If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.
powered by ChangeDetection
| Well ID: 0956052503000 | Loading map...
{"type":"SATELLITE","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"100%","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"wmsoverlay":false,"copycoords":false,"static":false,"zoom":14,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"markercluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","enablefullscreen":false,"scrollwheelzoom":false,"locations":[{"text":"","title":"","link":"","lat":57.268191,"lon":-118.670094,"icon":""}]} |
| Location: 00/03-25-095-05W6/0 | |
| Location Alias: 00/03-25-95-05 W6M | |
| Location Alias 2: 00/03-25-095-05 W6/00 | |
| Country: Canada | |
| Province: Alberta | |
| Township: 095 | |
| Meridian: 6 | |
| Range: 05 | |
| Section: 25 | |
| County/Municipality: Clear Hills County | |
| Well Name: ACL CRAN 3-25-95-5 | |
| Operator Name: Canadian Natural Resources Limited | |
| License Number: 0080305 | |
| License Date: 1980-01-08 | |
| License Status: Abandoned | |
| Spud Date: 1980-01-15 | |
| Final Drill Date: 1980-02-11 | |
| Well Total Depth: 2430.00 m | |
| Surface Hole Latitude: 57.268191 | |
| Surface Hole Longitude: -118.670094 |
| Date | Event |
|---|---|
| 1909-09-09 | Well Log Performed |
| 1980-01-08 | Obtained License |
| 1980-02-11 | Finished Drilling |
| 1980-02-11 | Well Mode changed to Drilled and Cased |
| 1980-02-13 | Drill Stem Test Performed |
| 1980-02-15 | Drill Stem Test Performed |
| 1980-02-17 | Production Casing Operation Performed |
| 1980-03-01 | Perforation Treatment Performed - Jet Perforation |
| 1980-03-03 | Perforation Treatment Performed - Acid Squeeze - Press Used |
| 1981-08-02 | Well Began Production |
| 1981-08-02 | Well Fluid changed to Gas |
| 1981-08-02 | Well Mode changed to Flowing |
| 1984-06-28 | Well Log Performed |
| 1986-06-16 | Perforation Treatment Performed - Fractured |
| 1986-10-28 | Well Log Performed |
| 1986-10-29 | Perforation Treatment Performed - Jet Perforation |
| 1986-10-29 | Well Log Performed |
| 1991-07-02 | Perforation Treatment Performed - Jet Perforation |
| 1991-07-03 | Perforation Treatment Performed - Chemical Squeeze |
| 1991-07-05 | Perforation Treatment Performed - Acid Squeeze - Press Used |
| 1992-01-22 | Well Log Performed |
| 1992-04-12 | Perforation Treatment Performed - Jet Perforation |
| 1992-04-15 | Perforation Treatment Performed - Acid Squeeze - Press Used |
| 1992-04-18 | Well Log Performed |
| 1996-09-22 | Perforation Treatment Performed - Bridge Plug Capped W/Cement |
| 1996-09-22 | Plug Back Performed |
| 1996-09-23 | Well Log Performed |
| 1996-09-24 | Perforation Treatment Performed - Jet Perforation |
| 1996-09-24 | Well Log Performed |
| 1996-09-26 | Perforation Treatment Performed - Remedial Casing |
| 1996-09-29 | Perforation Treatment Performed - Jet Perforation |
| 1996-09-29 | Perforation Treatment Performed - Remedial Casing |
| 1996-10-02 | Perforation Treatment Performed - Jet Perforation |
| 1996-10-02 | Perforation Treatment Performed - Remedial Casing |
| 1996-10-02 | Well Log Performed |
| 1996-10-04 | Well Abandoned |
| 1996-10-04 | Well Fluid changed to Gas |
| 1996-10-04 | Well Mode changed to Abandoned |
For data sources see[3]
| Perforation Date | Perforation Type | Interval Top (m) | Interval Base (m) | Number of Shots |
|---|---|---|---|---|
| 1980-03-01 | Perforation | 2262.00 | 2268.00 | 7 |
| 1991-07-03 | Chemical Squeeze | 2262.00 | 2293.50 | 0 |
| 1991-07-05 | Acid Treatment | 2262.00 | 2293.50 | 0 |
| 1992-04-12 | Perforation | 2327.00 | 2329.50 | 13 |
| 1992-04-12 | Perforation | 2333.50 | 2336.00 | 13 |
| 1992-04-12 | Perforation | 2336.50 | 2339.50 | 13 |
| 1992-04-15 | Acid Treatment | 2327.00 | 2339.50 | 0 |
| 1996-09-22 | Packing Device Capped w/Cement | 2292.50 | 2300.50 | 0 |
| 1996-09-22 | Packing Device Capped w/Cement | 2244.00 | 2252.00 | 0 |
| 1996-09-24 | Perforation | 585.00 | 586.00 | 13 |
| 1996-09-26 | Remedial Casing Cementing | 585.00 | 586.00 | 0 |
| 1980-03-01 | Perforation | 2276.00 | 2277.00 | 7 |
| 1996-09-29 | Perforation | 395.00 | 396.00 | 14 |
| 1996-09-29 | Remedial Casing Cementing | 395.00 | 396.00 | 0 |
| 1996-10-02 | Perforation | 285.00 | 286.00 | 14 |
| 1996-10-02 | Remedial Casing Cementing | 285.00 | 286.00 | 0 |
| 1980-03-03 | Acid Treatment | 2262.00 | 2277.00 | 0 |
| 1986-06-16 | Fracture | 2262.00 | 2277.00 | 0 |
| 1986-10-29 | Perforation | 2276.00 | 2277.00 | 14 |
| 1991-07-02 | Perforation | 2276.00 | 2277.00 | 13 |
| 1991-07-02 | Perforation | 2282.00 | 2284.00 | 13 |
| 1991-07-02 | Perforation | 2286.00 | 2288.00 | 13 |
| 1991-07-02 | Perforation | 2290.00 | 2293.50 | 13 |
For data sources see[4]
| Period | Total Production Hours | Gas Quantity (m3) | Oil Quantity (m3) | Water Quantity (m3) |
|---|---|---|---|---|
| 1981 | 3068 | 0.0 | 0.0 | 0.0 |
| 1982 | 6684 | 0.0 | 0.0 | 0.0 |
| 1983 | 6108 | 0.0 | 0.0 | 0.0 |
| 1984 | 7454 | 0.0 | 0.0 | 0.0 |
| 1985 | 7934 | 0.0 | 0.0 | 0.0 |
| 1986 | 7681 | 0.0 | 0.0 | 0.0 |
| 1987 | 8208 | 0.0 | 0.0 | 0.0 |
| 1988 | 6621 | 0.0 | 0.0 | 0.0 |
| 1989 | 7799 | 0.0 | 0.0 | 0.0 |
| 1990 | 8158 | 0.0 | 0.0 | 0.0 |
| 1991 | 5469 | 0.0 | 0.0 | 0.0 |
| 1992 | 1784 | 0.0 | 0.0 | 0.0 |
For data sources see[5]