X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0936011408000

Well Details

Well ID: 0936011408000
Loading map...
Location: 00/08-14-093-01W6/0
Location Alias: 00/08-14-93-01 W6M
Location Alias 2: 00/08-14-093-01 W6/00
Country: Canada
Province: Alberta
Township: 093
Meridian: 6
Range: 01
Section: 14
County/Municipality: County of Northern Lights
Well Name: CORINTHIAN HOTCHKIS 8-14-93-1
Operator Name: Surge Energy Inc.
License Number: 0138219
License Date: 1989-01-13
License Status: Suspension
Spud Date: 1989-01-23
Final Drill Date: 1989-02-22
Well Total Depth: 2250.00 m
Surface Hole Latitude: 57.066961
Surface Hole Longitude: -118.033055

For data sources see[1][2]

Well History

Date Event
1989-01-13 Obtained License
1989-01-25 Surface Casing Operation Performed
1989-01-28 Well Log Performed
1989-02-18 Drill Stem Test Performed
1989-02-22 Finished Drilling
1989-02-22 Well Mode changed to Drilled and Cased
1989-02-23 Well Log Performed
1989-02-25 Drill Stem Test Performed
1989-02-27 Production Casing Operation Performed
1989-02-28 Rig Released
1989-03-01 Well Log Performed
1989-03-10 Well Log Performed
1989-03-11 Perforation Treatment Performed - Jet Perforation
1989-03-11 Well Log Performed
1989-03-12 Perforation Treatment Performed - Fractured
1989-03-12 Well Began Production
1989-03-12 Well Fluid changed to Crude Oil
1989-03-12 Well Mode changed to Pumping
1989-03-16 Perforation Treatment Performed - Jet Perforation
1989-03-16 Well Log Performed
1989-03-20 Perforation Treatment Performed - Bridge Plug Capped W/Cement
1989-03-20 Plug Back Performed
1989-03-20 Well Fluid changed to Crude Oil
1989-03-20 Well Log Performed
1989-03-20 Well Mode changed to Abandoned Zone
1989-03-21 Well Log Performed
1989-03-22 Perforation Treatment Performed - Jet Perforation
1989-03-24 Perforation Treatment Performed - Acid Squeeze - Press Used
1994-03-04 Perforation Treatment Performed - Jet Perforation
1994-03-07 Perforation Treatment Performed - Cement Squeeze
1994-03-07 Plug Back Performed
1994-03-10 Perforation Treatment Performed - Jet Perforation
1994-04-01 Well Began Injection
1994-04-01 Well Fluid changed to Water
1994-04-01 Well Type changed to Disposal
1995-02-25 Perforation Treatment Performed - Acid Squeeze - Press Used
1996-10-26 Perforation Treatment Performed - Jet Perforation
1998-02-11 Perforation Treatment Performed - Acid Squeeze - Press Used
1999-08-10 Well Log Performed
1999-08-11 Well Log Performed
2000-09-27 Perforation Treatment Performed - Acid Squeeze - Press Used
2005-02-02 Perforation Treatment Performed - Acid Squeeze - Press Used
2005-07-23 Perforation Treatment Performed - Cement Squeeze
2005-07-23 Plug Back Performed
2006-10-16 Perforation Treatment Performed - Acid Squeeze - Press Used
2007-01-04 Perforation Treatment Performed - Acid Squeeze - Press Used
2011-03-17 Perforation Treatment Performed - Acid Squeeze - Press Used
2018-10-31 Well Fluid changed to Water
2018-10-31 Well Mode changed to Suspended
2018-10-31 Well Type changed to Disposal

For data sources see[3]


Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
1989-03-11 Perforation 2133.30 2135.40 14
1994-03-10 Perforation 2160.50 2162.50 20
1994-03-10 Perforation 2164.00 2168.00 20
1994-03-10 Perforation 2177.00 2184.00 20
1995-02-25 Acid Treatment 2160.50 2184.00 0
1996-10-26 Perforation 2150.00 2156.00 18
1998-02-11 Acid Treatment 2150.50 2184.00 0
2000-09-27 Acid Treatment 2084.00 2088.00 0
2005-02-02 Acid Treatment 2150.00 2184.00 0
2005-02-02 Acid Treatment 2084.00 2088.00 0
2005-07-23 Cement Squeeze 2084.00 2088.00 0
1989-03-12 Fracture 2133.30 2135.40 0
2006-10-16 Acid Treatment 2150.00 2184.00 0
2007-01-04 Acid Treatment 2150.00 2184.00 0
2011-03-17 Acid Treatment 2150.00 2184.00 0
1989-03-16 Perforation 2137.50 2141.50 13
1989-03-20 Packing Device Capped w/Cement 2103.70 2112.20 0
1989-03-22 Perforation 2084.00 2088.00 13
1989-03-24 Acid Treatment 2084.00 2088.00 0
1994-03-04 Perforation 2133.30 2135.40 14
1994-03-04 Perforation 2137.50 2141.50 13
1994-03-07 Cement Squeeze 2133.30 2141.50 0

For data sources see[4]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
1989 35 0.0 0.0 0.0
1994 0 0.0 0.0 0.0
1995 0 0.0 0.0 0.0
1996 0 0.0 0.0 0.0
1997 0 0.0 0.0 0.0
1998 0 0.0 0.0 0.0
1999 0 0.0 0.0 0.0
2000 0 0.0 0.0 0.0
2001 0 0.0 0.0 0.0
2002 0 0.0 0.0 0.0
2003 0 0.0 0.0 0.0
2004 0 0.0 0.0 0.0
2005 0 0.0 0.0 0.0
2006 0 0.0 0.0 0.0
2007 0 0.0 0.0 0.0
2008 0 0.0 0.0 0.0
2009 0 0.0 0.0 0.0
2010 0 0.0 0.0 0.0
2011 0 0.0 0.0 0.0
2012 0 0.0 0.0 0.0
2013 0 0.0 0.0 0.0
2014 0 0.0 0.0 0.0
2015 0 0.0 0.0 0.0
2016 0 0.0 0.0 0.0
2017 0 0.0 0.0 0.0
2018 0 0.0 0.0 0.0

For data sources see[5]

Occurences

Occurence Date Occurence Type Occurence Depth (m) Occurence Control Depth (m)
2013-11-03 No Incident Encountered 0.00 0.00

For data sources see[6]

References