | Well Fluid changed to Crude Oil |
2015-01-19 | Well Log Performed |
2015-01-19 | Well Mode changed to Abandoned Zone |
2015-01-20 | Perforation Treatment Performed - Bridge Plug Capped W/Cement |
2015-01-20 | Perforation Treatment Performed - Jet Perforation |
2015-01-20 | Well Log Performed |
2015-01-21 | Perforation Treatment Performed - Acid Squeeze - Press Used |
2015-01-22 | Perforation Treatment Performed - Bridge Plug Capped W/Cement |
2015-01-22 | Well Log Performed |
2015-01-23 | Perforation Treatment Performed - Jet Perforation |
2015-01-23 | Well Log Performed |
2015-01-24 | Perforation Treatment Performed - Bridge Plug Capped W/Cement |
2015-01-26 | Perforation Treatment Performed - Acid Squeeze - Press Used |
2015-01-26 | Perforation Treatment Performed - Jet Perforation |
2015-01-26 | Well Log Performed |
2015-01-28 | Perforation Treatment Performed - Abrasa-Jet Perforation |
2015-01-29 | Perforation Treatment Performed - Acid Squeeze - Press Used |
2015-02-07 | Well Log Performed |
2015-02-25 | Perforation Treatment Performed - Cement Plug |
2015-03-01 | Well Abandoned |
2015-03-01 | Well Fluid changed to Crude Oil |
2015-03-01 | Well Mode changed to Abandoned |
For data sources see[3]
Start Date | Depth (m) | Reason |
---|---|---|
2011-02-05 | 405.00 | Horizontal |
For data sources see[4]
Perforation Date | Perforation Type | Interval Top (m) | Interval Base (m) | Number of Shots |
---|---|---|---|---|
2011-02-18 | Open Hole/Barefoot Completion | 1686.00 | 1690.00 | 0 |
2015-01-20 | Packing Device Capped w/Cement | 504.00 | 515.00 | 0 |
2015-01-20 | Perforation | 470.50 | 471.50 | 99 |
2015-01-21 | Acid Treatment | 470.50 | 471.50 | 0 |
2015-01-22 | Packing Device Capped w/Cement | 458.00 | 467.00 | 0 |
2015-01-23 | Perforation | 251.50 | 252.50 | 99 |
2015-01-24 | Packing Device Capped w/Cement | 238.00 | 248.00 | 0 |
2015-01-26 | Perforation | 183.00 | 184.00 | 99 |
2015-01-26 | Acid Treatment | 183.00 | 184.00 | 0 |
2015-01-28 | Hydra Jet Perforation | 182.00 | 182.10 | 0 |
2015-01-28 | Hydra Jet Perforation | 182.20 | 182.30 | 0 |
2011-02-26 | Multi-Stage Fracture | 1519.20 | 1519.30 | 0 |
2015-01-28 | Hydra Jet Perforation | 182.40 | 182.50 | 0 |
2015-01-28 | Hydra Jet Perforation | 182.60 | 182.70 | 0 |
2015-01-29 | Acid Treatment | 182.00 | 184.00 | 0 |
2015-02-25 | Cement Plug | 136.10 | 179.00 | 0 |
2011-02-26 | Multi-Stage Fracture | 1273.90 | 1274.00 | 0 |
2011-02-26 | Multi-Stage Fracture | 1151.80 | 1151.90 | 0 |
2011-02-26 | Multi-Stage Fracture | 1065.30 | 1065.40 | 0 |
2011-02-26 | Multi-Stage Fracture | 986.40 | 986.50 | 0 |
2011-02-26 | Multi-Stage Fracture | 906.50 | 906.60 | 0 |
2015-01-19 | Packing Device Capped w/Cement | 786.00 | 800.00 | 0 |
2015-01-20 | Perforation | 518.00 | 519.00 | 99 |
For data sources see[5]
Period | Total Production Hours | Gas Quantity (m3) | Oil Quantity (m3) | Water Quantity (m3) |
---|---|---|---|---|
2011 | 306 | 0.0 | 0.0 | 0.0 |
For data sources see[6]
Occurence Date | Occurence Type | Occurence Depth (m) | Occurence Control Depth (m) |
---|---|---|---|
2011-06-22 | No Incident Encountered | 0.00 | 0.00 |
2015-03-01 | No Incident Encountered | 0.00 | 0.00 |
For data sources see[7]