X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0976081712000

Well Details

Well ID: 0976081712000
Loading map...
Location: 00/12-17-097-08W6/0
Location Alias: 00/12-17-97-08 W6M
Location Alias 2: 00/12-17-097-08 W6/00
Country: Canada
Province: Alberta
Township: 097
Meridian: 6
Range: 08
Section: 17
County/Municipality: County of Northern Lights
Well Name: CNRL CHNCHAGA 12-17-97-8
Operator Name: Canadian Natural Resources Limited
License Number: 0143669
License Date: 1990-03-09
License Status: Abandoned
Spud Date: 1990-03-12
Final Drill Date: 1990-04-07
Well Total Depth: 2455.00 m
Surface Hole Latitude: 57.419632
Surface Hole Longitude: -119.273256

For data sources see[1][2]

Well History

Date Event
1990-03-09 Obtained License
1990-03-14 Surface Casing Operation Performed
1990-03-18 Drill Stem Test Performed
1990-04-07 Finished Drilling
1990-04-08 Well Log Performed
1990-04-09 Well Log Performed
1990-04-11 Drill Stem Test Performed
1990-04-14 Production Casing Operation Performed
1990-04-15 Rig Released
1990-06-21 Well Log Performed
1990-06-22 Well Log Performed
1990-06-23 Perforation Treatment Performed - Jet Perforation
1990-06-25 Perforation Treatment Performed - Acid Squeeze - Press Used
1990-06-27 Well Log Performed
1990-06-28 Perforation Treatment Performed - Acid Squeeze - Press Used
1990-06-28 Perforation Treatment Performed - Bridge Plug Capped W/Cement
1990-06-28 Perforation Treatment Performed - Jet Perforation
1990-06-28 Plug Back Performed
1990-07-06 Well Log Performed
1990-07-07 Perforation Treatment Performed - Bridge Plug Capped W/Cement
1990-07-07 Perforation Treatment Performed - Jet Perforation
1990-07-07 Plug Back Performed
1990-07-08 Perforation Treatment Performed - Acid Squeeze - Press Used
1990-07-08 Perforation Treatment Performed - Cement Squeeze
1990-07-10 Well Log Performed
1990-07-11 Perforation Treatment Performed - Acid Squeeze - Press Used
1990-07-13 Well Log Performed
1990-07-14 Perforation Treatment Performed - Acid Squeeze - Press Used
1990-07-14 Perforation Treatment Performed - Jet Perforation
1990-07-15 Perforation Treatment Performed - Cement Squeeze
1990-07-17 Well Log Performed
1990-07-18 Perforation Treatment Performed - Jet Perforation
1990-07-29 Well Log Performed
1990-08-15 Perforation Treatment Performed - Acid Squeeze - Press Used
1990-08-15 Well Log Performed
1990-08-17 Perforation Treatment Performed - Cement Squeeze
1990-08-22 Perforation Treatment Performed - Jet Perforation
1990-08-23 Perforation Treatment Performed - Acid Squeeze - Press Used
1990-08-29 Perforation Treatment Performed - Fractured
1990-09-02 Well Mode changed to Drilled and Cased
1995-02-17 Well Began Production
1995-02-17 Well Fluid changed to Gas
1995-02-17 Well Mode changed to Flowing
1998-10-31 Well Fluid changed to Gas
1998-10-31 Well Mode changed to Suspended
1998-12-04 Well Fluid changed to Gas
1998-12-04 Well Mode changed to Flowing
2004-05-01 Well Fluid changed to Gas
2004-05-01 Well Mode changed to Pumping
2018-09-30 Well Fluid changed to Gas
2018-09-30 Well Mode changed to Suspended
2020-01-30 Perforation Treatment Performed - Bridge Plug Capped W/Cement
2020-01-30 Plug Back Performed
2020-01-30 Well Fluid changed to Gas
2020-01-30 Well Mode changed to Abandoned Zone
2020-02-20 Perforation Treatment Performed - Jet Perforation
2020-02-20 Well Log Performed
2020-02-29 Perforation Treatment Performed - Bridge Plug Capped W/Cement
2020-02-29 Perforation Treatment Performed - Remedial Casing
2020-03-15 Well Abandoned
2020-03-15 Well Fluid changed to Gas
2020-03-15 Well Mode changed to Abandoned

For data sources see[3]


Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
1990-06-23 Perforation 2402.50 2410.00 13
1990-07-08 Cement Squeeze 878.50 879.50 0
1990-07-11 Acid Treatment 843.00 844.00 0
1990-07-14 Perforation 842.50 844.50 6
1990-07-14 Acid Treatment 842.50 844.50 0
1990-07-15 Cement Squeeze 842.50 844.50 0
1990-07-18 Perforation 851.50 859.50 13
1990-07-18 Perforation 867.00 873.50 13
1990-08-15 Acid Treatment 851.50 873.50 0
1990-08-17 Cement Squeeze 851.50 873.50 0
1990-08-22 Perforation 855.00 859.50 13
1990-06-25 Acid Treatment 2402.50 2410.00 0
1990-08-23 Acid Treatment 855.00 859.50 0
1990-08-29 Fracture 855.00 859.50 0
2020-01-30 Packing Device Capped w/Cement 827.00 835.00 0
2020-02-20 Perforation 550.00 551.00 17
2020-02-29 Remedial Casing Cementing 550.00 551.00 0
2020-02-29 Packing Device Capped w/Cement 524.80 540.00 0
1990-06-28 Packing Device Capped w/Cement 2384.00 2392.00 0
1990-06-28 Perforation 1594.00 1610.00 13
1990-06-28 Acid Treatment 1594.00 1610.00 0
1990-07-07 Packing Device Capped w/Cement 1580.00 1588.00 0
1990-07-07 Perforation 843.00 844.00 13
1990-07-07 Perforation 878.50 879.50 13
1990-07-08 Acid Treatment 843.00 879.50 0

For data sources see[4]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
1995 7219 0.0 0.0 0.0
1996 8186 0.0 0.0 0.0
1997 4051 0.0 0.0 0.0
1998 1090 0.0 0.0 0.0
1999 5165 0.0 0.0 0.0
2000 7920 0.0 0.0 0.0
2001 8474 0.0 0.0 0.0
2002 8364 0.0 0.0 0.0
2003 8385 0.0 0.0 0.0
2004 5783 0.0 0.0 0.0
2005 8570 0.0 0.0 0.0
2006 7438 0.0 0.0 0.0
2007 8610 0.0 0.0 0.0
2008 8031 0.0 0.0 0.0
2009 8543 0.0 0.0 0.0
2010 8486 0.0 0.0 0.0
2011 8209 0.0 0.0 0.0
2012 8687 0.0 0.0 0.0
2013 8567 0.0 0.0 0.0
2014 8667 0.0 0.0 0.0
2015 7967 0.0 0.0 0.0
2016 8496 0.0 0.0 0.0
2017 4913 0.0 0.0 0.0
2018 552 0.0 0.0 0.0

For data sources see[5]

Occurences

Occurence Date Occurence Type Occurence Depth (m) Occurence Control Depth (m)
2020-03-15 No Incident Encountered 0.00 0.00

For data sources see[6]

References