X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0936051013002

Well Details

Well ID: 0936051013002
Loading map...
Location: 00/13-10-093-05W6/2
Location Alias: 00/13-10-93-05 W6M
Location Alias 2: 00/13-10-093-05 W6/02
Country: Canada
Province: Alberta
Township: 093
Meridian: 6
Range: 05
Section: 10
County/Municipality: Clear Hills County
Well Name: CVE 13-10-93-5
Operator Name: Cenovus Energy Inc.
License Number: 0304353
License Date: 2004-02-18
License Status: RecCertified
Spud Date: 2004-03-05
Final Drill Date: 2004-03-17
Well Total Depth: 2320.00 m
Surface Hole Latitude: 57.057304
Surface Hole Longitude: -118.720622

For data sources see[1][2]

Well History

Date Event
2004-02-18 Obtained License
2004-03-06 Surface Casing Operation Performed
2004-03-14 Well Log Performed
2004-03-16 Intermediate Casing Operation Performed
2004-03-17 Finished Drilling
2004-03-17 Perforation Treatment Performed - Open-Hole Completion
2004-03-17 Well Mode changed to Drilled and Cased
2004-03-18 Well Log Performed
2004-03-19 Rig Released
2004-03-28 Perforation Treatment Performed - Acid Squeeze - Press Used
2004-03-29 Perforation Treatment Performed - Bridge Plug Capped W/Cement
2004-03-29 Plug Back Performed
2004-03-29 Well Log Performed
2004-03-30 Perforation Treatment Performed - Jet Perforation
2004-03-30 Well Log Performed
2012-02-24 Perforation Treatment Performed - Jet Perforation
2012-03-14 Perforation Treatment Performed - Bridge Plug Capped W/Cement
2012-03-14 Perforation Treatment Performed - Cement Squeeze
2012-03-14 Plug Back Performed
2012-03-14 Well Mode changed to Abandoned Zone
2013-02-08 Perforation Treatment Performed - Jet Perforation
2013-02-08 Well Log Performed
2013-03-05 Perforation Treatment Performed - Bridge Plug Capped W/Cement
2013-03-05 Perforation Treatment Performed - Cement Squeeze
2013-03-05 Plug Back Performed
2013-03-11 Perforation Treatment Performed - Jet Perforation
2013-03-11 Well Log Performed
2013-03-12 Perforation Treatment Performed - Acid Squeeze - Press Used
2013-03-13 Perforation Treatment Performed - Bridge Plug Capped W/Cement
2013-03-13 Perforation Treatment Performed - Cement Squeeze
2013-03-13 Plug Back Performed
2014-01-08 Perforation Treatment Performed - Abrasa-Jet Perforation
2014-01-09 Perforation Treatment Performed - Abrasa-Jet Perforation
2014-01-12 Perforation Treatment Performed - Acid Squeeze - Press Used
2014-01-14 Perforation Treatment Performed - Bridge Plug Capped W/Cement
2014-01-14 Perforation Treatment Performed - Cement Plug
2014-01-14 Perforation Treatment Performed - Cement Squeeze
2014-01-14 Plug Back Performed
2014-01-17 Perforation Treatment Performed - Abrasa-Jet Perforation
2014-01-19 Perforation Treatment Performed - Acid Squeeze - Press Used
2014-01-22 Perforation Treatment Performed - Cement Plug
2014-01-22 Perforation Treatment Performed - Cement Squeeze
2014-01-22 Perforation Treatment Performed - Chemical Squeeze
2014-01-22 Plug Back Performed
2015-01-11 Well Abandoned
2015-01-11 Well Mode changed to Abandoned

For data sources see[3]


Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
2004-03-17 Open Hole/Barefoot Completion 2277.00 2320.00 0
2013-02-08 Perforation 833.50 836.50 17
2013-03-05 Cement Squeeze 833.50 836.50 0
2013-03-05 Packing Device Capped w/Cement 816.60 824.90 0
2013-03-11 Perforation 591.00 596.00 17
2013-03-12 Acid Treatment 591.00 596.00 0
2013-03-13 Cement Squeeze 591.00 596.00 0
2013-03-13 Packing Device Capped w/Cement 576.90 585.20 0
2014-01-08 Hydra Jet Perforation 474.90 476.00 0
2014-01-09 Hydra Jet Perforation 474.00 474.90 0
2014-01-12 Acid Treatment 474.00 476.00 0
2004-03-28 Acid Treatment 2277.00 2320.00 0
2014-01-14 Cement Squeeze 474.00 476.00 0
2014-01-14 Cement Plug 470.30 476.00 0
2014-01-14 Packing Device Capped w/Cement 460.00 470.00 0
2014-01-17 Hydra Jet Perforation 451.50 453.50 0
2014-01-19 Acid Treatment 451.50 453.50 0
2014-01-22 Chemical Squeeze 451.50 453.50 0
2014-01-22 Cement Squeeze 451.50 453.50 0
2014-01-22 Cement Plug 374.50 453.50 0
2004-03-29 Packing Device Capped w/Cement 2261.00 2270.00 0
2004-03-30 Perforation 921.00 926.50 17
2012-02-24 Perforation 990.00 992.00 39
2012-02-24 Perforation 989.00 991.00 26
2012-03-14 Cement Squeeze 989.00 992.00 0
2012-03-14 Cement Squeeze 921.00 926.50 0
2012-03-14 Packing Device Capped w/Cement 815.60 999.00 0

For data sources see[4]


Occurences

Occurence Date Occurence Type Occurence Depth (m) Occurence Control Depth (m)
2012-05-05 No Incident Encountered 0.00 0.00
2014-03-20 No Incident Encountered 0.00 0.00

For data sources see[5]

References