If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.
powered by ChangeDetection
Well ID: 1066083307003 | Loading map...
{"type":"SATELLITE","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"100%","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"wmsoverlay":false,"copycoords":false,"static":false,"zoom":14,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"markercluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","enablefullscreen":false,"scrollwheelzoom":false,"locations":[{"text":"","title":"","link":"","lat":58.245283,"lon":-119.253226,"icon":""}]} |
Location: 00/07-33-106-08W6/3 | |
Location Alias: 00/07-33-06-08 W6M | |
Location Alias 2: 00/07-33-106-08 W6/03 | |
Country: Canada | |
Province: Alberta | |
Township: 106 | |
Meridian: 6 | |
Range: 08 | |
Section: 33 | |
County/Municipality: Mackenzie County | |
Well Name: SLE HARO 7-33-106-8 | |
Operator Name: SanLing Energy Ltd. | |
License Number: 0266399 | |
License Date: 2002-01-23 | |
License Status: Issued | |
Spud Date: 2002-01-26 | |
Final Drill Date: 2002-01-27 | |
Well Total Depth: 2010.00 m | |
Surface Hole Latitude: 58.245283 | |
Surface Hole Longitude: -119.253226 |
Date | Event |
---|---|
2002-01-23 | Obtained License |
2002-01-27 | Finished Drilling |
2002-01-27 | Well Log Performed |
2002-01-27 | Well Mode changed to Drilled and Cased |
2002-01-28 | Production Casing Operation Performed |
2002-01-28 | Rig Released |
2002-01-31 | Perforation Treatment Performed - Jet Perforation |
2002-02-01 | Perforation Treatment Performed - Fractured |
2002-02-10 | Perforation Treatment Performed - Bridge Plug Capped W/Cement |
2002-02-10 | Perforation Treatment Performed - Jet Perforation |
2002-02-10 | Plug Back Performed |
2002-02-10 | Well Log Performed |
2002-02-13 | Perforation Treatment Performed - Acid Squeeze - Press Used |
2002-03-16 | Well Began Production |
2002-03-16 | Well Fluid changed to Gas |
2002-03-16 | Well Mode changed to Flowing |
For data sources see[3]
Perforation Date | Perforation Type | Interval Top (m) | Interval Base (m) | Number of Shots |
---|---|---|---|---|
2002-01-31 | Perforation | 551.00 | 554.00 | 13 |
2002-02-01 | Fracture | 551.00 | 554.00 | 0 |
2002-02-10 | Packing Device Capped w/Cement | 545.00 | 549.00 | 0 |
2002-02-10 | Perforation | 538.50 | 541.00 | 13 |
2002-02-13 | Acid Treatment | 538.50 | 541.00 | 0 |
For data sources see[4]
Period | Total Production Hours | Gas Quantity (m3) | Oil Quantity (m3) | Water Quantity (m3) |
---|---|---|---|---|
2002 | 5861 | 0.0 | 0.0 | 0.0 |
2003 | 5457 | 0.0 | 0.0 | 0.0 |
2004 | 7083 | 0.0 | 0.0 | 0.0 |
2005 | 7440 | 0.0 | 0.0 | 0.0 |
2006 | 8039 | 0.0 | 0.0 | 0.0 |
2007 | 7744 | 0.0 | 0.0 | 0.0 |
2008 | 7415 | 0.0 | 0.0 | 0.0 |
2009 | 5067 | 0.0 | 0.0 | 0.0 |
2010 | 6318 | 0.0 | 0.0 | 0.0 |
2011 | 6160 | 0.0 | 0.0 | 0.0 |
2012 | 6447 | 0.0 | 0.0 | 0.0 |
2013 | 5094 | 0.0 | 0.0 | 0.0 |
2014 | 4953 | 0.0 | 0.0 | 0.0 |
2015 | 5827 | 0.0 | 0.0 | 0.0 |
2016 | 6450 | 0.0 | 0.0 | 0.0 |
2017 | 6123 | 0.0 | 0.0 | 0.0 |
2018 | 4054 | 0.0 | 0.0 | 0.0 |
2019 | 8759 | 0.0 | 0.0 | 0.0 |
2020 | 2183 | 0.0 | 0.0 | 0.0 |
For data sources see[5]