X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0966051006000

Well Details

Well ID: 0966051006000
Loading map...
Location: 00/06-10-096-05W6/0
Location Alias: 00/06-10-96-05 W6M
Location Alias 2: 00/06-10-096-05 W6/00
Country: Canada
Province: Alberta
Township: 096
Meridian: 6
Range: 05
Section: 10
County/Municipality: Clear Hills County
Well Name: AMOCO CRANBERRY 6-10-96-5
Operator Name: BP Canada Energy Group ULC
License Number: 0071775
License Date: 1978-09-05
License Status: RecCertified
Spud Date: 1978-09-16
Final Drill Date: 1978-10-18
Well Total Depth: 2493.00 m
Surface Hole Latitude: 57.312403
Surface Hole Longitude: -118.723794

For data sources see[1][2]

Well History

Date Event
1909-09-09 Well Log Performed
1978-09-05 Obtained License
1978-10-16 Drill Stem Test Performed
1978-10-18 Finished Drilling
1978-10-20 Drill Stem Test Performed
1978-10-24 Production Casing Operation Performed
1978-10-24 Well Mode changed to Drilled and Cased
1978-12-11 Perforation Treatment Performed - Jet Perforation
1978-12-16 Perforation Treatment Performed - Jet Perforation
1978-12-17 Perforation Treatment Performed - Acid Squeeze - Press Used
1978-12-20 Perforation Treatment Performed - Fractured
1980-09-29 Well Began Production
1980-09-29 Well Fluid changed to Gas
1980-09-29 Well Mode changed to Flowing
1988-10-26 Well Fluid changed to Gas
1988-10-26 Well Mode changed to Suspended
1996-09-24 Well Log Performed
1996-09-26 Perforation Treatment Performed - Bridge Plug Capped W/Cement
1996-09-26 Plug Back Performed
1996-09-26 Well Fluid changed to Gas
1996-09-26 Well Mode changed to Abandoned Zone
1996-09-29 Perforation Treatment Performed - Jet Perforation
1996-09-29 Perforation Treatment Performed - Remedial Casing
1996-10-01 Well Abandoned
1996-10-01 Well Fluid changed to Gas
1996-10-01 Well Mode changed to Abandoned

For data sources see[3]


Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
1978-12-11 Perforation 2367.00 2368.00 13
1978-12-16 Perforation 2411.00 2412.00 7
1978-12-16 Perforation 2414.20 2415.00 7
1978-12-16 Perforation 2416.50 2419.50 7
1978-12-17 Acid Treatment 2411.00 2419.50 0
1978-12-20 Fracture 2411.00 2419.50 0
1996-09-26 Packing Device Capped w/Cement 2298.00 2365.00 0
1996-09-29 Perforation 351.00 352.00 14
1996-09-29 Remedial Casing Cementing 351.00 352.00 0

For data sources see[4]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
1980 1198 0.0 0.0 0.0
1981 4695 0.0 0.0 0.0
1982 1849 0.0 0.0 0.0
1983 2078 0.0 0.0 0.0
1984 132 0.0 0.0 0.0

For data sources see[5]

References