X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0936051113000

Well Details

Well ID: 0936051113000
Loading map...
Location: 00/13-11-093-05W6/0
Location Alias: 00/13-11-93-05 W6M
Location Alias 2: 00/13-11-093-05 W6/00
Country: Canada
Province: Alberta
Township: 093
Meridian: 6
Range: 05
Section: 11
County/Municipality: Clear Hills County
Well Name: ECA ECOG EOG ALLEMAN 13-11-93-5
Operator Name: Cenovus Energy Inc.
License Number: 0321662
License Date: 2004-12-14
License Status: RecCertified
Spud Date: 2004-12-30
Final Drill Date: 2005-01-17
Well Total Depth: 2284.00 m
Surface Hole Latitude: 57.057385
Surface Hole Longitude: -118.697992

For data sources see[1][2]

Well History

Date Event
2004-12-14 Obtained License
2005-01-01 Surface Casing Operation Performed
2005-01-03 Lost Circulation Occurred
2005-01-11 Well Log Performed
2005-01-13 Intermediate Casing Operation Performed
2005-01-17 Finished Drilling
2005-01-18 Well Log Performed
2005-01-19 Plug Back Performed
2005-01-19 Well Mode changed to Abandoned and Whipstocked
2005-01-31 Rig Released
2005-01-31 Well Log Performed
2012-02-25 Perforation Treatment Performed - Jet Perforation
2012-02-26 Perforation Treatment Performed - Chemical Squeeze
2012-02-27 Perforation Treatment Performed - Cement Plug
2012-02-27 Perforation Treatment Performed - Cement Squeeze
2012-02-27 Plug Back Performed
2012-03-07 Perforation Treatment Performed - Jet Perforation
2012-03-08 Perforation Treatment Performed - Chemical Squeeze
2012-03-09 Perforation Treatment Performed - Cement Plug
2012-03-09 Perforation Treatment Performed - Cement Squeeze
2012-03-09 Plug Back Performed
2013-02-08 Perforation Treatment Performed - Jet Perforation
2013-02-08 Well Log Performed
2013-02-24 Perforation Treatment Performed - Acid Squeeze - Press Used
2013-02-26 Perforation Treatment Performed - Acid Squeeze - Press Used
2013-03-01 Perforation Treatment Performed - Cement Plug
2013-03-01 Perforation Treatment Performed - Remedial Casing
2013-03-14 Perforation Treatment Performed - Jet Perforation
2013-03-14 Well Log Performed
2013-03-15 Perforation Treatment Performed - Acid Squeeze - Press Used
2013-03-17 Perforation Treatment Performed - Cement Plug
2013-03-17 Perforation Treatment Performed - Remedial Casing
2014-01-28 Perforation Treatment Performed - Abrasa-Jet Perforation
2014-01-30 Perforation Treatment Performed - Acid Squeeze - Press Used
2014-02-12 Perforation Treatment Performed - Cement Plug
2014-02-12 Perforation Treatment Performed - Remedial Casing
2014-02-23 Perforation Treatment Performed - Abrasa-Jet Perforation
2014-02-25 Perforation Treatment Performed - Acid Squeeze - Press Used
2014-02-28 Perforation Treatment Performed - Cement Plug
2014-02-28 Perforation Treatment Performed - Remedial Casing
2014-03-06 Perforation Treatment Performed - Abrasa-Jet Perforation
2014-03-08 Perforation Treatment Performed - Acid Squeeze - Press Used
2014-03-13 Perforation Treatment Performed - Abrasa-Jet Perforation
2014-03-15 Perforation Treatment Performed - Acid Squeeze - Press Used
2014-03-16 Intermediate Casing Operation Performed
2014-03-16 Perforation Treatment Performed - Cement Plug
2014-03-16 Perforation Treatment Performed - Remedial Casing
2015-01-11 Well Abandoned

For data sources see[3]


Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
2012-02-25 Perforation 958.00 960.00 39
2012-03-09 Cement Plug 817.00 872.20 0
2013-02-08 Perforation 796.50 799.50 17
2013-02-24 Acid Treatment 796.50 799.50 0
2013-02-26 Acid Treatment 796.50 799.50 0
2013-03-01 Remedial Casing Cementing 796.50 799.50 0
2013-03-01 Cement Plug 780.00 799.50 0
2013-03-14 Perforation 538.00 542.00 17
2013-03-15 Acid Treatment 538.00 542.00 0
2013-03-17 Remedial Casing Cementing 538.00 542.00 0
2013-03-17 Cement Plug 526.10 542.00 0
2012-02-25 Perforation 959.00 961.00 26
2014-01-28 Hydra Jet Perforation 416.50 418.50 0
2014-01-30 Acid Treatment 416.50 418.50 0
2014-02-12 Remedial Casing Cementing 416.50 418.50 0
2014-02-12 Cement Plug 398.00 418.50 0
2014-02-23 Hydra Jet Perforation 381.00 383.00 0
2014-02-25 Acid Treatment 381.00 383.00 0
2014-02-28 Remedial Casing Cementing 381.00 383.00 0
2014-02-28 Cement Plug 369.00 383.00 0
2014-03-06 Hydra Jet Perforation 359.00 361.00 0
2014-03-08 Acid Treatment 359.00 361.00 0
2012-02-26 Chemical Squeeze 958.00 961.00 0
2014-03-13 Hydra Jet Perforation 357.00 359.00 0
2014-03-15 Acid Treatment 357.00 361.00 0
2014-03-16 Remedial Casing Cementing 357.00 361.00 0
2014-03-16 Cement Plug 342.50 361.00 0
2012-02-27 Cement Squeeze 958.00 961.00 0
2012-02-27 Cement Plug 920.10 980.00 0
2012-03-07 Perforation 862.50 864.50 39
2012-03-07 Perforation 862.50 864.50 26
2012-03-08 Chemical Squeeze 862.50 864.50 0
2012-03-09 Cement Squeeze 862.50 864.50 0

For data sources see[4]


Occurences

Occurence Date Occurence Type Occurence Depth (m) Occurence Control Depth (m)
2005-01-03 Lost Circulation 877.00 1059.00
2013-01-25 No Incident Encountered 0.00 0.00
2014-09-30 No Incident Encountered 0.00 0.00

For data sources see[5]

References