X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

1066070308002

Well Details

Well ID: 1066070308002
Loading map...
Location: 00/08-03-106-07W6/2
Location Alias: 00/08-03-06-07 W6M
Location Alias 2: 00/08-03-106-07 W6/02
Country: Canada
Province: Alberta
Township: 106
Meridian: 6
Range: 07
Section: 03
County/Municipality: Mackenzie County
Well Name: PENN WEST HARO 8-3-106-7
Operator Name: Obsidian Energy Ltd.
License Number: 0193798
License Date: 1996-11-20
License Status: Abandoned
Spud Date: 1996-11-21
Final Drill Date: 1996-12-12
Well Total Depth: 2195.00 m
Surface Hole Latitude: 58.170728
Surface Hole Longitude: -119.054315

For data sources see[1][2]

Well History

Date Event
1996-11-20 Obtained License
1996-11-23 Surface Casing Operation Performed
1996-12-12 Finished Drilling
1996-12-12 Well Mode changed to Drilled and Cased
1996-12-15 Well Log Performed
1996-12-17 Production Casing Operation Performed
1996-12-17 Rig Released
1997-01-01 Well Log Performed
1997-01-03 Perforation Treatment Performed - Jet Perforation
1997-01-05 Perforation Treatment Performed - Acid Squeeze - Press Used
1997-01-06 Well Log Performed
1997-01-07 Perforation Treatment Performed - Bridge Plug Capped W/Cement
1997-01-07 Well Log Performed
1997-01-08 Perforation Treatment Performed - Jet Perforation
1997-01-09 Well Log Performed
1997-01-11 Perforation Treatment Performed - Bridge Plug Capped W/Cement
1997-01-11 Perforation Treatment Performed - Jet Perforation
1997-01-11 Well Log Performed
1997-01-14 Well Log Performed
1997-01-15 Perforation Treatment Performed - Bridge Plug Capped W/Cement
1997-01-15 Plug Back Performed
1998-02-20 Perforation Treatment Performed - Jet Perforation
1998-02-20 Well Log Performed
1998-02-21 Perforation Treatment Performed - Acid Squeeze - Press Used
1998-02-22 Well Log Performed
2010-03-22 Perforation Treatment Performed - Bridge Plug Capped W/Cement
2010-03-22 Perforation Treatment Performed - Jet Perforation
2010-03-22 Plug Back Performed
2010-03-22 Well Log Performed
2010-03-22 Well Mode changed to Abandoned Zone
2010-03-23 Perforation Treatment Performed - Cement Plug
2010-03-23 Perforation Treatment Performed - Remedial Casing
2011-02-09 Well Log Performed
2011-02-10 Perforation Treatment Performed - Jet Perforation
2011-02-10 Well Log Performed
2011-02-15 Perforation Treatment Performed - Cement Plug
2011-02-15 Perforation Treatment Performed - Remedial Casing
2011-02-19 Perforation Treatment Performed - Jet Perforation
2011-02-19 Well Log Performed
2011-03-03 Perforation Treatment Performed - Cement Plug
2011-03-03 Perforation Treatment Performed - Remedial Casing
2012-02-28 Perforation Treatment Performed - Jet Perforation
2012-02-28 Well Log Performed
2012-02-29 Perforation Treatment Performed - Cement Plug
2012-02-29 Perforation Treatment Performed - Remedial Casing
2012-03-01 Perforation Treatment Performed - Jet Perforation
2012-03-02 Perforation Treatment Performed - Cement Plug
2012-03-02 Perforation Treatment Performed - Remedial Casing
2012-03-13 Well Abandoned
2012-03-13 Well Mode changed to Abandoned

For data sources see[3]


Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
1997-01-03 Perforation 2161.00 2166.00 18
2010-03-22 Packing Device Capped w/Cement 928.00 936.00 0
2010-03-22 Perforation 603.00 608.00 13
2010-03-23 Remedial Casing Cementing 603.00 608.00 0
2010-03-23 Cement Plug 404.60 625.00 0
2011-02-10 Perforation 559.00 564.00 13
2011-02-15 Remedial Casing Cementing 559.00 564.00 0
2011-02-15 Cement Plug 475.00 580.00 0
2011-02-19 Perforation 434.00 444.00 13
2011-03-03 Remedial Casing Cementing 434.00 444.00 0
2011-03-03 Cement Plug 380.00 444.00 0
1997-01-05 Acid Treatment 2161.00 2166.00 0
2012-02-28 Perforation 345.00 350.00 13
2012-02-29 Remedial Casing Cementing 345.00 350.00 0
2012-02-29 Cement Plug 225.00 366.00 0
2012-03-01 Perforation 190.00 195.00 13
2012-03-02 Remedial Casing Cementing 190.00 195.00 0
2012-03-02 Cement Plug 65.20 221.00 0
1997-01-07 Packing Device Capped w/Cement 2147.00 2155.00 0
1997-01-08 Perforation 2135.00 2140.00 14
1997-01-11 Packing Device Capped w/Cement 2131.50 2133.50 0
1997-01-11 Perforation 2125.00 2128.00 13
1997-01-15 Packing Device Capped w/Cement 2109.00 2117.00 0
1998-02-20 Perforation 942.00 948.00 18
1998-02-21 Acid Treatment 942.00 948.00 0

For data sources see[4]



References