If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.
powered by ChangeDetection
Well ID: 0976111707002 | Loading map...
{"type":"SATELLITE","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"100%","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"wmsoverlay":false,"copycoords":false,"static":false,"zoom":14,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"markercluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","enablefullscreen":false,"scrollwheelzoom":false,"locations":[{"text":"","title":"","link":"","lat":57.415261,"lon":-119.747147,"icon":""}]} |
Location: 00/07-17-097-11W6/2 | |
Location Alias: 00/07-17-97-11 W6M | |
Location Alias 2: 00/07-17-097-11 W6/02 | |
Country: Canada | |
Province: Alberta | |
Township: 097 | |
Meridian: 6 | |
Range: 11 | |
Section: 17 | |
County/Municipality: County of Northern Lights | |
Well Name: CNRL HAMBURG 7-17-97-11 | |
Operator Name: Canadian Natural Resources Limited | |
License Number: 0143069 | |
License Date: 1990-02-01 | |
License Status: Suspension | |
Spud Date: 1990-02-05 | |
Final Drill Date: 1990-03-19 | |
Well Total Depth: 2610.00 m | |
Surface Hole Latitude: 57.415261 | |
Surface Hole Longitude: -119.747147 |
Date | Event |
---|---|
1990-02-01 | Obtained License |
1990-02-05 | Lost Circulation Occurred |
1990-02-07 | Surface Casing Operation Performed |
1990-02-13 | Lost Circulation Occurred |
1990-02-20 | Intermediate Casing Operation Performed |
1990-03-14 | Kick Occurred |
1990-03-19 | Finished Drilling |
1990-03-19 | Well Log Performed |
1990-03-19 | Well Mode changed to Drilled and Cased |
1990-03-20 | Well Log Performed |
1990-03-22 | Lost Circulation Occurred |
1990-03-22 | Production Casing Operation Performed |
1990-03-22 | Rig Released |
1990-03-28 | Perforation Treatment Performed - Jet Perforation |
1990-03-29 | Perforation Treatment Performed - Acid Squeeze - Press Used |
1990-03-30 | Perforation Treatment Performed - Acid Squeeze - Press Used |
1990-12-12 | Perforation Treatment Performed - Fractured |
2005-01-14 | Well Log Performed |
2005-01-15 | Perforation Treatment Performed - Bridge Plug Capped W/Cement |
2005-01-15 | Perforation Treatment Performed - Jet Perforation |
2005-01-15 | Plug Back Performed |
2005-01-16 | Perforation Treatment Performed - Jet Perforation |
2005-01-16 | Well Log Performed |
2005-01-17 | Perforation Treatment Performed - Bridge Plug Capped W/Cement |
2005-01-17 | Perforation Treatment Performed - Remedial Casing |
2005-01-21 | Well Log Performed |
2005-01-23 | Perforation Treatment Performed - Jet Perforation |
2005-02-08 | Well Fluid changed to Gas |
2005-02-08 | Well Mode changed to Testing |
2005-02-09 | Perforation Treatment Performed - Fractured |
2005-03-18 | Well Began Production |
2005-03-18 | Well Fluid changed to Gas |
2005-03-18 | Well Mode changed to Flowing |
2012-01-01 | Well Fluid changed to Gas |
2012-01-01 | Well Mode changed to Pumping |
2017-06-30 | Well Fluid changed to Gas |
2017-06-30 | Well Mode changed to Suspended |
For data sources see[3]
Perforation Date | Perforation Type | Interval Top (m) | Interval Base (m) | Number of Shots |
---|---|---|---|---|
1990-03-28 | Perforation | 2541.00 | 2549.00 | 13 |
2005-01-23 | Perforation | 959.50 | 961.80 | 17 |
2005-02-09 | Fracture | 959.50 | 961.80 | 0 |
1990-03-29 | Acid Treatment | 2541.00 | 2549.00 | 0 |
1990-03-30 | Acid Treatment | 2541.00 | 2549.00 | 0 |
1990-12-12 | Fracture | 2541.00 | 2549.00 | 0 |
2005-01-15 | Packing Device Capped w/Cement | 2495.70 | 2504.00 | 0 |
2005-01-15 | Perforation | 1050.00 | 1051.00 | 17 |
2005-01-16 | Perforation | 800.00 | 801.00 | 17 |
2005-01-17 | Remedial Casing Cementing | 800.00 | 1051.00 | 0 |
2005-01-17 | Packing Device Capped w/Cement | 1029.90 | 1040.00 | 0 |
For data sources see[4]
Period | Total Production Hours | Gas Quantity (m3) | Oil Quantity (m3) | Water Quantity (m3) |
---|---|---|---|---|
2005 | 6747 | 0.0 | 0.0 | 0.0 |
2006 | 8609 | 0.0 | 0.0 | 0.0 |
2007 | 8486 | 0.0 | 0.0 | 0.0 |
2008 | 7958 | 0.0 | 0.0 | 0.0 |
2009 | 7710 | 0.0 | 0.0 | 0.0 |
2010 | 7774 | 0.0 | 0.0 | 0.0 |
2011 | 8364 | 0.0 | 0.0 | 0.0 |
2012 | 7713 | 0.0 | 0.0 | 0.0 |
2013 | 7800 | 0.0 | 0.0 | 0.0 |
2014 | 8592 | 0.0 | 0.0 | 0.0 |
2015 | 7488 | 0.0 | 0.0 | 0.0 |
2016 | 1392 | 0.0 | 0.0 | 0.0 |
For data sources see[5]
Occurence Date | Occurence Type | Occurence Depth (m) | Occurence Control Depth (m) |
---|---|---|---|
1990-02-05 | Lost Circulation | 120.00 | 245.00 |
1990-02-13 | Lost Circulation | 1106.00 | 1335.00 |
1990-03-14 | Kick | 2546.00 | 2546.00 |
1990-03-22 | Lost Circulation | 2610.00 | 2610.00 |
For data sources see[6]