If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.
powered by ChangeDetection
Well ID: 100.09-33-008-28W1 | Loading map...
{"type":"SATELLITE","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"100%","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"wmsoverlay":false,"copycoords":false,"static":false,"zoom":14,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"markercluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","enablefullscreen":false,"scrollwheelzoom":false,"locations":[{"text":"","title":"","link":"","lat":49.7055429,"lon":-101.23458627,"icon":""}]} |
Well Name: Corex Daly Sinclair HZNTL | |
Country: Canada | |
Province: Manitoba | |
Township: 008 | |
Meridian: W1 | |
Range: 28 | |
Section: 33 | |
Division: Division No. 6 | |
Subdivision: Pipestone | |
Operator Name: Corex Resources Ltd. | |
License Status: Capable Of Oil Production | |
Spud Date: | |
License Date: 2010-05-18 | |
Well Total Depth: 2235.00 | |
Latitude: 49.7055429 | |
Longitude: -101.23458627 |
For data sources see[1]
Date | Event |
---|---|
2010-05-18 | Location |
2010-06-14 | Drilling Ahead |
2010-06-20 | Waiting On Service Rig |
2010-07-15 | Completing |
2010-07-21 | Capable Of Oil Production |
For data sources see[2]
Perforation Date | Perforation Type | Interval Top (m) | Interval Base (m) | Number of Shots | Shot Volume (m3) | Last Modified |
---|---|---|---|---|---|---|
2010-07-01 | HOLLOW STEEL CARRIER | 1784.00 | 1785.00 | 14 | N/A | 2010-08-16 |
2010-07-01 | HOLLOW STEEL CARRIER | 1730.31 | 1731.31 | 14 | N/A | 2010-08-16 |
2010-07-01 | HOLLOW STEEL CARRIER | 1667.07 | 1668.07 | 14 | N/A | 2010-08-16 |
2010-07-01 | HOLLOW STEEL CARRIER | 1600.23 | 1601.23 | 14 | N/A | 2010-08-16 |
2010-07-01 | HOLLOW STEEL CARRIER | 1532.53 | 1533.53 | 14 | N/A | 2010-08-16 |
2010-07-01 | HOLLOW STEEL CARRIER | 1465.41 | 1466.41 | 14 | N/A | 2010-08-16 |
2010-07-01 | HOLLOW STEEL CARRIER | 1400.27 | 1401.27 | 14 | N/A | 2010-08-16 |
2010-07-01 | HOLLOW STEEL CARRIER | 1332.98 | 1333.98 | 14 | N/A | 2010-08-16 |
2010-07-01 | HOLLOW STEEL CARRIER | 1266.58 | 1267.58 | 14 | N/A | 2010-08-16 |
2010-07-01 | HOLLOW STEEL CARRIER | 1200.18 | 1201.18 | 14 | N/A | 2010-08-16 |
2010-07-01 | HOLLOW STEEL CARRIER | 1137.52 | 1138.52 | 14 | N/A | 2010-08-16 |
2010-07-01 | HOLLOW STEEL CARRIER | 1070.27 | 1071.27 | 14 | N/A | 2010-08-16 |
For data sources see[3]
Start Date | Treatment Type | Treatment Fluid | Treatment Amount | Additive Type | Agent Type | Agent Amount |
---|---|---|---|---|---|---|
2010-07-12 | FRAC | N/A | 20/40 | SAND | 3.8 | |
2010-07-12 | FRAC | N/A | 20/40 | SAND | 3.8 | |
2010-07-12 | FRAC | N/A | 20/40 | SAND | 3.8 | |
2010-07-12 | FRAC | N/A | 20/40 | SAND | 3.8 | |
2010-07-12 | FRAC | N/A | 20/40 | SAND | 3.8 | |
2010-07-12 | FRAC | N/A | 20/40 | SAND | 3.8 | |
2010-07-12 | FRAC | N/A | 20/40 | SAND | 3.8 | |
2010-07-12 | FRAC | N/A | 20/40 | SAND | 3.8 | |
2010-07-12 | FRAC | N/A | 20/40 | SAND | 3.8 | |
2010-07-12 | FRAC | N/A | 20/40 | SAND | 3.8 |
For data sources see[4]
Period | Operator Name | Oil Quantity (m3) | Oil Production Days | GSD Quantity (m3) |
---|---|---|---|---|
2014 | Corex Resources Ltd. | 780.90 | 0 | 0.00 |
2015 | Corex Resources Ltd. | 517.00 | 0 | 0.00 |
2016 | Corex Resources Ltd. | 510.90 | 0 | 0.00 |
2017 | Corex Resources Ltd. | 469.00 | 0 | 0.00 |
2018 | Corex Resources Ltd. | 453.30 | 0 | 0.00 |
2019 | Corex Resources Ltd. | 26.90 | 0 | 0.00 |
2020 | Corex Resources Ltd. | 39.90 | 0 | 0.00 |
For data sources see[5]
Period | Operator | H2O Quantity (m3) | H20 Waste Production Days | Gas Quantity (m3) | Gas Waste Production Days | CO2 Quantity (m3) | SSW Quantity (m3) |
---|---|---|---|---|---|---|---|
2014 | Corex Resources Ltd. | 2,677.90 | 365 | 0.00 | 0 | 0.00 | 0.00 |
2015 | Corex Resources Ltd. | 1,908.50 | 310 | 0.00 | 0 | 0.00 | 0.00 |
2016 | Corex Resources Ltd. | 2,784.60 | 366 | 0.00 | 0 | 0.00 | 0.00 |
2017 | Corex Resources Ltd. | 2,505.70 | 352 | 0.00 | 0 | 0.00 | 0.00 |
2018 | Corex Resources Ltd. | 11,265.60 | 343 | 0.00 | 0 | 0.00 | 0.00 |
2019 | Corex Resources Ltd. | 535.40 | 82 | 0.00 | 0 | 0.00 | 0.00 |
2020 | Corex Resources Ltd. | 177.80 | 60 | 0.00 | 0 | 0.00 | 0.00 |
For data sources see[6]