X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0925053512000

Well Details

Well ID: 0925053512000
Loading map...
Location: 00/12-35-092-05W5/0
Location Alias: 00/12-35-92-05 W5M
Location Alias 2: 00/12-35-092-05 W5/00
Country: Canada
Province: Alberta
Township: 092
Meridian: 5
Range: 05
Section: 35
County/Municipality: Municipal District of Opportunity No. 17
Well Name: PENGROWTH KIDNEY 12-35-92-5
Operator Name: Highwood Oil Company Ltd.
License Number: 0134948
License Date: 1988-07-15
License Status: Abandoned
Spud Date: 1988-07-26
Final Drill Date: 1988-08-11
Well Total Depth: 1393.00 m
Surface Hole Latitude: 57.026647
Surface Hole Longitude: -114.701274

For data sources see[1][2]

Well History

Date Event
1988-07-15 Obtained License
1988-07-27 Lost Circulation Occurred
1988-07-28 Surface Casing Operation Performed
1988-07-31 Direction Drilling Operation Performed - Deviate
1988-07-31 Lost Circulation Occurred
1988-08-04 Intermediate Casing Operation Performed
1988-08-11 Finished Drilling
1988-08-11 Well Log Performed
1988-08-11 Well Mode changed to Drilled and Cased
1988-08-12 Drill Stem Test Performed
1988-08-12 Well Log Performed
1988-08-13 Drill Stem Test Performed
1988-08-14 Liner Casing Operation Performed
1988-08-14 Rig Released
1988-10-03 Well Log Performed
1988-10-04 Perforation Treatment Performed - Jet Perforation
1988-10-05 Perforation Treatment Performed - Acid Squeeze - Press Used
1988-11-01 Well Began Production
1988-11-01 Well Fluid changed to Crude Oil
1988-11-01 Well Mode changed to Pumping
1992-10-01 Well Fluid changed to Crude Oil
1992-10-01 Well Mode changed to Suspended
1993-04-01 Well Fluid changed to Crude Oil
1993-04-01 Well Mode changed to Pumping
1993-05-13 Well Log Performed
1993-05-14 Perforation Treatment Performed - Jet Perforation
1993-05-15 Perforation Treatment Performed - Acid Squeeze - Press Used
1993-06-01 Well Fluid changed to Crude Oil
1993-06-01 Well Mode changed to Suspended
1994-05-01 Well Fluid changed to Crude Oil
1994-05-01 Well Mode changed to Pumping
1994-09-01 Well Fluid changed to Crude Oil
1994-09-01 Well Mode changed to Suspended
1997-03-20 Well Log Performed
1997-06-01 Perforation Treatment Performed - Bridge Plug Capped W/Cement
1997-06-01 Plug Back Performed
1997-06-02 Perforation Treatment Performed - Bridge Plug Capped W/Cement
1997-06-09 Well Abandoned
1997-06-09 Well Fluid changed to Crude Oil
1997-06-09 Well Mode changed to Abandoned

For data sources see[3]

Directional Drilling

Start Date Depth (m) Reason
1988-07-31 500.00 Deviate (5 - 79 degrees)

For data sources see[4]

Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
1988-10-04 Perforation 1311.50 1312.50 13
1997-06-02 Packing Device Capped w/Cement 487.00 495.00 0
1988-10-04 Perforation 1314.50 1316.80 13
1988-10-05 Acid Treatment 1311.50 1316.80 0
1993-05-14 Perforation 1311.50 1312.50 13
1993-05-14 Perforation 1314.50 1316.80 13
1993-05-15 Acid Treatment 1311.50 1316.80 0
1997-06-01 Packing Device Capped w/Cement 1292.00 1300.00 0
1997-06-01 Packing Device Capped w/Cement 1289.00 1297.00 0
1997-06-01 Packing Device Capped w/Cement 753.00 765.00 0

For data sources see[5]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
1988 1325 0.0 0.0 0.0
1989 8379 0.0 0.0 0.0
1990 8371 0.0 0.0 0.0
1991 8450 0.0 0.0 0.0
1992 1800 0.0 0.0 0.0
1993 1889 0.0 0.0 0.0
1994 1776 0.0 0.0 0.0

For data sources see[6]

Occurences

Occurence Date Occurence Type Occurence Depth (m) Occurence Control Depth (m)
1988-07-27 Lost Circulation 205.00 291.00
1988-07-31 Lost Circulation 457.00 859.00

For data sources see[7]

References