X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0934120915120

Well Details

Well ID: 0934120915120
Loading map...
Location: 12/15-09-093-12W4/0
Location Alias: 12/15-09-93-12 W4M
Location Alias 2: 12/15-09-093-12 W4/00
Country: Canada
Province: Alberta
Township: 093
Meridian: 4
Range: 12
Section: 09
County/Municipality: Regional Municipality of Wood Buffalo
Well Name: PC QQ(P) - 6 DOVER 15-9-93-12
Operator Name: Suncor Energy Inc.
License Number: 0375772
License Date: 2007-03-12
License Status: Issued
Spud Date: 2007-08-09
Final Drill Date: 2008-01-15
Well Total Depth: 1243.00 m
Surface Hole Latitude: 57.054435
Surface Hole Longitude: -111.885590

For data sources see[1][2]

Well History

Date Event
2007-03-12 Obtained License
2007-08-11 Surface Casing Operation Performed
2007-12-14 Direction Drilling Operation Performed - Deviate
2007-12-14 Direction Drilling Operation Performed - Horizontal
2007-12-14 Well Log Performed
2007-12-15 Intermediate Casing Operation Performed
2007-12-18 Well Log Performed
2008-01-15 Finished Drilling
2008-01-15 Liner Casing Operation Performed
2008-01-15 Perforation Treatment Performed - Open-Hole Completion
2008-01-15 Perforation Treatment Performed - Slotted Liner or Casing
2008-01-15 Well Log Performed
2008-01-15 Well Mode changed to Drilled and Cased
2008-01-16 Rig Released
2008-01-18 Well Log Performed
2012-12-30 Well Began Production
2012-12-30 Well Type changed to Steam Assisted Gravity Drain
2013-11-11 Perforation Treatment Performed - Acid Squeeze - Press Used
2014-07-26 Perforation Treatment Performed - Acid Squeeze - Press Used

For data sources see[3]

Directional Drilling

Start Date Depth (m) Reason
2007-12-14 107.00 Deviate (5 - 79 degrees)
2007-12-14 233.00 Horizontal

For data sources see[4]

Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
2008-01-15 Slotted Liner 368.00 1240.00 0
2008-01-15 Open Hole/Barefoot Completion 1240.00 1243.00 0
2013-11-11 Acid Treatment 367.60 1240.00 0
2014-07-26 Acid Treatment 368.40 1240.00 0

For data sources see[5]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
2013 2579 0.0 0.0 0.0
2014 7371 0.0 0.0 0.0
2015 8237 0.0 0.0 0.0
2016 6742 0.0 0.0 0.0
2017 7294 0.0 0.0 0.0
2018 8742 0.0 0.0 0.0
2019 7226 0.0 0.0 0.0

For data sources see[6]

Occurences

Occurence Date Occurence Type Occurence Depth (m) Occurence Control Depth (m)
2013-11-13 No Incident Encountered 0.00 0.00
2014-07-26 No Incident Encountered 0.00 0.00

For data sources see[7]

References