If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.
powered by ChangeDetection
Well ID: 0925042102000 | Loading map...
{"type":"SATELLITE","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"100%","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"wmsoverlay":false,"copycoords":false,"static":false,"zoom":14,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"markercluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","enablefullscreen":false,"scrollwheelzoom":false,"locations":[{"text":"","title":"","link":"","lat":56.990019,"lon":-114.573005,"icon":""}]} |
Location: 00/02-21-092-04W5/0 | |
Location Alias: 00/02-21-92-04 W5M | |
Location Alias 2: 00/02-21-092-04 W5/00 | |
Country: Canada | |
Province: Alberta | |
Township: 092 | |
Meridian: 5 | |
Range: 04 | |
Section: 21 | |
County/Municipality: Municipal District of Opportunity No. 17 | |
Well Name: PRED KIDNEY 2-21-92-4 | |
Operator Name: Highwood Oil Company Ltd. | |
License Number: 0129425 | |
License Date: 1987-10-20 | |
License Status: Suspension | |
Spud Date: 1987-10-20 | |
Final Drill Date: 1987-10-30 | |
Well Total Depth: 1296.00 m | |
Surface Hole Latitude: 56.990019 | |
Surface Hole Longitude: -114.573005 |
Date | Event |
---|---|
1987-10-20 | Obtained License |
1987-10-22 | Surface Casing Operation Performed |
1987-10-23 | Kick Occurred |
1987-10-24 | Intermediate Casing Operation Performed |
1987-10-25 | Kick Occurred |
1987-10-26 | Direction Drilling Operation Performed - Deviate |
1987-10-30 | Finished Drilling |
1987-10-30 | Well Mode changed to Drilled and Cased |
1987-10-31 | Well Log Performed |
1987-11-01 | Liner Casing Operation Performed |
1987-11-01 | Rig Released |
1987-11-03 | Well Log Performed |
1987-12-04 | Well Log Performed |
1987-12-05 | Perforation Treatment Performed - Jet Perforation |
1987-12-07 | Perforation Treatment Performed - Remedial Casing |
1987-12-07 | Well Log Performed |
1987-12-08 | Perforation Treatment Performed - Jet Perforation |
1987-12-09 | Perforation Treatment Performed - Acid Squeeze - Press Used |
1987-12-12 | Perforation Treatment Performed - Cement Squeeze |
1987-12-13 | Well Log Performed |
1987-12-14 | Perforation Treatment Performed - Jet Perforation |
1987-12-16 | Perforation Treatment Performed - Acid Squeeze - Press Used |
1987-12-17 | Perforation Treatment Performed - Acid Squeeze - Press Used |
1988-01-07 | Well Began Production |
1988-01-07 | Well Fluid changed to Crude Oil |
1988-01-07 | Well Mode changed to Pumping |
1989-11-24 | Perforation Treatment Performed - Chemical Squeeze |
1994-02-01 | Well Fluid changed to Crude Oil |
1994-02-01 | Well Mode changed to Suspended |
1995-05-01 | Well Fluid changed to Crude Oil |
1995-05-01 | Well Mode changed to Pumping |
1996-08-01 | Well Fluid changed to Crude Oil |
1996-08-01 | Well Mode changed to Suspended |
1996-08-11 | Perforation Treatment Performed - Acid Squeeze - Press Used |
1996-08-12 | Well Log Performed |
1996-08-13 | Perforation Treatment Performed - Bridge Plug Capped W/Cement |
1996-08-13 | Plug Back Performed |
1996-08-13 | Well Fluid changed to Crude Oil |
1996-08-13 | Well Mode changed to Abandoned and Whipstocked |
2008-02-19 | Well Log Performed |
2008-02-25 | Perforation Treatment Performed - Bridge Plug Capped W/Cement |
For data sources see[3]
Start Date | Depth (m) | Reason |
---|---|---|
1987-10-26 | 1007.00 | Deviate (5 - 79 degrees) |
For data sources see[4]
Perforation Date | Perforation Type | Interval Top (m) | Interval Base (m) | Number of Shots |
---|---|---|---|---|
1987-12-05 | Perforation | 1242.00 | 1242.50 | 13 |
1996-08-11 | Acid Treatment | 1236.40 | 1238.40 | 0 |
1996-08-13 | Packing Device Capped w/Cement | 1222.00 | 1230.00 | 0 |
2008-02-25 | Packing Device Capped w/Cement | 668.50 | 704.00 | 0 |
1987-12-07 | Remedial Casing Cementing | 1242.00 | 1242.50 | 0 |
1987-12-08 | Perforation | 1236.50 | 1239.50 | 13 |
1987-12-09 | Acid Treatment | 1236.50 | 1239.50 | 0 |
1987-12-12 | Cement Squeeze | 1236.50 | 1239.50 | 0 |
1987-12-14 | Perforation | 1236.40 | 1238.40 | 13 |
1987-12-16 | Acid Treatment | 1236.40 | 1238.40 | 0 |
1987-12-17 | Acid Treatment | 1236.40 | 1238.40 | 0 |
1989-11-24 | Chemical Squeeze | 1236.40 | 1238.40 | 0 |
For data sources see[5]
Period | Total Production Hours | Gas Quantity (m3) | Oil Quantity (m3) | Water Quantity (m3) |
---|---|---|---|---|
1988 | 5938 | 0.0 | 0.0 | 0.0 |
1989 | 7994 | 0.0 | 0.0 | 0.0 |
1990 | 7839 | 0.0 | 0.0 | 0.0 |
1991 | 7890 | 0.0 | 0.0 | 0.0 |
1992 | 8143 | 0.0 | 0.0 | 0.0 |
1993 | 6189 | 0.0 | 0.0 | 0.0 |
1994 | 164 | 0.0 | 0.0 | 0.0 |
1995 | 1336 | 0.0 | 0.0 | 0.0 |
1996 | 103 | 0.0 | 0.0 | 0.0 |
For data sources see[6]
Occurence Date | Occurence Type | Occurence Depth (m) | Occurence Control Depth (m) |
---|---|---|---|
1987-10-23 | Kick | 460.00 | 460.00 |
1987-10-23 | Kick | 679.00 | 679.00 |
1987-10-25 | Kick | 801.00 | 801.00 |
For data sources see[7]