X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0956041506000

Well Details

Well ID: 0956041506000
Loading map...
Location: 00/06-15-095-04W6/0
Location Alias: 00/06-15-95-04 W6M
Location Alias 2: 00/06-15-095-04 W6/00
Country: Canada
Province: Alberta
Township: 095
Meridian: 6
Range: 04
Section: 15
County/Municipality: Clear Hills County
Well Name: ACL CRAN 6-15-95-4
Operator Name: Canadian Natural Resources Limited
License Number: 0080513
License Date: 1980-01-18
License Status: Suspension
Spud Date: 1980-02-03
Final Drill Date: 1980-02-11
Well Total Depth: 912.00 m
Surface Hole Latitude: 57.240134
Surface Hole Longitude: -118.556996

For data sources see[1][2]

Well History

Date Event
1909-09-09 Well Log Performed
1980-01-18 Obtained License
1980-02-11 Finished Drilling
1980-02-14 Production Casing Operation Performed
1980-03-06 Perforation Treatment Performed - Jet Perforation
1980-03-09 Perforation Treatment Performed - Jet Perforation
1980-03-12 Perforation Treatment Performed - Jet Perforation
1980-03-13 Perforation Treatment Performed - Cement Squeeze
1980-03-14 Perforation Treatment Performed - Jet Perforation
1980-03-16 Well Mode changed to Drilled and Cased
1995-01-12 Well Began Production
1995-01-12 Well Fluid changed to Gas
1995-01-12 Well Mode changed to Flowing
1996-12-06 Well Fluid changed to Gas
1996-12-06 Well Mode changed to Closed
1997-01-06 Well Fluid changed to Gas
1997-01-06 Well Mode changed to Flowing
2007-12-20 Well Fluid changed to Gas
2007-12-20 Well Mode changed to Suspended
2014-01-22 Well Log Performed
2014-01-23 Well Log Performed
2014-01-24 Perforation Treatment Performed - Bridge Plug Capped W/Cement
2014-01-24 Perforation Treatment Performed - Jet Perforation
2014-01-24 Plug Back Performed
2014-01-24 Well Fluid changed to Gas
2014-01-24 Well Log Performed
2014-01-24 Well Mode changed to Abandoned Zone
2014-01-25 Perforation Treatment Performed - Bridge Plug Capped W/Cement
2014-01-25 Perforation Treatment Performed - Remedial Casing
2014-01-26 Perforation Treatment Performed - Jet Perforation
2014-01-26 Well Log Performed
2014-01-28 Perforation Treatment Performed - Bridge Plug Capped W/Cement
2014-01-28 Perforation Treatment Performed - Remedial Casing

For data sources see[3]


Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
1980-03-06 Perforation 826.50 830.00 13
2014-01-25 Remedial Casing Cementing 555.00 558.00 0
2014-01-25 Packing Device Capped w/Cement 517.00 547.00 0
2014-01-26 Perforation 330.00 332.00 17
2014-01-28 Remedial Casing Cementing 330.00 332.00 0
2014-01-28 Packing Device Capped w/Cement 294.70 325.00 0
1980-03-09 Perforation 817.00 820.00 13
1980-03-12 Perforation 814.00 815.00 13
1980-03-13 Cement Squeeze 814.00 830.00 0
1980-03-14 Perforation 808.00 810.00 13
1980-03-14 Perforation 811.50 813.00 13
2014-01-24 Packing Device Capped w/Cement 778.90 793.90 0
2014-01-24 Packing Device Capped w/Cement 631.50 639.50 0
2014-01-24 Perforation 555.00 558.00 17

For data sources see[4]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
1995 7285 0.0 0.0 0.0
1996 8063 0.0 0.0 0.0
1997 8264 0.0 0.0 0.0
1998 8338 0.0 0.0 0.0
1999 8504 0.0 0.0 0.0
2000 8481 0.0 0.0 0.0
2001 8727 0.0 0.0 0.0
2002 7321 0.0 0.0 0.0
2003 1416 0.0 0.0 0.0

For data sources see[5]

Occurences

Occurence Date Occurence Type Occurence Depth (m) Occurence Control Depth (m)
2014-02-05 No Incident Encountered 0.00 0.00

For data sources see[6]

References