X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0956042108000

Well Details

Well ID: 0956042108000
Loading map...
Location: 00/08-21-095-04W6/0
Location Alias: 00/08-21-95-04 W6M
Location Alias 2: 00/08-21-095-04 W6/00
Country: Canada
Province: Alberta
Township: 095
Meridian: 6
Range: 04
Section: 21
County/Municipality: Clear Hills County
Well Name: ACL CRAN 8-21-95-4
Operator Name: Canadian Natural Resources Limited
License Number: 0163676
License Date: 1994-01-05
License Status: Abandoned
Spud Date: 1994-02-02
Final Drill Date: 1994-02-05
Well Total Depth: 816.00 m
Surface Hole Latitude: 57.254131
Surface Hole Longitude: -118.571964

For data sources see[1][2]

Well History

Date Event
1994-01-05 Obtained License
1994-02-02 Lost Circulation Occurred
1994-02-02 Surface Casing Operation Performed
1994-02-05 Finished Drilling
1994-02-05 Lost Circulation Occurred
1994-02-05 Production Casing Operation Performed
1994-02-05 Well Mode changed to Drilled and Cased
1994-02-06 Rig Released
1994-02-09 Well Log Performed
1994-12-22 Well Began Production
1994-12-22 Well Fluid changed to Gas
1994-12-22 Well Mode changed to Flowing
1996-12-06 Well Fluid changed to Gas
1996-12-06 Well Mode changed to Closed
1997-01-06 Well Fluid changed to Gas
1997-01-06 Well Mode changed to Flowing
1997-04-03 Perforation Treatment Performed - Jet Perforation
1997-04-04 Perforation Treatment Performed - Acid Squeeze - Press Used
2007-12-20 Well Fluid changed to Gas
2007-12-20 Well Mode changed to Suspended
2014-01-30 Perforation Treatment Performed - Bridge Plug Capped W/Cement
2014-01-30 Plug Back Performed
2014-01-30 Well Fluid changed to Gas
2014-01-30 Well Mode changed to Abandoned Zone
2014-02-02 Perforation Treatment Performed - Jet Perforation
2014-02-03 Perforation Treatment Performed - Bridge Plug Capped W/Cement
2014-02-03 Perforation Treatment Performed - Jet Perforation
2014-02-03 Perforation Treatment Performed - Remedial Casing
2014-02-03 Well Log Performed
2014-02-04 Perforation Treatment Performed - Bridge Plug Capped W/Cement
2014-02-04 Perforation Treatment Performed - Remedial Casing
2014-03-11 Well Abandoned
2014-03-11 Well Fluid changed to Gas
2014-03-11 Well Mode changed to Abandoned

For data sources see[3]


Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
1997-04-03 Perforation 813.20 815.20 13
1997-04-04 Acid Treatment 813.20 815.20 0
2014-01-30 Packing Device Capped w/Cement 794.30 802.50 0
2014-02-02 Perforation 321.00 324.00 17
2014-02-03 Remedial Casing Cementing 321.00 324.00 0
2014-02-03 Packing Device Capped w/Cement 284.80 315.00 0
2014-02-03 Perforation 230.00 233.00 17
2014-02-04 Remedial Casing Cementing 230.00 233.00 0
2014-02-04 Packing Device Capped w/Cement 186.80 220.00 0

For data sources see[4]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
1994 237 0.0 0.0 0.0
1995 8131 0.0 0.0 0.0
1996 8121 0.0 0.0 0.0
1997 8530 0.0 0.0 0.0
1998 8544 0.0 0.0 0.0
1999 8736 0.0 0.0 0.0
2000 8526 0.0 0.0 0.0
2001 8759 0.0 0.0 0.0
2002 8759 0.0 0.0 0.0
2003 6551 0.0 0.0 0.0

For data sources see[5]

Occurences

Occurence Date Occurence Type Occurence Depth (m) Occurence Control Depth (m)
1994-02-02 Lost Circulation 47.00 88.00
1994-02-05 Lost Circulation 816.00 816.00
2014-03-11 No Incident Encountered 0.00 0.00

For data sources see[6]

References