X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

1016053602002

Well Details

Well ID: 1016053602002
Loading map...
Location: 00/02-36-101-05W6/2
Location Alias: 00/02-36-01-05 W6M
Location Alias 2: 00/02-36-101-05 W6/02
Country: Canada
Province: Alberta
Township: 101
Meridian: 6
Range: 05
Section: 36
County/Municipality: County of Northern Lights
Well Name: SLE HZ HARO 2-36-101-5
Operator Name: SanLing Energy Ltd.
License Number: 0405444
License Date: 2008-12-05
License Status: Suspension
Spud Date: 2008-12-29
Final Drill Date: 2009-01-10
Well Total Depth: 1399.00 m
Surface Hole Latitude: 57.810344
Surface Hole Longitude: -118.674119

For data sources see[1][2]

Well History

Date Event
2008-12-05 Obtained License
2008-12-30 Surface Casing Operation Performed
2009-01-03 Direction Drilling Operation Performed - Horizontal
2009-01-06 Intermediate Casing Operation Performed
2009-01-06 Well Log Performed
2009-01-10 Finished Drilling
2009-01-10 Well Log Performed
2009-01-10 Well Mode changed to Drilled and Cased
2009-01-11 Well Log Performed
2009-01-12 Liner Casing Operation Performed
2009-01-12 Perforation Treatment Performed - Open-Hole Completion
2009-01-12 Perforation Treatment Performed - Slotted Liner or Casing
2009-01-13 Rig Released
2009-01-26 Perforation Treatment Performed - Fractured
2009-02-26 Well Began Production
2009-02-26 Well Fluid changed to Crude Oil
2009-02-26 Well Mode changed to Pumping
2010-02-27 Perforation Treatment Performed - Acid Squeeze - Press Used
2012-11-01 Well Fluid changed to Crude Oil
2012-11-01 Well Mode changed to Suspended

For data sources see[3]

Directional Drilling

Start Date Depth (m) Reason
2009-01-03 170.00 Horizontal

For data sources see[4]

Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
2009-01-12 Slotted Liner 702.00 1395.00 0
2009-01-12 Open Hole/Barefoot Completion 1395.00 1399.00 0
2009-01-26 Fracture 773.40 1385.70 0
2010-02-27 Acid Treatment 773.40 1385.70 0

For data sources see[5]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
2009 5934 0.0 0.0 0.0
2010 6180 0.0 0.0 0.0
2011 8671 0.0 0.0 0.0
2012 1757 0.0 0.0 0.0

For data sources see[6]

References