X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

1026022411000

Well Details

Well ID: 1026022411000
Loading map...
Location: 00/11-24-102-02W6/0
Location Alias: 00/11-24-02-02 W6M
Location Alias 2: 00/11-24-102-02 W6/00
Country: Canada
Province: Alberta
Township: 102
Meridian: 6
Range: 02
Section: 24
County/Municipality: County of Northern Lights
Well Name: CVE BOYER 11-24-102-2
Operator Name: Cenovus Energy Inc.
License Number: 0052225
License Date: 1974-12-16
License Status: RecCertified
Spud Date: 1974-12-31
Final Drill Date: 1975-01-03
Well Total Depth: 429.80 m
Surface Hole Latitude: 57.870548
Surface Hole Longitude: -118.183773

For data sources see[1][2]

Well History

Date Event
1909-09-09 Well Log Performed
1974-12-16 Obtained License
1975-01-03 Finished Drilling
1975-01-03 Production Casing Operation Performed
1975-03-19 Perforation Treatment Performed - Jet Perforation
1975-04-04 Perforation Treatment Performed - Fractured
1975-06-23 Well Mode changed to Drilled and Cased
1979-04-03 Well Began Production
1979-04-03 Well Fluid changed to Gas
1979-04-03 Well Mode changed to Flowing
1990-03-01 Well Fluid changed to Gas
1990-03-01 Well Mode changed to Suspended
1995-02-01 Well Fluid changed to Gas
1995-02-01 Well Mode changed to Flowing
1998-10-01 Well Fluid changed to Gas
1998-10-01 Well Mode changed to Suspended
2006-02-15 Well Abandoned
2007-02-11 Perforation Treatment Performed - Bridge Plug Capped W/Cement
2007-02-11 Plug Back Performed
2007-02-11 Well Fluid changed to Gas
2007-02-11 Well Mode changed to Abandoned Zone
2007-02-12 Perforation Treatment Performed - Jet Perforation
2007-02-12 Perforation Treatment Performed - Remedial Casing
2007-02-14 Perforation Treatment Performed - Cement Plug
2007-02-15 Well Fluid changed to Gas
2007-02-15 Well Mode changed to Abandoned

For data sources see[3]


Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
1975-03-19 Perforation 388.30 389.80 3
1975-03-19 Perforation 390.80 391.40 3
1975-03-19 Perforation 393.80 394.40 3
1975-04-04 Fracture 388.30 394.40 0
2007-02-11 Packing Device Capped w/Cement 370.00 378.00 0
2007-02-12 Perforation 260.00 261.00 14
2007-02-12 Remedial Casing Cementing 260.00 261.00 0
2007-02-14 Cement Plug 253.00 261.00 0

For data sources see[4]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
1979 1708 0.0 0.0 0.0
1980 3074 0.0 0.0 0.0
1981 6099 0.0 0.0 0.0
1982 5256 0.0 0.0 0.0
1983 3574 0.0 0.0 0.0
1984 3632 0.0 0.0 0.0
1985 6086 0.0 0.0 0.0
1986 4194 0.0 0.0 0.0
1987 3009 0.0 0.0 0.0
1995 665 0.0 0.0 0.0

For data sources see[5]

References